background image

4

AU

Telephone Helpline: 1300225960

Installation

Note: If the unit has not been 

stored or moved in an upright 

position, let it stand upright for 

approximately 12 hours before 

operation. If in doubt allow to 

stand.

1.  Remove the appliance from the packaging. 

Make sure that all protective plastic film and 

coatings are thoroughly removed from all 

surfaces.

2.  Maintain a distance of 20cm (7 inches) 

between the unit and walls or other objects for 

ventilation. 

NEVER LOCATE NEXT TO OR 

NEAR A HEAT SOURCE. 

Note: Before using the appliance 

for the first time, clean the 

shelves and interior with soapy 

water.

Operation

Storing Food

To get the best results from your POLAR appliance, 

follow these instructions:

•  It is important that food entering the Blast 

Chiller/Freezer does not exceed a temperature 

of 90°C. 

•  It is recommended that metal containers / 

trays are used as other materials such as 

plastic or polystyrene containers will act as an 

insulator and extend blast chilling times.

•  Sufficient space must be left between products 

in order to guarantee a sufficient flow of cold 

air. Ensure product is not in contact with the 

internal walls of the unit, and leave sufficient 

gaps between trays.

•  Never obstruct the inlet of the evaporator fans.

•  Products that are more difficult to chill because 

of their composition and size should be placed 

in the centre of the unit.

•  Blast chilling data refers to standard products 

(low fat content) with a thickness below  

50 mm: therefore avoid overlaying products 

on trays or the insertion of pieces with a 

much higher thickness, as this will lead to 

an extension of blast chilling times. Always 

distribute the product well on the trays and in 

the case of thick pieces decrease the amount 

to blast chill.

•  Limit the number of times and the duration of 

time the doors are opened.

•  The chiller should be used for storage for short 

periods only.

•  When removing product that has undergone 

blast chilling/shock freezing, always wear 
gloves to protect the hands from cold burns.

Introduction

The appliance has the following operational states:

On

•  The appliance is switched on and 

an operating cycle is running

Standby

•  The appliance is switched on but 

no operating cycle is running

Off

•  The appliance is not switched on

•  If power is interrupted during a timed blast 

chilling operation, when power is restored, 

chilling will continue from the time point 

at which the interruption occurred (with a 

maximum error of 10 minutes).

•  If power is interrupted during a set-

temperature blast chilling operation, when 

power is restored, chilling will start again from 

the beginning.

•  If power is interrupted during a storage 

operation, when power is restored the storage 

operation will be reset.

•  If power is interrupted while in “stand-by” 

mode, when power is re- stored the device will 

be in the same state.

Turn On

1.  Ensure the power switch is set to [O] and turn 

on at the socket.

2.  Switch on the Power [I]. This will place the 

unit in standby whilst waiting for the cycle to 

be selected. 

CK640-A_A5_v1_20190507.indb   4

2019/5/7   15:55

Содержание CK640-A

Страница 1: ...Model CK640 A Blast Chiller Freezer Instruction manual CK640 A_A5_v1_20190507 indb 1 2019 5 7 15 55 ...

Страница 2: ...nces inside the appliance e g heaters ice cream makers etc DO NOT allow oil or fat to come into contact with the plastic components or door seal Clean immediately if contact occurs Always carry store and handle the appliance in a vertical position and move by holding the base of the appliance Always switch off and disconnect the power supply to the unit before cleaning Keep all packaging away from...

Страница 3: ... than those recommended by the manufacturer Warning Do not damage the refrigerant circuit Warning Do not use electrical appliances inside the food storage compartments of the appliance unless they are the type recommended by the manufacturer Product Description CK640 A POLAR Blast Chiller Freezer Introduction Please take a few moments to carefully read through this manual Correct maintenance and o...

Страница 4: ...at content with a thickness below 50 mm therefore avoid overlaying products on trays or the insertion of pieces with a much higher thickness as this will lead to an extension of blast chilling times Always distribute the product well on the trays and in the case of thick pieces decrease the amount to blast chill Limit the number of times and the duration of time the doors are opened The chiller sh...

Страница 5: ...f this is ongoing the temperature measured by the pin probe if a set temperature chilling operation is ongoing the temperature of the cabinet if storage is ongoing In stand by mode during normal operation the display shows the temperature of the cabinet for second every 3 seconds Signals LED Message Timed Chilling LED If on and the LED is off a timed chilling operation is ongoing If on and the LED...

Страница 6: ...ashing the unit of measurement of magnitude displayed is the minute d Defrosting or drip draining is ongoing Operational Cycles The device has the following operational cycles Timed positive chilling and storage Timed negative chilling and storage Set temperature positive chilling and storage Set temperature negative chilling and storage Set temperature cycles are preceded by a test step in order ...

Страница 7: ... Once the chilling period has elapsed the device switches to storage mode the display shows the message End the buzzer sounds for the period of time set by parameter AA press any key to mute the buzzer press once more to cancel the message End During storage the display shows the cabinet temperature the LEDs and are on the parameter r9 sets the operational set point press several times to display ...

Страница 8: ...rting the cycle A test is run in order to check correct pin probe insertion if the outcome of the test is positive the cycle will be started if the outcome of the test is negative the cycle will be started in timed mode To start the cycle ensure the device is in stand by mode and no procedures are running press to select PoS and ensure the LED is flashing press or within 15 seconds to change the v...

Страница 9: ...ature measured by the pin probe reaches the chilling endpoint temperature the device switches to storage mode the LED will continue to flash and the LED will stay on the display will show the message End the buzzer will sound for the period of time set by parameter AA press any key to mute the buzzer press once more to cancel the message End During storage the display shows the cabinet temperature...

Страница 10: ... by the pin probe reaches the chilling endpoint temperature prior to expiry of the maximum chilling time duration the device will switch to storage mode the display will show the message End the buzzer will sound for the period of time set by parameter AA press any key to mute the buzzer press once more to cancel the message End If the temperature measured by the pin probe does not reach the chill...

Страница 11: ...the temperature measured by the pin probe the temperature of the cabinet is greater than the value set by parameter rc at least 3 times out of 5 the comparison is made every 10 s if parameter rc is set to 0 neither the first nor second stages will be run The outcome of the second stage is positive if the difference temperature measured by the pin probe temperature of the cabinet is greater by at l...

Страница 12: ...the appliance POLAR recommend that a POLAR agent or qualified technician clean the condenser Cleaning the water pan The water pan is located underneath the evaporator at the back of the unit To remove it for cleaning simply slide out when necessary Alarms Code Message Remedies Consequences AL Minimum temperature alarm Check the cabinet temperature Check parameters A1 and A2 The device will continu...

Страница 13: ...storage operation Parameter C11 is set to 0 the compressor activity will depend on parameters C4 C5 and C6 If parameter C11 is set to 1 the pin probe will function as the cabinet probe and the storage operation will continue Pr2 Pin probe error The same as for the previous case but in relation to the pin probe Consequences if the error occurs while in stand by mode Only timed operation cycles will...

Страница 14: ...pliances must be earthed If in doubt consult a qualified electrician Electrical isolation points must be kept clear of any obstructions In the event of any emergency disconnection being required they must be readily accessible Compliance The product must not be disposed of as household waste To help prevent possible harm to human health and or the environment the product must be disposed of in an ...

Страница 15: ...2 2016 EN55014 1 2006 A1 2009 A2 2011 EN55014 2 2015 EN61000 3 2 2014 EN61000 3 3 2013 Producer Name Polar Producer Address 15 Badgally Road Campbelltown NSW 2560 I the undersigned hereby declare that the equipment specified above conforms to the above Legislation and Standard s Date 24th April 2019 Signature Full Name Ashley Hooper Position Technical Quality Manager Responsible Supplier CK640 A_A...

Страница 16: ...CK640 A_A5_v1_20190507 http www polar refrigerator com CK640 A_A5_v1_20190507 indb 16 2019 5 7 15 55 ...

Отзывы: