SHEET INDEX

SHEET NO. GENERAL DESCRIPTION

1

G-1  TITLE SHEET

2

C-1  SITE IMPROVEMENT PLAN

USE OF PLANS

THIS DRAWING IS PROVIDED IN AN ELECTRONIC FORMAT (ON COMPUTER DISK) AS A COURTESY IF REQUESTED BY THE USER.
THE DELIVERY OF THE ELECTRONIC FILE DOES NOT CONSTITUTE THE DELIVERY OF OUR PROFESSIONAL WORK PRODUCT.
THE SIGNED HARD COPY PREPARED FOR THE PROJECT CONSTITUTES OUR PROFESSIONAL WORK PRODUCT AND THE HARD
COPY MUST BE  REFERRED TO FOR THE CORRECT DESIGN INFORMATION.  THESE PLANS HAVE BEEN PREPARED  SOLELY FOR

USE FOR THE PROJECT SCOPE AND SITE SPECIFICALLY IDENTIFIED HEREON AT THE TIME THESE PLANS ARE SIGNED.  THE
ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR,  USE OF ANY PART OF THESE PLANS,
INCLUDING ANY NOTE OR DETAIL, FOR ANY UNAPPROVED OR REVISED PROJECT SCOPE,  OR FOR ANY OTHER PROJECT AT

THIS OR ANY OTHER SITE.  USER AGREES TO INDEMNIFY AND HOLD HARMLESS F&A FOR ALL COSTS AND DAMAGES IF USED.

USE OF ELECTRONIC INFORMATION

ELECTRONIC INFORMATION MAY BE PROVIDED BY THE ENGINEER FOR CONVENIENCE; UNDER NO CIRCUMSTANCES SHALL
DELIVERY OF ELECTRONIC FILES FOR USE BY OTHERS BE DEEMED A SALE BY THE ENGINEER AND THE ENGINEER MAKES NO

WARRANTIES, EITHER EXPRESS OR IMPLIED, OF MERCHANTABILITY AND FITNESS FOR ANY PARTICULAR PURPOSE.  IN NO

EVENT SHALL THE ENGINEER BE LIABLE FOR INDIRECT OR CONSEQUENTIAL DAMAGES AS A RESULT OF THE USE OR REUSE OF

THE ELECTRONIC FILES BY OTHERS.

ELECTRONIC INFORMATION IS INTENDED TO PROVIDE INFORMATION SUPPLEMENTAL AND SUBORDINATE TO THE
CONSTRUCTION CONTRACT DOCUMENTS.  LAYOUT AND CONSTRUCTION OF PROJECT ELEMENTS SHALL BE BASED ON
DIMENSIONS AND INFORMATION INCLUDED ON THE SIGNED AND SEALED CONSTRUCTION CONTRACT DOCUMENTS WHICH
SHALL CONTROL OVER ELECTRONIC INFORMATION.  USER IS RESPONSIBLE FOR CONFIRMING LOCATION OF PROPOSED
IMPROVEMENTS BASED ON DIMENSIONS AND INFORMATION INCLUDED ON THE CONSTRUCTION CONTRACT DOCUMENTS;
INCONSISTENCIES BETWEEN THE ELECTRONIC INFORMATION AND THE CONSTRUCTION CONTRACT DOCUMENTS SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION PRIOR TO CONSTRUCTION.

PROJECT ELEMENTS SUCH AS MANHOLES, CATCH BASINS, UTILITY VAULTS, VALVE ASSEMBLIES, STAIRS, RAMPS, WALLS, ETC.

ARE SHOWN SCHEMATICALLY IN THE ELECTRONIC INFORMATION AND CONSTRUCTION OF THESE ELEMENTS SHALL BE IN
ACCORDANCE WITH THE CONSTRUCTION NOTES AND DETAILS PRESENTED OR REFERENCED IN THE SIGNED AND SEALED

CONSTRUCTION CONTACT DOCUMENTS.  IMPROVEMENTS CONSTRUCTED BASED ON ELECTRONIC INFORMATION AND IN
CONFLICT WITH THE DRAWING DIMENSIONS DETAILS, AND THE CONSTRUCTION CONTRACT DOCUMENTS SHALL BE REMOVED

AND CONSTRUCTED IN THE PROPER LOCATION AND DIMENSIONS AT CONTRACTOR'S SOLE EXPENSE.

DIGITAL DRAWINGS ARE TYPICALLY A COMPILATION OF DRAWINGS FROM A NUMBER OF SOURCES AND, AS SUCH, THERE IS
INFORMATION IN THE ELECTRONIC FILE ISSUED BY THE ENGINEER THAT WAS NOT DEVELOPED BY THE ENGINEER AND IS NOT

AUTHORIZED BY THE ENGINEER FOR USE BY OTHERS.  ELECTRONIC INFORMATION PROVIDED BY THE ENGINEER SHALL ONLY

BE APPLICABLE FOR IMPROVEMENTS DESIGNED BY THE ENGINEER AND WHICH ARE SPECIFICALLY DESIGNATED BY
CONSTRUCTION NOTES AND/OR DETAILS ON THE SIGNED AND SEALED CONTRACT DOCUMENTS.

IF DIGITAL FILES ARE OBTAINED WITH THE INTENT TO USE THEM FOR PROJECT STAKING, THEY SHALL ONLY BE USED BY A

QUALIFIED ENGINEER OR LAND SURVEYOR REGISTERED IN THE STATE OF CALIFORNIA.  DIGITAL INFORMATION SHALL ONLY BE

USED FOR STAKING HORIZONTAL LOCATION OF PROPOSED IMPROVEMENTS AFTER IT HAS BEEN CONFIRMED WITH THE
SIGNED AND SEALED CONSTRUCTION CONTRACT DOCUMENTS.

THE DIGITAL DRAWINGS ARE NOT INTENDED TO BE USED DIRECTLY FOR CONTROL OF CONTRACTOR'S GRADING OPERATIONS
WITHOUT STAKING BY ENGINEER OR LAND SURVEYOR.  THE INTERSECTION OF PROPOSED CUT AND FILL SLOPES WITH

EXISTING GRADE IS APPROXIMATE WHERE SHOWN ON THE DRAWINGS AND SHALL BE CONFIRMED BY FIELD STAKING.  IT IS

THE CONTRACTOR'S RESPONSIBILITY TO CONSTRUCT SLOPES IN CONFORMANCE WITH THE SPECIFIED AND DETAILED

REQUIREMENTS CONTAINED IN THE CONTRACT DOCUMENTS.

BENCHMARK:

HORIZONTAL BASIS OF COORDINATES ARE NAD83 PER CAMARILLO HEIGHTS ELEMENTARY CONTROL POINTS 1, 2, 3.

VERTICAL DATUM IS NAD88 PER CAMARILLO HEIGHTS ELEMENTARY CONTROL POINT 1.

ELEVATION =  270.05'

CAUTION!

CONFIRM BENCHMARK DATA AND CONDITION WITH PROJECT SURVEYOR (WATERS CARDENAS LAND
SURVEYING, LLP) PRIOR TO USE.

TOPOGRAPHY:

EXISTING TOPOGRAPHY COMPILED BY FIELD SURVEY(S) BY WATERS CARDENAS LAND SURVEYING, LLP DATED MARCH, 2021 &

JANUARY, 2022.

SURVEY MONUMENT PROTECTION:

PROTECT AND PRESERVE, IN PLACE, ALL SURVEY MONUMENTS AND BENCHMARKS.  DO NOT DISTURB, MOVE, OR RELOCATE
MONUMENTS OR BENCHMARKS WITHOUT THE PRIOR REVIEW AND APPROVAL BY THE AGENCY HAVING JURISDICTION OVER

THE MONUMENT OR BENCHMARK.  THE CONTRACTOR SHALL CONTRACT WITH A LICENSED SURVEYOR FOR MONUMENTS

REQUIRING DISTURBANCE OR REMOVAL, AND THE SURVEYOR SHALL RESET THE MONUMENTS OR PROVIDE PERMANENT

WITNESS MONUMENTS AND FILE THE REQUIRED DOCUMENTATION WITH THE COUNTY SURVEYOR PURSUANT TO BUSINESS
AND PROFESSIONAL CODE SECTION 8771.

MAIN PLAYGROUND REPLACEMENT PLANS

CAMARILLO HEIGHTS ELEMENTARY SCHOOL

35 CATALINA DRIVE, CAMARILLO, CA 93010

CITY OF CAMARILLO, CALIFORNIA

W.O. 2002C

TITLE SHEET

MAIN PLAYGROUND REPLACEMENT PLANS

CAMARILLO HEIGHTS ELEMENTARY SCHOOL

35 CATALINA DRIVE

1

G-1

04/20/2022

2

SHT.           OF       

DESCRIPTION

REVISIONS

NO.

DATE

DATE:

2002_MAIN PLAYGROUND IMPROVEMENTS.DWG

PLOTTED: Thursday, April 21, 2022 11:13:31 AM

BY:

DATE:

F

A

IA

I

201 N. Calle Cesar Chavez, Suite 100

Santa Barbara, CA 93103

Telephone (805) 966-2224

No. 71335

C

IV

I

L

  

  

4/20/2022

GRADING AND PAVING SPECIFICATIONS:

10

100.00

 100.00

W

10

LEGEND:

DESCRIPTION

EXISTING

PROPOSED

CENTERLINE

EDGE OF A.C. PAVEMENT

ELEVATION

CONCRETE PAVEMENT

A.C. PAVEMENT

PROPERTY LINE

RIGHT-OF-WAY LINE

EASEMENT LINE

CONTOURS (MAJOR)

CONTOURS (MINOR)

BENCH MARK

TREE CANOPY

APPROX. SAW CUT LINE

LIMIT OF GRADING LINE

GRADE BREAK LINE

FLOW LINE

FENCE

WATER

STORM DRAIN

12

12

 (100.00)

OR

W

SD

SD

GB

SITE

VICINITY MAP

NOT TO SCALE

A.

STANDARD SPECIFICATIONS:

1.

EXCEPT  AS  MODIFIED  OR  OTHERWISE  SPECIFIED  ON  THE  DRAWINGS  OR  HEREIN,  CONSTRUCTION  MATERIALS  AND
METHODS  SHALL  CONFORM  WITH  THE 

STANDARD  SPECIFICATIONS  FOR  PUBLIC  WORKS  CONSTRUCTION  (SSPWC),

2018 EDITION

, PUBLISHED BY BUILDING NEWS, INC.

B.

GEOTECHNICAL ENGINEER:

1.

A GEOTECHNICAL INVESTIGATION HAS NOT BEEN PERFORMED FOR THIS PROJECT.

C.

LICENSED LAND SURVEYOR:

1.

A  LICENSED SURVEYOR   SHALL LAY  OUT  THE  WORK,  SET  GRADE STAKES, CHECK  FORMS  AND  CHECK SURFACE  OF

PAVEMENT BASE COURSES.

D.

EARTHWORK QUANTITIES:

1.

CONTRACTOR  SHALL  PERFORM  AN  INDEPENDENT  EARTHWORK  QUANTITY  ANALYSIS  ON  WHICH  TO  BASE  HIS  BID.
CONTRACTOR  SHALL  NOT  BE  RELIEVED  OF  LIABILITY  UNDER  THE  CONTRACT  FOR  ANY  LOSS  HE  MAY  SUSTAIN  AS  A
RESULT  OF  ANY  VARIANCE  BETWEEN  HIS  EARTHWORK  ESTIMATES  AND  THE  ACTUAL  EARTHWORK  QUANTITIES
REQUIRED  TO  ACCOMPLISH  GRADING  AS  SPECIFIED  HEREIN  AND  AS  NECESSARY  FOR  CONSTRUCTION  OF

IMPROVEMENTS TO THE FINISH GRADES OR PAVEMENT SUBGRADES CALLED FOR ON THE DRAWINGS.

E:

DUST CONTROL:

1.

CONTRACTOR  SHALL  BE  RESPONSIBLE  FOR  CONTROL  OF  DUST  DURING  THE  ENTIRE  CONSTRUCTION  PERIOD  AND
FOR ANY DAMAGE CAUSED BY DUST RESULTING FROM CONTRACTOR'S OPERATIONS.

2.

EMPLOY  LABOR,  EQUIPMENT  AND  METHODS  REQUIRED  TO  PREVENT  CONSTRUCTION  OPERATIONS  FROM
PRODUCING  DUST  DAMAGING  TO  PERSONS,  PROPERTY,  VEGETATION  AND  ANIMALS  OR  CAUSING  A  NUISANCE  TO
PERSONS OCCUPYING BUILDINGS IN THE VICINITY OF THE JOB SITE.  CONTINUE DUST ABATEMENT MEASURES UNTIL

AUTHORIZED BY THE OWNER'S REPRESENTATIVE TO DISCONTINUE THEM.

3.

DURING  TIMES OF EARTH DISTURBANCE  OR  MOVEMENT,  MONITOR THE  AMOUNT  OF DUST  RAISED  BY THE ACTIVITY

AND WATER THE AREAS BEING DISTURBED AS NEEDED TO PREVENT DUST FROM LEAVING THE PROJECT SITE.

4.

ENSURE  THAT  TRUCKS  TRANSPORTING  MATERIAL  FORM  THE  SITE  ARE  TARPED  BEFORE  LEAVING  THE  SITE  WITH

TARPS SUFFICIENTLY SECURE TO REMAIN TARPED TO THE POINT OF DISPOSAL.

5.

COVER STOCKPILED SOIL MATERIALS AS REQUIRED TO PREVENT WIND-BLOWN DUST.

F:

EROSION AND SEDIMENTATION CONTROL:

1.

PROVIDE  STORM  WATER  POLLUTION  PREVENTION  MATERIALS  AND  METHODS  IN  ACCORDANCE  WITH  THE
CONSTRUCTION  BMP  ONLINE  HANDBOOK,  JANUARY  2015  EDITION,  AVAILABLE  ONLINE  FROM  THE  CALIFORNIA

STORMWATER QUALITY ASSOCIATION.

2.

CONTRACTOR SHALL BE RESPONSIBLE FOR CONTROL OF EROSION AND SEDIMENT TRANSPORT DURING THE ENTIRE
CONSTRUCTION  PERIOD AND FOR ANY  DAMAGE CAUSED BY  EROSION OR SEDIMENT  TRANSPORT RESULTING FROM
CONTRACTOR'S OPERATIONS.

G:

CLEARING AND GRUBBING:

1.

PRIOR TO COMMENCING GRADING OR TRENCHING OPERATIONS, CLEAR THE EXISTING GROUND SURFACE OF AREAS

TO  BE  GRADED  OR  TRENCHED  OF  ALL  VEGETATION  (EXCEPT  TREES  INDICATED  ON  THE  DRAWINGS  TO  REMAIN),
WHETHER LIVING OR DEAD, INCLUDING ROOTS AND ROOT STRUCTURES, AS WELL AS ALL TRASH AND DEBRIS, UNDER
THE OBSERVATION OF THE GEOTECHNICAL ENGINEER.

2.

PRIOR  TO  COMMENCING  GRADING  OR  TRENCHING  OPERATIONS,  EXCAVATE  AND  REMOVE  FROM  AREAS  TO  BE
GRADED  OR  TRENCHED  ALL  EXISTING  UNDOCUMENTED  OR  NON-COMPLYING  FILL  AND  SOIL  CONTAINING  DEBRIS,
ORGANICS, PAVEMENT AND OTHER UNSUITABLE MATERIAL, AS DETERMINED BY THE GEOTECHNICAL ENGINEER.

3.

IF,  DURING  THE  REMOVAL  AND  SCARIFICATION  PROCESS,  EXCESSIVE  ROOT  STRUCTURES  ARE  ENCOUNTERED,

THESE AREAS SHALL BE DEEP RIPPED IN TWO DIRECTIONS TO THE DEPTH OF THE ROOT STRUCTURE AFTER WHICH
THE DISTURBED SOILS AND THE ROOTS SHALL BE COMPLETELY REMOVED AND THE RESULTING CAVITIES SHALL BE
SCARIFIED  AND  PROCESSED  TO  RECEIVE  FILL  IN  ACCORDANCE  WITH  RECOMMENDATIONS  OF  THE  GEOTECHNICAL

ENGINEER.

H:

GRADING:

1.

GRADING WORK INCLUDES, BUT IS NOT NECESSARILY LIMITED TO, THE FOLLOWING:

·

ALL EXCAVATION TO THE GRADES SHOWN ON OR INDICATED BY THE DRAWINGS AND AS SPECIFIED HEREIN.

·

ALL EARTH FILL TO THE GRADES SHOWN ON OR INDICATED BY THE DRAWINGS AND AS SPECIFIED HEREIN.

·

ALL  IMPORT  AND  EXPORT  OF  EARTH  MATERIAL  AS  REQUIRED  TO  ACCOMPLISH  THE  FINISH  GRADES  AND

PAVEMENT SUBGRADES SHOWN ON OR INDICATED BY THE DRAWINGS AND AS SPECIFIED HEREIN.

·

ALL CONDITIONING, PLACEMENT, COMPACTION AND RECOMPACTION OF EARTHWORK.

2.

ON-SITE  SOILS  FREE  OF  OVERSIZE  ROCKS  AND  IRREDUCIBLE  MATERIAL  (OVER  3  INCHES  IN  LARGEST  DIMENSION),
TRASH  AND  DEBRIS,  ORGANICS  AND  DELETERIOUS  MATERIALS  MAY  BE  USED  AS  FILL,  SUBJECT  TO  PRIOR  REVIEW

AND  APPROVAL  BY  THE  GEOTECHNICAL  ENGINEER.    IF  IMPORTED  SOIL  IS  NECESSARY,  THE  MATERIAL  SHALL  BE

GRANULAR AND NON-EXPANSIVE, EQUAL OR SUPERIOR IN QUALITY TO THE ON-SITE SOILS, AS DETERMINED BY THE
GEOTECHNICAL ENGINEER PRIOR TO IMPORTATION OF THE FILL MATERIAL TO THE SITE.

3.

BEFORE PLACING ANY FILL MATERIAL, REQUEST REVIEW OF THE EXPOSED IN-PLACE SOILS BY, AND PREPARE THESE
SOILS TO RECEIVE FILL AS RECOMMENDED BY, THE GEOTECHNICAL ENGINEER, INCLUDING:

·

CORRECTING ANY SOFT, OVERWET OR PUMPING AREAS, AS RECOMMENDED

·

OVEREXCAVATING  OR  SCARIFYING,  MOISTURE  CONDITIONING,  AND  RECOMPACTING  AS  RECOMMENDED  AND

AT LEAST THE UPPER 9 INCHES TO AT LEAST 90% OF MAXIMUM DENSITY.

4.

PLACE  FILL  MATERIAL  IN  LAYERS  THAT  CAN  BE  COMPACTED  WITH  THE  EQUIPMENT  BEING  USED  AND  AS  REQUIRED
BY  THE  GEOTECHNICAL  ENGINEER  BUT  NOT  MORE  THAN  6  INCHES  IN  LOOSE  THICKNESS.    AFTER  EACH  LAYER  HAS

BEEN CONDITIONED AND PLACED, COMPACT THE MATERIAL TO THE FOLLOWING DENSITIES:

·

STRUCTURAL FILL NOT OTHERWISE SPECIFIED: MINIMUM 90% OF MAXIMUM DENSITY

·

UPPER 12” OF AREAS TO RECEIVE LANDSCAPING BUT NO OTHER SURFACE IMPROVEMENTS: 85% OF MAXIMUM
DENSITY

·

BASE COURSE AND UPPER 9” OF SUBGRADE SOIL BENEATH BASE COURSE IN PAVEMENT AND WALKWAY AREAS:
MINIMUM 95% OF MAXIMUM DENSITY

I:

ASPHALT CONCRETE PAVING:

1.

AGGREGATE  BASE  MATERIAL  SHALL  BE  CRUSHED  AGGREGATE  BASE  CONFORMING  TO  SECTION  200-2.4  OF  THE

STANDARD SPECIFICATIONS (SSPWC).

2.

ASPHALT  CONCRETE  SHALL  BE  THE  PRODUCT  OF  MIXING  MINERAL  AGGREGATE  AND  A  MAXIMUM  OF  15  PERCENT

RECLAIMED  ASPHALT  PAVEMENT  (RAP)  WITH  PAVING  ASPHALT,  IN  CONFORMANCE  WITH  SECTION  203-6  OF  THE
STANDARD SPECIFICATIONS (SSPWC).

3.

PAVING  ASPHALT  SHALL  BE  PERFORMANCE  GRADE  PG  64-10,  IN  CONFORMANCE  WITH  SECTION  203-1  OF  THE
STANDARD SPECIFICATIONS (SSPWC).

4.

ASPHALT CONCRETE DESIGNATED BY CLASS AND GRADE FOR VARIOUS APPLICATIONS SHALL BE AS FOLLOWS:

·

FINISH COURSE, TRAFFIC:

C2- PG 64-10-RAP

·

BASE COURSE, TRAFFIC:

B-PG 64-10-RAP

(IF MORE THAN ONE LAYER)

·

OVERLAY, TRAFFIC:

C2-PG 64-10-RAP

5.

PAINT  BINDER  FOR  TACK  COAT  SHALL  BE  SS-1H  EMULSIFIED  ASPHALT  CONFORMING  TO  SECTION  203-3  OF  THE
STANDARD  SPECIFICATIONS  (SSPWC).    APPLY  A  PAINT  BINDER  OF  ASPHALTIC  EMULSION  AT  THE  RATE  OF  0.15
GALLONS  PER  SQUARE  YARD  OF  SURFACE  TO  EXISTING  VERTICAL  SURFACES  AGAINST  WHICH  PAVING  WILL  BE
PLACED AND BETWEEN PAVEMENT COURSES CONSTRUCTED MORE THAN 24 HOURS APART.

6.

MATERIALS  FOR  SEALCOAT  SHALL  CONFORM  TO  SECTION  203-9  OF  THE  STANDARD  SPECIFICATIONS  (SSPWC).

GUARDTOP

 IS ACCEPTED BY SCHOOL DISTRICT FOR USE IN SEALCOAT APPLICATIONS.

7.

BEFORE  ORDERING  DELIVERY  OF  A.C.  PAVEMENT,  CONFIRM  BY  SURVEY  THAT  THE  FINISH  SURFACE  OF  THE  BASE
COURSE  FOR  PAVEMENTS  AND  FOR  PAVEMENT-RELATED  STRUCTURES  SHALL  NOT  VARY  MORE  THAN  ½  INCH  (0.04
FOOT)  FROM  THE  DESIGN  ELEVATION,  SLOPE  AND  CROSS-SECTION,  ESTABLISHED  WITH  DUE  ALLOWANCE  FOR

THICKNESS OF SURFACING.  VARIATIONS WITHIN THE SPECIFIED TOLERANCE SHALL BE COMPENSATING SUCH THAT
THE AVERAGE ELEVATION, SLOPE, AND CROSS-SECTION CONFORM TO THOSE SPECIFIED PER PLAN.

8.

AFTER  CONSTRUCTION  OF  A.C.  PAVEMENT  AND  APPURTENANT  CONCRETE  FEATURES  BUT  BEFORE  SEAL  COATING
AND PAINTING STRIPING AND MARKINGS, CONDUCT A FLOOD TEST TO REVIEW SURFACE DRAINAGE, AS FOLLOWS:

·

SUPPLY  AND  DISCHARGE  WATER  IN  SUFFICIENT  QUANTITY  TO  COMPLETELY  WET  AND  COVER  ALL  A.C.
PAVEMENT AND CONCRETE GUTTER AREAS AND ALLOW TO  DRAIN/DRY FOR ONE HOUR  AT 70º  F OR WARMER.
MARK  THE  OUTLINE  LIMITS  OF  RESIDUAL  STANDING  WATER  DEEP  ENOUGH  TO  COVER  A  5  CENT  PIECE,  OR
DEEPER.

·

REMOVE AND REPLACE A.C. PAVEMENT AND CONCRETE GUTTER IMPROVEMENTS AT NO ADDITIONAL COST TO

THE  OWNER,  AS  NECESSARY  TO  PROVIDE  POSITIVE  SURFACE  DRAINAGE  AND  TO  PREVENT  PONDING  OF
WATER  ON  PAVEMENT  SURFACES  AND  IN  GUTTERS.    SUBSTITUTION  OF  ASPHALT  CONCRETE  SKIN  PATCH  IN

LIEU OF REMOVAL AND REPLACEMENT OF PAVEMENT SHALL BE AT SOLE DISCRETION OF THE OWNER.

·

CONDUCT ADDITIONAL FLOOD TESTING TO CONFIRM SUCCESS OF CORRECTIVE MEASURES.

9.

NOT SOONER THAN 10 DAYS AFTER COMPLETION OF PAVING, CONSTRUCT SEALCOAT AT THE RATE OF 0.45 GALLONS
PER  SQUARE  YARD  OF  SURFACE  ON  ALL  NEW  AND  EXISTING  PAVEMENT  WITHIN  WORK  SITE  IN  ACCORDANCE  WITH
SECTION  302-8  OF  THE  STANDARD  SPECIFICATIONS  (SSPWC).    A  TACK  COAT  CONFORMING  TO  SECTION  302-8.2.1
SHALL BE APPLIED TO 

EXISTING

 PAVEMENT SURFACES IN ADVANCE OF SEALCOAT.

K:

SUBMITTALS:

PROVIDE  SUBMITTALS  DEMONSTRATING  CONFORMANCE  OF  MATERIALS  PROPOSED  FOR  USE  IN  THE  PROJECT  WITH
REQUIREMENTS SPECIFIED HEREIN OR ON THE PLAN, AS FOLLOWS:

·

AGGREGATE BASE

·

ASPHALT CONCRETE

·

CONCRETE

L:

 CONCRETE:

1.

BASE MATERIAL

·

AGGREGATE BASE MATERIAL SHALL BE CRUSHED AGGREGATE BASE CONFORMING TO SECTION 200-2.2 OF THE

STANDARD SPECIFICATIONS (SSPWC).

2.

FORM MATERIALS

·

GENERAL:    SHALL  CONFORM  TO  CALIFORNIA  BUILDING  CODE,  SECTION  1906,  FORMWORK,  EMBEDDED  PIPES

AND CONSTRUCTION JOINTS.

·

PLYWOOD  FORMS:    DOUGLAS  FIR  SPECIES;  SOLID-ONE-SIDE,  SOUND  UNDAMAGED  SHEETS.    UNLESS
OTHERWISE CALLED FOR ON PLANS, SURFACE OF FORM SIDE AGAINST CONCRETE SHALL PROVIDE A MEDIUM
DENSITY TEXTURE.

·

LUMBER:  DOUGLAS FIR SPECIES; CONSTRUCTION GRADE WITH GRADE STAMP CLEARLY VISIBLE.

·

STEEL  FORMS:    MINIMUM  16  GAGE  THICK,  STIFFENED  TO  SUPPORT  WEIGHT  OF  CONCRETE  WITH  MINIMUM
DEFLECTION.

·

FORM TIES:  REMOVABLE METAL OF ADJUSTABLE LENGTH, CONE ENDS.

3.

REINFORCING STEEL

·

ALL REINFORCING SHALL BE FABRICATED FROM STEEL MANUFACTURED IN THE UNITED STATES.

·

REINFORCING  STEEL  SHALL  BE  DEFORMED  BILLET-STEEL  FOR  CONCRETE  REINFORCEMENT  CONFORMING  TO

ASTM  A-615,  GRADE  60  FOR  BAR  SIZES  NO.  4  AND  LARGER,  GRADE  40  FOR  BAR  SIZE  NO.  3,  GRADE  60
ACCEPTABLE FOR ALL SIZES.

·

WELDED  BARS  SHALL  CONFORM  TO  THE  MOST  RECENT  ISSUE  OF  ASTM  STANDARD  A-706,  GRADE  60  FOR  ALL

BAR SIZES.

4.

CONCRETE MATERIALS

·

CEMENT:  SHALL BE TYPE II, LOW ALKALI (NO HIGHER THAN 0.4%), CONFORMING TO ASTM C-150.

·

AGGREGATES  (COARSE  AND  FINE):    ALL  AGGREGATE  USED  IN  CONCRETE  SHALL  CONFORM  TO  ASTM  C-33.
AGGREGATE  SHALL  BE  UNIFORMLY  GRADED,  WITH  THE  MAXIMUM  AGGREGATE  SIZE  BEING  ¾”  TO  1”,  AND  THE

RATIO  OF  COARSE  AGGREGATE  TO  FINE  AGGREGATE  BEING  APPROXIMATELY  60%  TO  40%  (BY  WEIGHT),
RESPECTIVELY.

·

COARSE  AND  FINE  AGGREGATE  (SAND)  ARE  TO  COME  FROM  A  SOURCE  PROVEN  TO  HAVE  NON-REACTIVE
CHARACTERISTICS.    COARSE  AGGREGATE  WHICH  IS  HEAVY  MEDIA  PROCESSED  (SATICOY,  SISQUOC),  SANTA
MARGARITA  ROCK,  OR  SAN  GABRIEL  ROCK  WILL  BE  CONSIDERED  AS  MEETING  THE  CRITERIA  OF
NON-REACTIVITY.    MOORPARK  SAND  (QUALITY,  BEST,  BLUE  STAR)  WILL  BE  CONSIDERED  AS  MEETING  THE
REQUIREMENTS  OF  NON-REACTIVITY.    OTHER  AGGREGATES  MEETING  OR  EXCEEDING  THE  AGGREGATE
REACTIVITY  CHARACTERISTICS  OF  THE  AGGREGATES  LISTED  ABOVE  ARE  ACCEPTABLE  UPON  SUBMITTAL  OF

ADEQUATE DOCUMENTATION (ASTM C-289 AND ASTM C-277 TEST RESULTS THAT ARE NOT MORE THAN 2 YEARS

OLD).

·

WATER:  SHALL BE CLEAN, SUITABLE FOR HUMAN CONSUMPTION, AND NOT DETRIMENTAL TO CONCRETE.

5.

CURING COMPOUND

·

SHALL  BE  WATER-BASE  LIQUID  MEMBRANE-FORMING  COMPOUND  CONFORMING  TO  ASTM  C309,  1100-CLEAR
SERIES MANUFACTURED BY W.R. MEADOWS, INC., OR EQUIVALENT, FOR USE ON EXTERIOR FLATWORK ONLY.

·

LIQUID MEMBRANE-FORMING COMPOUND SHALL BE APPLIED AT THE RATE OF 1 GALLON PER 200 SQUARE FEET,
IN 2 COATS, THE SECOND COAT APPLIED AT RIGHT ANGLES TO THE FIRST.

6.

BONDING AGENT

·

SHALL  BE  POLYVINYL  ACETATE  HIBOND  MANUFACTURED  BY  LAMBERT  CORPORATION,  ORLANDO,  FL,  LOCK
BOND NO. 906 MANUFACTURED BY MACKLANBURG-DUNCAN CO., CITY OF INDUSTRY, CA, OR EQUIVALENT.

7.

CONCRETE MIX

·

MIX AND DELIVER CONCRETE IN ACCORDANCE WITH 

CALIFORNIA BUILDING CODE

, SECTION 1905A.

·

HAVE MIX DESIGNED AND CERTIFIED BY A REGISTERED CIVIL ENGINEER, LICENSED IN CALIFORNIA.

·

SELECT PROPORTIONS FOR CONCRETE IN ACCORDANCE WITH THE APPROVED DESIGN MIX.

·

PROVIDE CONCRETE CONFORMING TO THE FOLLOWING CRITERIA:

·

INCLUDE THE FOLLOWING ADMIXTURES:

-2% MAX. AIR ENTRAINMENT
-15% FLY ASH, CLASS N OR F ONLY
-WATER REDUCING ADMIXTURE: GRACE WRDA 64, OR EQUAL

·

THE USE OF A PEA GRAVEL MIX (ROUNDED 3/8” AGGREGATE) CONCRETE MIX IS EXPRESSLY PROHIBITED.

8.

EXPANSION JOINT

·

FILLER MATERIAL SHALL BE PREFORMED BITUMINOUS TYPE CONFORMING TO ASTM STANDARD D-1751.

·

DOWEL  TUBING  SHALL  BE  PLASTIC  SPEED  DOWEL  SUPPLIED  WITH  SACRIFICIAL  PLATE  FOR  ATTACHING  TO
FORM, AS SUPPLIED BY AZTEC CONCRETE ACCESSORIES, OR APPROVED EQUIVALENT.

9.

REMOVABLE JOINT CAP

·

HIGH  IMPACT  POLYSTYRENE,  DEPTH  EQUAL  TO  WIDTH  OF  EXPANSION  JOINT  FILLER,  SUPPLIED  IN  10-FOOT
LENGTHS, AS MANUFACTURED BY CONCRETE TIE, OR EQUIVALENT.

·

WHERE  POLYURETHANE  SEALANT  PRIMERS  ARE  USED,  A  BONDBREAKER  TAPE  SHALL  BE  APPLIED  PRIOR  TO
CAULKING.

10. JOINT SEALANT

·

FOR 

CRACK-CONTROL 

AND 

EXPANSION 

JOINTS 

SHALL 

BE 

CHEMICAL-CURE, 

TWO-COMPONENT,

POLYURETHANE-BASE,  NON-SAG  ELASTOMERIC  SIKAFLEX-2CNS  MANUFACTURED  BY  SIKA  CORPORATION,
LYNDHURST, NJ, OR APPROVED EQUIVALENT.  COLOR: LIMESTONE GREY.

11.

EPOXY, FLATWORK DOWELS

·

EPOXY  USED  FOR  GROUTING  REBAR  DOWELS  TO  MAINTAIN  JOINT  INTEGRITY  BETWEEN  SITE  FLATWORK
COMPONENTS  (CURBS,  GUTTERS,  WALKWAYS,  RAMPS)  SHALL  BE  SIMPSON  SET-XP  ADHESIVE,  ICC  NO.
ESR-2508, OR EQUIVALENT.  PULL TESTS ARE NOT REQUIRED.

ELEMENT

STRENGTH
MIN. 28-DAY

MIN. CEMENT

CONTENT

MAX.

AGG. SIZE

MAX SLUMP

WAT/CEM

RATIO

ADMIXURES

CURBS, GUTTERS,
RAMPS, WALKS &
FLATWORK

3,000 PSI

4,000 PSI

DRAINAGE & STAIR
STRUCTURES;
PAVEMENT

5.5

SACK/C.Y.

6.5

SACK/C.Y.

3/4-INCH

1-INCH

4 INCHES

4 INCHES

0.59

0.50

SEE  BELOW

SEE BELOW

X:\2020\20002\CAD\2002_MAIN PLAYGROUND IMPROVEMENTS.dwg, 4/21/2022 11:13:31 AM, CEderer

Содержание Farm Sound Panel Insert R5

Страница 1: ...COMPLETELY REMOVED AND THE RESULTING CAVITIES SHALL BE SCARIFIED AND PROCESSED TO RECEIVE FILL IN ACCORDANCE WITH RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER H GRADING 1 GRADING WORK INCLUDES BUT IS...

Страница 2: ...95 LOLLY 3I 279 97 RAIL 279 96 RAIL 280 13 CNC 280 18 CNC 280 17 RAIL 280 61 CNC 280 65 CNC 280 66 RAIL 280 72 RAIL 280 76 DOOR 280 77 DOOR 280 83 THRESH 280 34 CNC 280 66 GB 280 70 GB 280 62 GB 279 8...

Страница 3: ...fety Recommendations R5 04 Support Posts Hardware R5 05 Concrete Footings R5 06 General Safety Warning Labels R5 07 General Maintenance R5 08 Collars R5 09 General Hardware Applications R5 10 to 13 WA...

Страница 4: ...nstallation Improperly assembled playground equipment can present a serious safety hazard Appropriate impact attenuating safety surfacing material is required under and around all play structures and...

Страница 5: ...ollowing tools for installation Adjustable End Wrenches Hacksaw Metal File Shovel Spade Carpenter s Level Hammer Post Hole Digger Tape Measure Combination Wrenches Hex Wrenches Ratchet Set Wheelbarrow...

Страница 6: ...und Safety Handbook also provides a table of critical heights for selected loose fill materials Contact the manufacturer of unitary surfacing materials rubber matting for the critical height ratings o...

Страница 7: ...ther play structure use zone shall overlap the front to rear swing use zone Refer to the ASTM F 1487 Section 9 4 Please refer to the ASTM guidelines for additional information on swings R5 04 1 3 TIRE...

Страница 8: ...ries can occur when metal play surfaces are located in direct sun To avoid the risk of such burn injuries the United States Consumer Product Safety Commission recommends in it s handbook for public pl...

Страница 9: ...POSTS HARDWARE R5 05 www playcraftsystems com For Customer Service Call 800 333 8519 U S A or 541 955 9199 International 7 2 2018 Tapped Blind Hole...

Страница 10: ...See specific Swing Installation Instructions for swing post footings and ground cover requirements 3 Larger footings more concrete may be required due to weather conditions and poor unstable loose or...

Страница 11: ...e information refer to the current publication of the USCPSC Public Playground Safety Handbook For a copy write to U S Consumer Product Safety Commission Office of Information and Public Affairs Washi...

Страница 12: ...be pushed while on the tire swing 11 Children should be advised to wait their turn on activities such as a slide therefore each child is able to slide down and safely move to the side before another...

Страница 13: ...GENERAL SAFETY WARNING LABELS R5 07 ASTM LABELS CSA LABELS WARNING LABEL www playcraftsystems com For Customer Service Call 800 333 8519 U S A or 541 955 9199 International 7 2 2018...

Страница 14: ...lifornia Proposition 65 To eliminate confusion all California customers will receive the labels shown 2 Attach in a conspicuous location such as near an entry 3 To apply clean surface with alcohol rem...

Страница 15: ...such as ropes chains swing hangers bridges etc must be inspected regularly to determine if excessive wear is occurring Any parts showing excessive wear or damage must be replaced 4 All bolts hardware...

Страница 16: ...ctured by Krauss Craft Inc Phone 800 333 8519 DECK IDENTIFICATION R5 1100 Rev B Deck With Slots Deck Without Slots Note Most walls require Decks w slots APPLIES TO Full Walls Half Walls Transition Wal...

Страница 17: ......

Страница 18: ...styles that are joined together at the same level See specific deck installation instructions for attaching each deck corner to mounting blocks on post collars C If Play System has 2 Half Hex Decks 4...

Страница 19: ...Figure 2 See Note A Step 3 Fully tighten all fasteners according to the TIGHTENING TORQUE FOR HARDWARE section of the Installation Manual HARDWARE Shall be stainless steel zinc nickel plated or galva...

Страница 20: ...appropriate energy absorbing safety surface is required under and around all playground equipment Loose fill protective surfacing is shown only as an example for the purpose of this assembly instructi...

Страница 21: ...y The Mounting Blocks shall have a multi stage baked on powder coat finish HARDWARE Shall be stainless steel zinc nickel plated or galvanized as required to resist rust and corrosion Part DESCRIPTION...

Страница 22: ...appropriate energy absorbing safety surface is required under and around all playground equipment Loose fill protective surfacing is shown only as an example for the purpose of this assembly instructi...

Страница 23: ...Blocks shall have a multi stage baked on powder coat finish HARDWARE Shall be stainless steel zinc nickel plated or galvanized as required to resist rust and corrosion R3 5 Parts List Part DESCRIPTION...

Страница 24: ...rs installation instructions C An appropriate energy absorbing safety surface is required under and around all playground equipment Loose fill protective surfacing is shown only as an example for the...

Страница 25: ...rication MOUNTING BLOCKS Shall be two part and precision die cast from a high strength aluminum alloy The Mounting Blocks shall have a multi stage baked on powder coat finish HARDWARE Shall be stainle...

Страница 26: ...9 Collars installation instructions C An appropriate energy absorbing safety surface is required under and around all playground equipment Loose fill protective surfacing is shown only as an example f...

Страница 27: ...he Mounting Blocks shall have a multi stage baked on powder coat finish HARDWARE Shall be stainless steel zinc nickel plated or galvanized as required to resist rust and corrosion R3 5 Parts List Part...

Страница 28: ...thread seizure in stainless steel hardware by serving as a lubricant during assembly B Refer to Installation Manual for R5 09 Collars and R5 11 Socket Clamps installation instructions C An appropriate...

Страница 29: ...ead Bolt 3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 Lock Nut FIGURE 2 BALCONY WALL 3 8 x 1 1 4 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 Lock Nut Figure 1 1 Step 1 Locate and attach co...

Страница 30: ...ed to resist rust and corrosion Step 4 Attach Balcony Wall to collars as shown in Figure 1 2 See Note B Step 5 Fully tighten all fasteners according to the TIGHTENING TORQUE FOR HARDWARE section of th...

Страница 31: ......

Страница 32: ...R5 deck assembly other configurations may vary slightly but do not affect the assembly FIGURE 1 Vertical Deck Filler A Use liquid thread lock such as Loctite with all threaded hardware Important Liqu...

Страница 33: ...O D Washer 3 8 x 1 Button Head Bolt 3 8 x 1 1 4 Lock Nut 3 8 x 1 O D Washer Figure 2 Step 2 Fully tighten all fasteners according to the TIGHTENING TORQUE FOR HARDWARE section of the Installation Manu...

Страница 34: ...12 9413002 Nut Lock 3 8 12 VERTICAL DECK FILLERS Shall be fabricated from 12 gauge sheet steel The Vertical Deck Fillers have a multi stage baked on powder coat finish HARDWARE Shall be stainless stee...

Страница 35: ......

Страница 36: ...embly B Refer to Installation Manual for 09 Collars and 11 Socket Clamps installation instructions C An appropriate energy absorbing safety surface is required under and around all playground equipmen...

Страница 37: ...KET CLAMP BOTTOM SOCKET CLAMP TOP ADA STEPS WALL Figure 1 3 Step 1 Attach ADA Steps to lower deck as shown in Figure 1 1 Repeat for upper deck See Note A Step 2 Loosely attach ADA Step Walls to decks...

Страница 38: ...teps w Walls R5 Part DESCRIPTION QTY CE 0030 ADA Steps 42 26 1 FS 1206 42R ADA Steps 42 26 Wall Set R5 1 HS 1001 R5 Socket Clamp Set R5 4 9103062 TR Bolt Button Head 3 8 x 1 1 4 4 9103072 TR Bolt Butt...

Страница 39: ...all Set R3 5 1 HS 1001 R35 Socket Clamp Set R3 5 4 9103062 TR Bolt Button Head 3 8 x 1 1 4 4 9103072 TR Bolt Button Head 3 8 x 1 1 2 8 9333002 Washer Flat 3 8 x 1 O D x 100 thick 24 9413002 Nut Lock 3...

Страница 40: ...A Use liquid thread lock such as Loctite with all threaded hardware Important Liquid thread lock prior to curing helps to eliminate the common problem of thread seizure in stainless steel hardware by...

Страница 41: ...See Table X 15 381mm 3113 16 808mm 2711 16 703mm 335 8 854mm Footing Distance Table Center of Post to Center of Footing Deck Height Assembly X in X mm 24 Transfer Station 12 24 13 1 4 337 36 Transfer...

Страница 42: ...012 1209 Page 3 of 7 RAIL TYPE 1 RAIL TYPE 3 See Table X RAIL TYPE 2 Collar Height Table Top of Deck to Top of Collar Hand Rail X in X mm TYPE 1 35 1 2 902 TYPE 2 3 33 838 FIGURE 2 Transfer Station Ha...

Страница 43: ...OP TRANSFER DECK SUPPORT 1 4 x 3 4 Square Dr Tek Screw FIGURE 3 3 8 x 1 O D Washer 3 8 x 1 1 2 Button Head Bolt 3 8 Lock Nut 3 8 x 1 O D Washer ADA STEPS Figure 1 2 TRANSFER RAIL Step 4 Place Transfer...

Страница 44: ...ead Bolt Figure 1 4 3 8 x 1 1 4 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 Lock Nut TRANSFER DECK SUPPORT TRANSFER DECK FIGURE 5 3 8 x 1 1 2 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1...

Страница 45: ...1 660 O D 11 gauge steel leg and 1 029 O D 14 gauge steel rungs The Transfer Station Wall shall have a multi stage baked on powder coat finish STEPS DECKS Shall be fabricated using punched formed and...

Страница 46: ...Leg 2 FS 1209 24R Transfer Station H Rail 36 2 HS 1001 R5 Socket Clamp Set R5 2 9103062 TR Bolt Button Head 3 8 x 1 1 4 16 9103072 TR Bolt Button Head 3 8 x 1 1 2 8 9103112 TR Bolt Button Head 3 8 x 2...

Страница 47: ......

Страница 48: ......

Страница 49: ......

Страница 50: ...s a lubricant during assembly B Do not pour concrete until the equipment is completely assembled leveled and plumbed Concrete must be allowed to cure completely before using the equipment at least 72...

Страница 51: ...hown See Note D Top of Soil Finish Grade See Table X 24 610mm 12 305mm Step 1 Refer to Footing Layout and mark footing hole location Dig 1 12 x 24 x 18 deep oval footing hole Refer to Footing Detail f...

Страница 52: ...lt 3 8 x 1 1 2 Button Head Bolt 3 8 x 1 O D Washer 3 8 Lock Nut GRIP RAMP BRACKET 3 8 x 1 O D Washer Step 3 Using Grip Climb Wall as a guide position and attach Grip Ramp Brackets and Half Walls to de...

Страница 53: ...footing hole and attach Grip Climb Wall to Grip Ramp Brackets as shown in Figure 1 2 See Note A Step 6 Locate Grips as desired and attach to Grip Climb Wall as shown in Figure 4 See Note A Step 7 Full...

Страница 54: ...BRKT Grip Ramp Bracket 2 GE 4152 Ramp Grip 2 Hole 6 GE 4190 Ramp Grip 3 Hole 6 9103062 TR Bolt Button Head 3 8 x 1 1 4 34 9103072 TR Bolt Button Head 3 8 x 1 1 2 2 9105072 Bolt Button Head 1 2 x 1 1...

Страница 55: ......

Страница 56: ...ncrete until the equipment is completely assembled leveled and plumbed Concrete must be allowed to cure completely before using the equipment at least 72 hours C Refer to Installation Manual for R5 13...

Страница 57: ...soft soil conditions larger footings may be required Additionally half foot deck heights will require a 6 deeper footing hole Footing depth must be adjusted to compensate for the depth thickness requ...

Страница 58: ...general maintenance please refer to our Playground Maintenance Manual Maintenance Periodically tighten all screws bolts and nuts A periodic inspection of all parts is necessary If a part is broken or...

Страница 59: ......

Страница 60: ...iquid thread lock such as Loctite with all threaded hardware Important Liquid thread lock prior to curing helps to eliminate the common problem of thread seizure in stainless steel hardware by serving...

Страница 61: ...lly a 6 shallower oval footing hole will be required for half foot deck heights Footing depth must be adjusted to compensate for the depth thickness requirements of selected safety surfacing See Secti...

Страница 62: ...the Installation Manual Step 5 Plumb and level entire component Pour concrete into footing hole Allow at least 72 hours to cure before using this equipment See Note B Step 6 Place appropriate complia...

Страница 63: ......

Страница 64: ...d thread lock such as Loctite with all threaded hardware Important Liquid thread lock prior to curing helps to eliminate the common problem of thread seizure in stainless steel hardware by serving as...

Страница 65: ...p of deck to top of collar Height shown from top of collar to top of collar Step 2 Factory Assembled Attach Sit Down Hood Supports and Top Rail to Slide Hood as shown in Figure 2 NOTE Support Tabs mus...

Страница 66: ...ully tighten all fasteners according to the TIGHTENING TORQUE FOR HARDWARE section of the Installation Manual Step 5 Attach Slide Hood to collars as shown in Figure 1 3 See Note B Step 4 Attach Entry...

Страница 67: ...steel tubing with welded 1 029 O D 14 gauge steel tubing and a 10 gauge steel tab The Sit Down Hood Support shall have a multi staged baked on powder coat finish SLIDE HOOD R5 Shall be constructed of...

Страница 68: ...s to eliminate the common problem of thread seizure in stainless steel hardware by serving as a lubricant during assembly B This Assembly requires additional Assembly Pages See also Assembly Page R5 0...

Страница 69: ...5 9199 International HALF WALL HANDLE ASSEMBLY R5 1309 Rev G Page 2 of 3 Half Wall to Deck Connection Figure 1 Half Wall to Socket Clamp Connection Figure 2 3 8 x 1 O D Washer 2 Pl 3 8 x 1 1 4 Button...

Страница 70: ...99 International HALF WALL HANDLE ASSEMBLY R5 1309 Rev G Page 3 of 3 VARIES See Pg R5 11 9103062 TR 9333002 9413002 Half Wall Socket Clamp Assembly Bolt Button Head 3 8 x 1 1 4 Washer Flat 3 8 x 1 x 1...

Страница 71: ......

Страница 72: ...ommon problem of thread seizure in stainless steel hardware by serving as a lubricant during assembly B Refer to Installation Manual for 09 Collars and 11 Socket Clamps assembly instructions C Use app...

Страница 73: ...Step 1 Locate and attach collars to posts at height shown in Front Elevation See Note B Height shown from top of deck to top of collar Step 3 Attach Transition Wall to posts using Socket Clamps as sho...

Страница 74: ...l zinc nickel plated or galvanized as required to resist rust and corrosion R5 TRANSITION WALL Part DESCRIPTION QTY Varies Transition Wall R5 1 HS 1001 R5 Socket Clamp Set R5 2 9103062 TR Bolt Button...

Страница 75: ......

Страница 76: ...er collar Under Deck Installation Make sure distance between the bottom of the deck and the top of the panel s is less than 3 1 2 or greater than 9 to avoid head and neck entrapment D Use appropriate...

Страница 77: ...3 8 x 1 O D Washer 3 8 x 1 1 4 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1 Button Head Bolt 2 Pl 3 8 x 1 O D Washer 2 Pl PANEL front 1 2 SAE Washer 2 Pl FLAT PANEL BRACKET 3 8 x 5 8 Barrel Nut 2 Pl D...

Страница 78: ...der coat finish HARDWARE Shall be stainless steel zinc nickel plated or galvanized as required to resist rust and corrosion Specifications 1 2 2 2 4 2 2 8 6 2 4 Installation Manufactured by Krauss Cra...

Страница 79: ......

Страница 80: ...tely assembled leveled and plumbed Concrete must be allowed to cure completely before using the equipment at least 72 hours C Refer to Installation Manual for 09 Collars and 11 Socket Clamps installat...

Страница 81: ...ee Table X See Table Y Footing Detail Step 1 Refer to Footing Layout and mark footing hole location Dig 1 12 footing hole Refer to Footing Detail for depth and details IMPORTANT For areas with soft so...

Страница 82: ...T 3 8 NUTSERT MOUNTING LUG 1 2 SAE Washer 3 8 x 1 3 8 Shoulder Bolt SOCKET CLAMP ASSEMBLY FIGURE 3 FIGURE 2 Step 2 Factory Assembled Install Nutsert into Table Support as shown in Figure 2 See Note A...

Страница 83: ...3 8 x 3 4 Button Head Bolt 3 8 x 5 8 Barrel Nut 1 2 SAE Washer STORE PANEL COUNTER BRACKET 3 8 x 1 O D Washer 3 8 x 3 4 Button Head Bolt 1 2 SAE Washer 3 8 x 5 8 Barrel Nut MAIN PANEL Step 4 Refer to...

Страница 84: ...AE Washer 3 8 x 5 8 Barrel Nut SEAT STORE PANEL COUNTER BRACKET FIGURE 7 SEAT SUPPORT STORE PANEL COUNTER BRACKET 3 8 x 5 8 Barrel Nut 3 8 x 1 O D Washer 3 8 x 3 4 Button Head Bolt 1 2 SAE Washer FIGU...

Страница 85: ...NTER BRACKET TABLE Step 9 Fully tighten all fasteners according to the TIGHTENING TORQUE FOR HARDWARE section of the Installation Manual Step 10 Plumb and level entire component Pour concrete into foo...

Страница 86: ...F 7102 T Clubhouse Panels R5 Table 1 GG 8113 Mounting Lug R3 5 16 HS 1001 R5 Socket Clamp Set R5 16 9103032 TR Bolt Button Head 3 8 x 3 4 32 9103072 TR Bolt Button Head 3 8 x 1 1 2 1 9143062 TR Bolt S...

Страница 87: ...CKET Shall be precision laser cut and formed from 3 16 sheet steel and will have a multi stage baked on powder coat finish SOCKET CLAMPS Shall be two part and precision die cast from a high strength a...

Страница 88: ...Collars A Use liquid thread lock such as Loctite with all threaded hardware Important Liquid thread lock prior to curing helps to eliminate the common problem of thread seizure in stainless steel har...

Страница 89: ...8 Barrel Nut 1 2 SAE Washer COMPOSER DOUBLE SIT DOWN BRACKET Figure 1 1a R5 Figure 1 1b 3 8 x 2 1 4 Button Head Bolt 3 8 x 1 O D Washer DOUBLE SIT DOWN BRACKET COMPOSER 1 2 SAE Washer 3 8 x 5 8 Barre...

Страница 90: ...er Bolt 1 2 SAE Washer 3 8 x 2 Barrel Nut 1 2 SAE Washer Figure 1 2a R5 1 4 x 1 3 8 Socket Head Screw MOUNTING BLOCK TOP MOUNTING BLOCK BOTTOM 3 8 x 2 1 2 Shoulder Bolt 1 2 SAE Washer 1 2 SAE Washer 3...

Страница 91: ...1 GF 7006 B Mounting Block R5 Bottom 4 GF 7006 T Mounting Block R5 Top 4 9103102 TR Bolt Button Head 3 8 x 2 1 4 4 9143112 TR Bolt Shoulder 3 8 x 2 1 2 BH 4 9281062 5 TR Screw Soc HD 1 4 x 1 3 8 4 93...

Страница 92: ...serving as a lubricant during assembly B Do not pour concrete until the equipment is completely assembled leveled and plumbed Concrete must be allowed to cure completely before using the equipment at...

Страница 93: ...g Detail for depth and details IMPORTANT For areas with soft soil conditions larger footings may be required Footing depth must be adjusted to compensate for the depth thickness requirements of select...

Страница 94: ...ooting hole and attach to deck as shown in Figure 3 See Note A Step 5 Fully tighten all fasteners according to the TIGHTENING TORQUE FOR HARDWARE section of the Installation Manual Step 6 Plumb and le...

Страница 95: ...ead 3 8 x 1 3 4 4 9123032 Bolt Hex 3 8 x 3 4 2 9333002 Washer Flat 3 8 x 1 O D x 100 thick 10 9413002 Nut Lock 3 8 4 24 POLY WAVE SLIDE V2 Part DESCRIPTION QTY 111240 2 2 Poly Wave Slide Vers2 1 FS 17...

Страница 96: ...as a lubricant during assembly B Do not pour concrete until the equipment is completely assembled leveled and plumbed Concrete must be allowed to cure completely before using the equipment at least 7...

Страница 97: ...ompressed depth shown See Note D Finish Grade Top of Soil Step 1 Refer to structure Top View and Step 5 to determine footing locations Dig 1 12 footing hole for each Slide Support and 1 12 x24 oblong...

Страница 98: ...Nut 3 8 x 1 1 4 Button Head Bolt 3 8 x 1 O D Washer ENTRY PANEL Deck ENTRY SECTION Figure 1 1 Deck 3 8 x 2 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 Lock Nut ENTRY SECTION Figure 1 3...

Страница 99: ...Black Cap Nut 3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 x 3 4 Hex Bolt Figure 1 7 EXIT SECTION SINGLE SLIDE LEG Step 6 Place Slide Support in footing hole and attach to Support Bracket as shown in Fig...

Страница 100: ...ons TWISTER SLIDE ROTO Part DESCRIPTION QTY DE 4339 ENT Twister Slide Entry Varies DE 4339 EXT Twister Slide Exit Varies DE 4339 L Twister Slide Left Varies DE 4339 R Twister Slide Right Varies DE 433...

Страница 101: ......

Страница 102: ...e Roof Figure 1 3 Figures 1 1 1 4 Remove canopy from Shade Canopy Roof in high wind and heavy snow conditions Block protrusions while C canopy is removed to maintain CPSC ASTM compliance A Use liquid...

Страница 103: ...factured by Krauss Craft Inc www playcraftsystems com SHADE CANOPY SQUARE ROOF INSTALLATION INSTRUCTIONS Rev B 11 9 2012 18021 Page 2 of 6 Dimension taken from center of bolt to center of bolt Dimensi...

Страница 104: ...Y SUPPORT LEG CANOPY POST Step 3 Insert Rafters into Rafter Hub until Rafters contact the rafter stops Secure Rafters to Rafter Hub as shown in Figure 3 NOTE Insure the lower end of all Rafters are at...

Страница 105: ...Square Dr Tek Screw Figure 1 2 Step 5 Insert Wire Cable through perimeter of Canopy Square Step 6 Attach Wire Cable Clamp to Wire Cable as shown in Figure 1 2 RETAINER BASE CLAMP WIRE CABLE NUT CLAMP...

Страница 106: ...nopy Jack Screws as shown in Figure 1 4 Step 9 Adjust Wire Cable overlap and Wire Clamp until Canopy is taut and D Rings are secure against retainers Slide Wire Cable around until Wire Cable Clamp is...

Страница 107: ...oof Canopy Support Leg shall have a multi stage baked on powder coat finish SHADE CANOPY SQUARE Shall be UV mildew resistant woven acrylic fabric folded and stitched for strength and to accommodate st...

Страница 108: ...g assembly B An appropriate energy absorbing safety surface is required under and around all playground equipment Loose fill protective surfacing is shown only as an example for the purpose of this as...

Страница 109: ...5 8 L Flanged Bearing WHEEL HUB 5 8 x 7 8 x 5 8 L Flanged Bearing FIGURE 2 1 2 Washer x 116 Thick 1 2 x 1 1 2 Button Head Bolt STEERING WHEEL BRACKET R5 SPLIT COLLAR HALF 1 2 Lock Nut 1 2 Washer x 116...

Страница 110: ...1 4 x 1 1 4 BH TR Tek Screw STEERING WHEEL BRACKET STEERING WHEEL BRACKET 3 8 x 1 Button Head Bolt 3 8 x 7 8 O D Washer WHEEL HUB 1 2 x 1 1 4 O D Washer 1 2 Thin Lock Nut DRIVER WHEEL CASTING FIGURE 5...

Страница 111: ...EL HUB 1 2 x 1 1 4 O D Washer 1 2 Thin Lock Nut 10 Pan Head Screw WHEEL BASE WHEEL INSERT 3 8 x 1 3 8 Barrel Nut WHEEL HUB SPACER FIGURE 6 Step 5 Attach Ships Wheel to Steering Wheel Bracket as shown...

Страница 112: ...1 1 4 OD 1 9415132 Nut Lock 1 2 4 9425002 Nut Lock 1 2 Thin 1 9335002 Washer Flat 1 2 116 thick 8 451172 Hex Key Wrench 1 8 SA 1 S 1812 R Part DESCRIPTION QTY BF 7068 Split Collar Half R5 1 FS 1812 R...

Страница 113: ......

Страница 114: ...r to Installation Manual for 09 Collars and 11 Socket Clamps installation instructions D Talk Tubes that are separate from a play structure shall be located at least 72 1829mm from the perimeter of th...

Страница 115: ...SURFACING MATERIAL SHOWN 9 compressed or 12 uncompressed depth Compressed depth shown See Note F Top of Soil Finish Grade 1 1 4 PVC PIPE Not Provided Step 1 For R5 R35 Versions Locate and attach coll...

Страница 116: ...Heights 45 1143mm 53 8 137mm 245 8 625mm Elevation View R5 R35 36 Deck Height 45 1143mm 53 8 137mm 365 8 930mm Elevation View R5 R35 48 60 72 Deck Heights 45 1143mm 53 8 137mm 365 8 930mm 42 1067mm El...

Страница 117: ...Plcs 3 8 x 7 8 O D Thick Washer 2 Plcs Step 3 Factory Assembled For Plastic Versions Only Attach Talk Tube Cone to Talk Tube as shown in Figure 1 1 See Note A Step 4 Factory Assembled Attach PVC Coup...

Страница 118: ...stainless steel zinc nickel plated or galvanized as required to resist rust and corrosion R5 R35 GROUND 12 24 DECK HEIGHTS Part DESCRIPTION QTY GE 7015 Mounting Insert 2 Varies Socket Clamp Set 2 910...

Страница 119: ......

Страница 120: ...at www cpsc gov D Refer to CPSC for appropriate swing spacing E Chain length should be adjusted trimmed so that the underside of the belt swing is no less than 12 Bucket Seat 24 from Finish Grade See...

Страница 121: ...ompressed depth shown See Note I Top of Surfacing Label 26 660mm 12 Min 305mm 24 Min 610mm 96 2438mm 24 Min 610mm Belt Seats ADA Bucket Seat Combo Bucket Seats Finish Grade Step 1 Refer to Footing Lay...

Страница 122: ...R5 INSTALLATION INSTRUCTIONS Rev Q 7 31 2019 PC 2120 Page 3 of 8 18 457mm 93 2362mm 48 1219mm 139 3531mm 48 1219mm 18 457mm Top View Footing Layout Single Seat Swing Bay NOTE Footing distance is the s...

Страница 123: ...onfiguration shown is for illustration of use zones Your configuration may vary slightly Refer to CPSC for corresponding single axis swing use zones IMPORTANT Front to Rear Use Zones cannot overlap wh...

Страница 124: ...ock Nut ARCH BELT SWING CASTING R5 SWING BEAM Figure 1 1 1 2 x 7 Hex Bolt 2 Plcs 1 2 SAE Washer 2 Plcs SWING ARCH 1 2 SAE Washer 2 Plcs 1 2 Lock Nut 2 Plcs ARCH SWING WASHER R5 2 Plcs Figure 1 2 SWING...

Страница 125: ...Figure 1 4 CHAIN SHACKLE SHACKLE BOLT SWING SEAT Shackle Pendulum Upper Bolt Shackle Pendulum Shackle Pendulum Lower Bolt CHAIN SWING BEAM Shackle Pendulum Upper Lock Nut Figure 1 5 Step 5 For Additi...

Страница 126: ...hown in Figure 1 6 Dimension shown indicates suggested placement Step 9 Fully tighten all fasteners according to the TIGHTENING TORQUE FOR HARDWARE section of the Installation Manual Step 10 Plumb and...

Страница 127: ...ing Casting R5 BELT 2 GF 4427 Arch Swing Washer R5 4 LF 4351 Swing Arch R5 2 372010 ASTM 5 12 Years Age App Label 1 372016 Warning Label 1 372017 Top of Surfacing Label 4 9105242 Bolt Button Head 1 2...

Страница 128: ...ccording to the Handbook for Public Playground Safety Publication 325 at www cpsc gov D Refer to CPSC for appropriate swing spacing E Chain length should be adjusted trimmed so that the underside of t...

Страница 129: ...depth Compressed depth shown See Note H Top of Surfacing Label Step 1 Refer to Footing Layout and mark footing hole locations Dig 24 footing holes Refer to Footing Detail for depth and details IMPORT...

Страница 130: ...ST SWINGS INSTALLATION INSTRUCTIONS Rev O 7 31 2019 PC 2181 Page 3 of 11 139 3531mm 24 610mm 93 2362mm 24 610mm Top View Footing Layout Single Seat Swing Bay NOTE Footing distance is the same for addi...

Страница 131: ...nfiguration shown is for illustration of use zones Your configuration may vary slightly Refer to CPSC for corresponding single axis swing use zones IMPORTANT Front to Rear Use Zones cannot overlap whi...

Страница 132: ...ut POST SWING CASTING 1 2 x 4 1 4 Button Head Bolt 1 2 SAE Washer 1 2 SAE Washer 1 2 Lock Nut SWING BEAM Figure 1 2 DOME POST CAP Rivet Rivet POST Figure 1 1 Step 3 Install footing pins into Posts as...

Страница 133: ...Plcs 1 2 SAE Washer 2 Plcs POST SWING BEAM Figure 1 3 SWING BEAM 1 2 Lock Nut 2 Plcs 1 2 SAE Washer 2 Plcs 1 2 x 7 Hex Bolt 2 Plcs 1 2 SAE Washer 2 Plcs ARCH SWING WASHER R5 2 Plcs Step 7 For Belt and...

Страница 134: ...lum Upper Bolt Shackle Pendulum Upper Lock Nut Figure 1 6 Figure 1 7 Shackle H 1 4 x 3 4 Tek Screw 2 Plcs SWING BEAM ANTI WRAP COLLAR GROMMET Shackle H Bolt 1 4 x 3 4 Tek Screw 2 Plcs CHAIN SHACKLE BO...

Страница 135: ...shown in Figure 1 8 Dimension indicates suggested placement Step 11 Fully tighten all fasteners according to the TIGHTENING TORQUE FOR HARDWARE section of the Installation Manual Step 12 Plumb and le...

Страница 136: ...ex 1 2 x 7 2 9345002 Washer Flat SAE 1 2 8 9415132 Nut Lock 1 2 4 9483602 Nut Hex 3 8 1 SINGLE BAY Part DESCRIPTION QTY GF 7002 Post Cap R5 Dome 2 Varies Single Post Swing Post 2 9610012 Rivet 3 16 x...

Страница 137: ...NTI WRAP Part DESCRIPTION QTY HE 0008 49 5 Ft Swing Chain 49 Links 2 HE 31101 Bucket Seat 1 451161 SS Swing Shackle Stainless Steel 2 471017 Anti Wrap Collar 2 HALF BUCKET SEAT Part DESCRIPTION QTY HE...

Страница 138: ...ized steel tubing with welded 3 16 thick steel hangers The Single Post Swing Beam shall have a multi stage baked on powder coat finish SINGLE POST SWING CASTING Shall be cast from a high strength alum...

Страница 139: ......

Страница 140: ...d plumbed Concrete must be allowed to cure completely before using the equipment at least 72 hours C Use appropriate compliant protective surfacing and adjust footing depths accordingly See free publi...

Страница 141: ...r Fabric Over Pea Gravel for drainage Manufactured by Krauss Craft Inc www playcraftsystems com For Customer Service Call 800 333 8519 U S A or 541 955 9199 International SIGN ROTO WELCOME OPTIONS PC...

Страница 142: ...the TIGHTENING TORQUE FOR HARDWARE Section of the Installer s Manual See Note A Step 3 Verify use zone prior to digging Refer to Footing layout and mark footing hole location Dig 1 12 footing hole Ref...

Страница 143: ......

Страница 144: ...ctured by Krauss Craft Inc Phone 800 333 8519 DECK IDENTIFICATION R5 1100 Rev B Deck With Slots Deck Without Slots Note Most walls require Decks w slots APPLIES TO Full Walls Half Walls Transition Wal...

Страница 145: ......

Страница 146: ...styles that are joined together at the same level See specific deck installation instructions for attaching each deck corner to mounting blocks on post collars C If Play System has 2 Half Hex Decks 4...

Страница 147: ...Figure 2 See Note A Step 3 Fully tighten all fasteners according to the TIGHTENING TORQUE FOR HARDWARE section of the Installation Manual HARDWARE Shall be stainless steel zinc nickel plated or galva...

Страница 148: ...appropriate energy absorbing safety surface is required under and around all playground equipment Loose fill protective surfacing is shown only as an example for the purpose of this assembly instructi...

Страница 149: ...y The Mounting Blocks shall have a multi stage baked on powder coat finish HARDWARE Shall be stainless steel zinc nickel plated or galvanized as required to resist rust and corrosion Part DESCRIPTION...

Страница 150: ...appropriate energy absorbing safety surface is required under and around all playground equipment Loose fill protective surfacing is shown only as an example for the purpose of this assembly instructi...

Страница 151: ...Blocks shall have a multi stage baked on powder coat finish HARDWARE Shall be stainless steel zinc nickel plated or galvanized as required to resist rust and corrosion R3 5 Parts List Part DESCRIPTION...

Страница 152: ...rs installation instructions C An appropriate energy absorbing safety surface is required under and around all playground equipment Loose fill protective surfacing is shown only as an example for the...

Страница 153: ...rication MOUNTING BLOCKS Shall be two part and precision die cast from a high strength aluminum alloy The Mounting Blocks shall have a multi stage baked on powder coat finish HARDWARE Shall be stainle...

Страница 154: ...9 Collars installation instructions C An appropriate energy absorbing safety surface is required under and around all playground equipment Loose fill protective surfacing is shown only as an example f...

Страница 155: ...he Mounting Blocks shall have a multi stage baked on powder coat finish HARDWARE Shall be stainless steel zinc nickel plated or galvanized as required to resist rust and corrosion R3 5 Parts List Part...

Страница 156: ...thread seizure in stainless steel hardware by serving as a lubricant during assembly B Refer to Installation Manual for R5 09 Collars and R5 11 Socket Clamps installation instructions C An appropriate...

Страница 157: ...ead Bolt 3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 Lock Nut FIGURE 2 BALCONY WALL 3 8 x 1 1 4 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 Lock Nut Figure 1 1 Step 1 Locate and attach co...

Страница 158: ...ed to resist rust and corrosion Step 4 Attach Balcony Wall to collars as shown in Figure 1 2 See Note B Step 5 Fully tighten all fasteners according to the TIGHTENING TORQUE FOR HARDWARE section of th...

Страница 159: ......

Страница 160: ...embly B Refer to Installation Manual for 09 Collars and 11 Socket Clamps installation instructions C An appropriate energy absorbing safety surface is required under and around all playground equipmen...

Страница 161: ...KET CLAMP BOTTOM SOCKET CLAMP TOP ADA STEPS WALL Figure 1 3 Step 1 Attach ADA Steps to lower deck as shown in Figure 1 1 Repeat for upper deck See Note A Step 2 Loosely attach ADA Step Walls to decks...

Страница 162: ...teps w Walls R5 Part DESCRIPTION QTY CE 0030 ADA Steps 42 26 1 FS 1206 42R ADA Steps 42 26 Wall Set R5 1 HS 1001 R5 Socket Clamp Set R5 4 9103062 TR Bolt Button Head 3 8 x 1 1 4 4 9103072 TR Bolt Butt...

Страница 163: ...all Set R3 5 1 HS 1001 R35 Socket Clamp Set R3 5 4 9103062 TR Bolt Button Head 3 8 x 1 1 4 4 9103072 TR Bolt Button Head 3 8 x 1 1 2 8 9333002 Washer Flat 3 8 x 1 O D x 100 thick 24 9413002 Nut Lock 3...

Страница 164: ...B Do not pour concrete until the equipment is completely assembled leveled and plumbed Concrete must be allowed to cure completely before using the equipment at least 72 hours C Refer to Installation...

Страница 165: ...sturbed Soil Blocking See Installers Manual Top of Soil Finish Grade Elevation View Footing Detail 155 8 397mm 155 8 397mm 715 16 1811mm 7211 16 1846mm 12 305mm Step 1 Refer to Footing Layout and mark...

Страница 166: ...r RAMP 3 8 x 1 1 4 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 Lock Nut DECK Figure 1 2 RAMP RAMP 3 8 x 1 1 4 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 Lock Nut 3 8 x 1...

Страница 167: ...A Step 7 Attach Rail to Post as shown in Figure 1 4 See Note A Step 8 Attach Rail to Ramp as shown in Figure 1 5 See Notes A E Step 9 Fully tighten all fasteners according to the TIGHTENING TORQUE FO...

Страница 168: ...sher Flat 3 8 x 1 O D x 100 thick 56 9345002 Washer Flat SAE 1 2 12 9413002 Nut Lock 3 8 26 9443092 TR Nut Barrel 3 8 x 2 BH 8 RAMP w RAILS R5 DECK TO DECK Part DESCRIPTION QTY CF 7126 R5 Ramp 2 FS 12...

Страница 169: ...lat 3 8 x 1 O D x 100 thick 44 9345002 Washer Flat SAE 1 2 12 9413002 Nut Lock 3 8 20 9443092 TR Nut Barrel 3 8 x 2 BH 8 SENSORY RAMP R5 DECK TO DECK Part DESCRIPTION QTY CF 7126 R5 Ramp 2 FS 1208 LEG...

Страница 170: ...be evenly spaced 1 029 O D 14 gauge steel tubing and will have a multi stage baked on powder coat finish SENSORY WALL SET Shall consist of 1 315 O D 11 gauge and 1 029 O D 14 gauge rails welded to 1...

Страница 171: ......

Страница 172: ...A Use liquid thread lock such as Loctite with all threaded hardware Important Liquid thread lock prior to curing helps to eliminate the common problem of thread seizure in stainless steel hardware by...

Страница 173: ...See Table X 15 381mm 3113 16 808mm 2711 16 703mm 335 8 854mm Footing Distance Table Center of Post to Center of Footing Deck Height Assembly X in X mm 24 Transfer Station 12 24 13 1 4 337 36 Transfer...

Страница 174: ...012 1209 Page 3 of 7 RAIL TYPE 1 RAIL TYPE 3 See Table X RAIL TYPE 2 Collar Height Table Top of Deck to Top of Collar Hand Rail X in X mm TYPE 1 35 1 2 902 TYPE 2 3 33 838 FIGURE 2 Transfer Station Ha...

Страница 175: ...OP TRANSFER DECK SUPPORT 1 4 x 3 4 Square Dr Tek Screw FIGURE 3 3 8 x 1 O D Washer 3 8 x 1 1 2 Button Head Bolt 3 8 Lock Nut 3 8 x 1 O D Washer ADA STEPS Figure 1 2 TRANSFER RAIL Step 4 Place Transfer...

Страница 176: ...ead Bolt Figure 1 4 3 8 x 1 1 4 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 Lock Nut TRANSFER DECK SUPPORT TRANSFER DECK FIGURE 5 3 8 x 1 1 2 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1...

Страница 177: ...1 660 O D 11 gauge steel leg and 1 029 O D 14 gauge steel rungs The Transfer Station Wall shall have a multi stage baked on powder coat finish STEPS DECKS Shall be fabricated using punched formed and...

Страница 178: ...Leg 2 FS 1209 24R Transfer Station H Rail 36 2 HS 1001 R5 Socket Clamp Set R5 2 9103062 TR Bolt Button Head 3 8 x 1 1 4 16 9103072 TR Bolt Button Head 3 8 x 1 1 2 8 9103112 TR Bolt Button Head 3 8 x 2...

Страница 179: ......

Страница 180: ...to curing helps to eliminate the common problem of thread seizure in stainless steel hardware by serving as a lubricant during assembly B Do not pour concrete until the equipment is completely assemb...

Страница 181: ...d depth Compressed depth shown See Note D Finish Grade Top of Soil Footing Anchor 686mm 18 457mm 27 12 305mm 913 16 249mm 43 16 107mm See Section 06 1 of the Installation Manual Footing Detail Step 1...

Страница 182: ...nd attach to deck as shown in Figure 1 1 Part DESCRIPTION QTY Varies Vertical Ladder 1 9103062 TR Bolt Button Head 3 8 x 1 1 4 2 9333002 Washer Flat 3 8 x 1 O D x 100 thick 4 9413002 Nut Lock 3 8 2 Fi...

Страница 183: ......

Страница 184: ......

Страница 185: ......

Страница 186: ...s a lubricant during assembly B Do not pour concrete until the equipment is completely assembled leveled and plumbed Concrete must be allowed to cure completely before using the equipment at least 72...

Страница 187: ...hown See Note D Top of Soil Finish Grade See Table X 24 610mm 12 305mm Step 1 Refer to Footing Layout and mark footing hole location Dig 1 12 x 24 x 18 deep oval footing hole Refer to Footing Detail f...

Страница 188: ...lt 3 8 x 1 1 2 Button Head Bolt 3 8 x 1 O D Washer 3 8 Lock Nut GRIP RAMP BRACKET 3 8 x 1 O D Washer Step 3 Using Grip Climb Wall as a guide position and attach Grip Ramp Brackets and Half Walls to de...

Страница 189: ...footing hole and attach Grip Climb Wall to Grip Ramp Brackets as shown in Figure 1 2 See Note A Step 6 Locate Grips as desired and attach to Grip Climb Wall as shown in Figure 4 See Note A Step 7 Full...

Страница 190: ...BRKT Grip Ramp Bracket 2 GE 4152 Ramp Grip 2 Hole 6 GE 4190 Ramp Grip 3 Hole 6 9103062 TR Bolt Button Head 3 8 x 1 1 4 34 9103072 TR Bolt Button Head 3 8 x 1 1 2 2 9105072 Bolt Button Head 1 2 x 1 1...

Страница 191: ......

Страница 192: ...of thread seizure in stainless steel hardware by serving as a lubricant during assembly B Do not pour concrete until the equipment is completely assembled leveled and plumbed Concrete must be allowed...

Страница 193: ...areas with soft soil conditions larger footings may be required Footing depth must be adjusted to compensate for the depth thickness requirements of selected Top View Footing Layout Requirements Pea G...

Страница 194: ...Disc Climber Disc as shown in Figure 3 See Note A Step 2 Factory Assembled Attach Dome Post Cap to Disc Climber Post as shown in Figure 2 Step 4 Factory Assembled Starting with the top Disc Climber s...

Страница 195: ...See Notes A B C Step 8 Fully tighten all fasteners according to the TIGHTENING TORQUE FOR HARDWARE section of the Installation Manual Step 9 Plumb and level entire component Pour concrete into footin...

Страница 196: ...k 1 4 x 1 1 4 BH TR 6 9333042 Washer Flat 3 8 x 7 8 O D 6 9610012 Rivet 3 16 x 1 2 to 3 4 Pop 2 3 DISC ASSEMBLY Part DESCRIPTION QTY DE 4373 Disc Climber Disc 3 EG 4442 Disc Climber Cap 1 FS 1233 3 Di...

Страница 197: ......

Страница 198: ...ed leveled and plumbed Concrete must be allowed to cure completely before using the equipment at least 72 hours C Refer to Installation Manual for R5 1310 Transition Wall installation instructions D A...

Страница 199: ...LOOSE FILL SURFACING MATERIAL SHOWN 9 compressed or 12 uncompressed depth Compressed depth shown See Note D 191 4 489mm Footing Detail Step 1 Refer to Footing Layout and mark footing hole location Dig...

Страница 200: ...ON WALL Figure 1 2 Step 2 Factory Assembled Attach Spiral Step Climber Treads to Spiral Step Climber as shown in Figure 1 1 See Note A Step 3 Attach Transition Wall See Note C Step 4 Place Spiral Step...

Страница 201: ...62 TR Bolt Button Head 3 8 x 1 1 4 12 9333042 Washer Flat 3 8 x 7 8 O D 24 9413162 BLK Nut Lock 3 8 w Black Cap 12 72 DECK HEIGHT Part DESCRIPTION QTY EE 4420 Spiral Step Climber Tread 6 FS 1234 6R Sp...

Страница 202: ...Manual Sections Figure 1 4 NOTE R5 72 Canada Configuration shown Other Configurations will vary slightly but does not affect the assembly Refer to Installation Manual for 09 Collars and 11 Socket Clam...

Страница 203: ...ev E 9 21 2009 1237 Page 2 of 5 Top of Collar to Top of Collar Top of Deck to top of Collar FIGURE 5 72 Vertical Rock Climber 245 8 625mm 39 991mm 18 457mm 18 457mm FIGURE 3 48 Vertical Rock Climber 2...

Страница 204: ...A Step 1 Factory Assembled Attach the Vertical Rock Climb Grips to their corresponding slot on the Vertical Rock Climber Panel as shown in Figure 1 1 See Note A Step 3 Attach the collars at the heigh...

Страница 205: ...art DESCRIPTION QTY FS 1237 Vertical Rock Climber Handle 1 HS 1001 R5 Socket Clamp Set R5 6 Varies Mounting Lug 6 Varies Vertical Rock Climb Entry 1 9103052 TR Bolt Button Head 3 8 x 1 2 9103082 TR Bo...

Страница 206: ...9103082 TR Bolt Button Head 3 8 x 1 3 4 6 9143062 TR Bolt Shoulder 3 8 x 1 3 8 BH 8 9333002 Washer Flat 3 8 x 1 O D x 100 thick 14 9345002 Washer Flat SAE 1 2 10 9413002 Nut Lock 3 8 6 9443022 TR Nut...

Страница 207: ......

Страница 208: ...seizure in stainless steel hardware by serving as a lubricant during assembly B Refer to Installation Manual for R5 09 Collars and R5 11 Socket Clamps assembly instructions C All gaps created e g betw...

Страница 209: ...ote D Varies Washer Button Head Bolt 3 8 x 1 1 4 3 8 x 1 O D 3 8 Lock Nut Figure 1 2 Step 3 Attach Wall to collars as shown in Figure 1 2 See Note B Step 4 Fully tighten all fasteners according to the...

Страница 210: ...Nut Lock 3 8 2 DECK MOUNT Part DESCRIPTION QTY HS 1001 R5 Socket Clamp Set R5 2 Varies R5 Steel Bar Wall GROUND UPPER MOUNT Part DESCRIPTION QTY HS 1001 R5 Socket Clamp Set R5 4 Varies R5 Steel Bar W...

Страница 211: ......

Страница 212: ...sembly 1705 Double Slide See Installation Manual Sections Figure 1 1 See Installation Manual Sections R5 09 Collars and R5 11 Socket Clamps FIGURE 1 Double Sit Down R5 A Use liquid thread lock such as...

Страница 213: ...lti stage baked on powder coat finish HARDWARE Shall be stainless steel zinc nickel plated or galvanized as required to resist rust and corrosion Step 1 Attach Double Slide to deck See Note B Step 2 L...

Страница 214: ...s to eliminate the common problem of thread seizure in stainless steel hardware by serving as a lubricant during assembly B This Assembly requires additional Assembly Pages See also Assembly Page R5 0...

Страница 215: ...5 9199 International HALF WALL HANDLE ASSEMBLY R5 1309 Rev G Page 2 of 3 Half Wall to Deck Connection Figure 1 Half Wall to Socket Clamp Connection Figure 2 3 8 x 1 O D Washer 2 Pl 3 8 x 1 1 4 Button...

Страница 216: ...99 International HALF WALL HANDLE ASSEMBLY R5 1309 Rev G Page 3 of 3 VARIES See Pg R5 11 9103062 TR 9333002 9413002 Half Wall Socket Clamp Assembly Bolt Button Head 3 8 x 1 1 4 Washer Flat 3 8 x 1 x 1...

Страница 217: ......

Страница 218: ...ommon problem of thread seizure in stainless steel hardware by serving as a lubricant during assembly B Refer to Installation Manual for 09 Collars and 11 Socket Clamps assembly instructions C Use app...

Страница 219: ...Step 1 Locate and attach collars to posts at height shown in Front Elevation See Note B Height shown from top of deck to top of collar Step 3 Attach Transition Wall to posts using Socket Clamps as sho...

Страница 220: ...l zinc nickel plated or galvanized as required to resist rust and corrosion R5 TRANSITION WALL Part DESCRIPTION QTY Varies Transition Wall R5 1 HS 1001 R5 Socket Clamp Set R5 2 9103062 TR Bolt Button...

Страница 221: ......

Страница 222: ...Do not pour concrete until the equipment is completely assembled leveled and plumbed Concrete must be allowed to cure completely before using the equipment at least 72 hours C Refer to Installation Ma...

Страница 223: ...th shown See Note D 24 610mm 453 8 1153mm 445 8 1133mm Top View Footing Layout Step 1 Refer to Footing Layout and mark footing hole location Dig 1 18 footing hole Refer to Footing Detail for depth and...

Страница 224: ...AWL TUBE ELBOW MF 3 8 Lock Nut 3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 x 1 1 4 Button Head Bolt FIGURE 2 3 8 x 1 3 8 Shoulder Bolt 1 2 SAE Washer MOUNTING LUG SOCKET CLAMP ASSEMBLY Figure 1 1 Step 2...

Страница 225: ...x 1 O D Washer 3 8 Black Cap Nut Figure 1 2 Step 6 Attach Crawl Tube Entrapment Blocker to Tube Panels as shown in Figure 3 See Note A Step 7 Place Tube Support into footing hole and attach to Tube S...

Страница 226: ...180 Deg Crawl Tube Entrapment Blocker 1 GF 7007 Mounting Lug R5 8 HS 1001 R5 Socket Clamp Set R5 8 S 1708 STRT Straight Tube Support 1 9103052 TR Bolt Button Head 3 8 x 1 2 9103062 TR Bolt Button Head...

Страница 227: ......

Страница 228: ...Nut 3 8 x2 1 2 ShOUld i 1 2 SAE _ waSher I cD I I I I Figure 2 Figure 3 114 x1 3 8 Socket Hd Cap Screw Mounting Block Bottom Assembly View 3 8 I Washer l 6 PI I 3 8 x1 1 2 Hex Bolt Figure 1 See Figure...

Страница 229: ...ashers 9333002 Step 3 8 1 2 SAE Washers 9345002 Attach Belt Bridge Walls to post collars as 16 3 8 Lock Nuts 9413002 shown in Figure 2 4 3 8 x2 Barrel Nuts 9443092 TR Step 4 Pre Assembled Attach Belt...

Страница 230: ...completely before using the equipment at least 72 hours C Refer to Installation Manual 1708 Tube Support R5 1601 Panel Type 1 assembly instructions for R5 installation and R3 5 1600 for R3 5 installa...

Страница 231: ...FILL GROUND COVER Impact attenuating resilient surfacing 9 compacted or 12 uncompressed depth Compacted depth shown See Note D Footing Detail 18 457mm 27 686mm Step 1 Refer to Footing Layout and mark...

Страница 232: ...sher 3 8 x 1 O D Washer 3 8 x 2 1 4 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1 Button Head Bolt FIGURE 3 TUBE STRAIGHT 24 CRAWL TUBE PANEL FIGURE 2 ROTO PANEL ROUND TUBE STRAIGHT 24 Step 2b For R3 5...

Страница 233: ...e using this equipment See Note B Step 6 Place appropriate compliant protective surfacing under and around Tube Panel See Note D Step 3 Attach panel to deck and collars Place Straight Tube Support in...

Страница 234: ...DESCRIPTION QTY DE 1524 Tube Straight 24 1 S 1600 R35T Panel Round R3 5 1 S 1708 STRT12 Straight Tube Support 1 9103062 TR Bolt Button Head 3 8 x 1 1 4 3 9103102 TR Bolt Button Head 3 8 x 2 1 4 12 93...

Страница 235: ......

Страница 236: ...allation Make sure distance between the bottom of the deck and the top of the panel s is less than 3 1 2 or greater than 9 to avoid head and neck entrapment D Use appropriate compliant protective surf...

Страница 237: ...tion Deck Mt 2 Pl Ground Mt 4 Pl PANEL front Panel to Deck Connection 2 Pl Figure 2 3 8 x 1 O D Washer 3 8 x 1 1 4 Button Head Bolt 3 8 Lock Nut 2 Pl 3 8 x 1 O D Washer 2 Pl 3 8 x 1 3 4 Button Head Bo...

Страница 238: ...Inc www playcraftsystems com For Customer Service Call 800 333 8519 U S A or 541 955 9199 International PANEL TYPE 1 Rotomolded LLDPE R5 1601 Rev G Page 3 of 3 Parts List Ground Mt VARIES See Pg R5 1...

Страница 239: ......

Страница 240: ...er collar Under Deck Installation Make sure distance between the bottom of the deck and the top of the panel s is less than 3 1 2 or greater than 9 to avoid head and neck entrapment D Use appropriate...

Страница 241: ...3 8 x 1 O D Washer 3 8 x 1 1 4 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1 Button Head Bolt 2 Pl 3 8 x 1 O D Washer 2 Pl PANEL front 1 2 SAE Washer 2 Pl FLAT PANEL BRACKET 3 8 x 5 8 Barrel Nut 2 Pl D...

Страница 242: ...der coat finish HARDWARE Shall be stainless steel zinc nickel plated or galvanized as required to resist rust and corrosion Specifications 1 2 2 2 4 2 2 8 6 2 4 Installation Manufactured by Krauss Cra...

Страница 243: ......

Страница 244: ...tely assembled leveled and plumbed Concrete must be allowed to cure completely before using the equipment at least 72 hours C Refer to Installation Manual for 09 Collars and 11 Socket Clamps installat...

Страница 245: ...ee Table X See Table Y Footing Detail Step 1 Refer to Footing Layout and mark footing hole location Dig 1 12 footing hole Refer to Footing Detail for depth and details IMPORTANT For areas with soft so...

Страница 246: ...T 3 8 NUTSERT MOUNTING LUG 1 2 SAE Washer 3 8 x 1 3 8 Shoulder Bolt SOCKET CLAMP ASSEMBLY FIGURE 3 FIGURE 2 Step 2 Factory Assembled Install Nutsert into Table Support as shown in Figure 2 See Note A...

Страница 247: ...3 8 x 3 4 Button Head Bolt 3 8 x 5 8 Barrel Nut 1 2 SAE Washer STORE PANEL COUNTER BRACKET 3 8 x 1 O D Washer 3 8 x 3 4 Button Head Bolt 1 2 SAE Washer 3 8 x 5 8 Barrel Nut MAIN PANEL Step 4 Refer to...

Страница 248: ...AE Washer 3 8 x 5 8 Barrel Nut SEAT STORE PANEL COUNTER BRACKET FIGURE 7 SEAT SUPPORT STORE PANEL COUNTER BRACKET 3 8 x 5 8 Barrel Nut 3 8 x 1 O D Washer 3 8 x 3 4 Button Head Bolt 1 2 SAE Washer FIGU...

Страница 249: ...NTER BRACKET TABLE Step 9 Fully tighten all fasteners according to the TIGHTENING TORQUE FOR HARDWARE section of the Installation Manual Step 10 Plumb and level entire component Pour concrete into foo...

Страница 250: ...F 7102 T Clubhouse Panels R5 Table 1 GG 8113 Mounting Lug R3 5 16 HS 1001 R5 Socket Clamp Set R5 16 9103032 TR Bolt Button Head 3 8 x 3 4 32 9103072 TR Bolt Button Head 3 8 x 1 1 2 1 9143062 TR Bolt S...

Страница 251: ...CKET Shall be precision laser cut and formed from 3 16 sheet steel and will have a multi stage baked on powder coat finish SOCKET CLAMPS Shall be two part and precision die cast from a high strength a...

Страница 252: ...serving as a lubricant during assembly B Do not pour concrete until the equipment is completely assembled leveled and plumbed Concrete must be allowed to cure completely before using the equipment at...

Страница 253: ...g Detail for depth and details IMPORTANT For areas with soft soil conditions larger footings may be required Footing depth must be adjusted to compensate for the depth thickness requirements of select...

Страница 254: ...ooting hole and attach to deck as shown in Figure 3 See Note A Step 5 Fully tighten all fasteners according to the TIGHTENING TORQUE FOR HARDWARE section of the Installation Manual Step 6 Plumb and le...

Страница 255: ...ead 3 8 x 1 3 4 4 9123032 Bolt Hex 3 8 x 3 4 2 9333002 Washer Flat 3 8 x 1 O D x 100 thick 10 9413002 Nut Lock 3 8 4 24 POLY WAVE SLIDE V2 Part DESCRIPTION QTY 111240 2 2 Poly Wave Slide Vers2 1 FS 17...

Страница 256: ...Sit Down Bar and R3 5 1305 Double Sit Down Panel D Exit height must be between 7 180mm and 15 380mm from finish grade for slides with an elevation greater than 48 For slide elevations no greater than...

Страница 257: ...1 of the Installation Manual Adjust footing depth with blocking to meet required exit height See Note D Finish Grade Footing Depth Dimensions Support Leg Deck Height SD1 SD2 LD1 LD2 30 NA NA 31 1 2 8...

Страница 258: ...DOUBLE SLIDE 1702 Page 3 of 7 Rev E 7 18 2009 93 16 233mm 93 16 233mm 185 16 466mm 575 16 1456mm 93 16 233mm 93 16 233mm R5 Top View Footing Layouts 36 Double Slide 48 Double Slide 60 Double Slide 72...

Страница 259: ...BLE SLIDE 1702 Page 4 of 7 Rev E 7 18 2009 185 16 466mm 93 16 233mm 4115 16 1065mm 1017 16 2577mm 93 16 233mm 471 2 1207mm 10211 16 2609mm 93 16 233mm 5813 16 1494mm 185 16 466mm 93 16 233mm R3 5 Top...

Страница 260: ...s into the footing holes and attach the face of the double slide to the face of the R5 deck as shown in Figure 1 3 See Note A For R3 5 Double Slide only Place the Double Slide Leg and Supports into th...

Страница 261: ...6 Plumb and level entire component Pour concrete into footing hole Allow at least 72 hours to cure before using this equipment See Note B and D Step 7 Place appropriate compliant protective surfacing...

Страница 262: ...ts List Part DESCRIPTION QTY CG 8128 Slide Spacer R3 5 1 DE 4806 60 Doulbe Slide 1 FS 1702 Double Slide Leg 1 FS 1704 Wave Slide Support 2 9103032 TR Bolt Button Head 3 8 x 3 4 4 9103142 TR Bolt Butto...

Страница 263: ......

Страница 264: ...lars and 11 Socket Clamps installation instructions D For slides with an entry elevation of 48 1219mm or greater the exit height must be between 7 180mm and 15 380mm from finish grade For slides with...

Страница 265: ...shown See Note D 539 16 1361mm 481 4 1225mm 9 228mm 441 16 1120mm 3 76mm 24 610mm 12 305mm 18 457mm 2 Plcs Step 1 Refer to Footing Layout and mark footing hole locations Dig 2 12 footing holes and 1 x...

Страница 266: ...BLY INSTALLATION INSTRUCTIONS 481 4 1225mm 539 16 1361mm 903 4 2306mm 963 4 2458mm 91 16 230mm 443 16 1122mm 237 16 595mm 3313 16 859mm 18 457mm 2 Plcs 24 610mm 12 305mm C L Top View Footing Layout 84...

Страница 267: ...er 3 8 x 2 1 2 Button Head Bolt DECK 3 8 x 2 Barrel Nut 1 2 SAE Washer MOUNTING BLOCK BOTTOM MOUNTING BLOCK TOP 1 4 x 1 3 8 Socket Head Screw Figure 1 3 3 8 x 1 1 2 Button Head Bolt 3 8 x 1 O D Washer...

Страница 268: ...4 x 1 3 8 Socket Head Screw 1 2 SAE Washer 3 8 x 2 Barrel Nut Figure 1 4 WALL DECK 3 8 Lock Nut 3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 x 1 1 4 Button Head Bolt Figure 1 5 FIGURE 2 DECK 3 8 x 1 O D...

Страница 269: ...FIGURE 3 SPACER HOOD Figure 1 6 Tek Screw 1 4 x 1 1 4 1 4 x 1 OD Fender Washer HOOD WALL 3 8 x 2 3 4 Button Head Bolt 3 8 x 1 O D Washer DECK 3 8 x 1 O D Washer 3 8 Lock Nut CURVED ENTRY FIGURE 4 Step...

Страница 270: ...asher 3 8 x 1 3 4 Button Head Bolt SPIRAL SECTION SPIRAL SECTION FIGURE 7 SUPPORT BRACKET 3 8 x 1 3 4 Button Head Bolt 3 8 x 1 O D Washer CURVED ENTRY SPIRAL SECTION FIGURE 6 Step 11 Secure Curved Ent...

Страница 271: ...7 Step 14 Place Slide Support in footing hole and attach to Support Bracket as shown in Figure 7 See Note A Step 15 Place Slide Leg in footing hole and attach to Exit Section as shown in Figure 1 8 Se...

Страница 272: ...125 thk 2 9333002 Washer Flat 3 8 x 1 O D x 100 thick 63 9345002 Washer Flat SAE 1 2 10 9413002 Nut Lock 3 8 16 9443052 TR Nut Barrel 3 8 x 1 1 8 BH 4 9443092 TR Nut Barrel 3 8 x 2 BH 4 R3 5 SPIRAL SL...

Страница 273: ...125 thk 2 9333002 Washer Flat 3 8 x 1 O D x 100 thick 68 9345002 Washer Flat SAE 1 2 10 9413002 Nut Lock 3 8 16 9443052 TR Nut Barrel 3 8 x 1 1 8 BH 4 9443092 TR Nut Barrel 3 8 x 2 BH 4 R3 5 SPIRAL S...

Страница 274: ...125 thk 2 9333002 Washer Flat 3 8 x 1 O D x 100 thick 73 9345002 Washer Flat SAE 1 2 10 9413002 Nut Lock 3 8 16 9443052 TR Nut Barrel 3 8 x 1 1 8 BH 4 9443092 TR Nut Barrel 3 8 x 2 BH 4 R3 5 SPIRAL S...

Страница 275: ...have a multi stage baked on powder coat finish TWISTER SIT DOWN SIDE GUARD CANADA Shall be fabricated using 1 029 14 gauge steel tubing with 10 gauge HR steel and will have a multi stage baked on pow...

Страница 276: ...try 1708 Tube Supports Assembly 1710 Twister Slide 1710 SUP Twister Slide Support Assembly and 1709 YOUR SLIDE Portal Slide Configuration installation instructions D For slides with an entry elevation...

Страница 277: ...e Installers Manual 2b Stone drain rock Undisturbed Soil Top of Soil Finish Grade Elevation View Footing Detail 18 457mm Typ 12 305mm 24 610mm Top View Footing Layout Step 1 Refer to Footing Layout an...

Страница 278: ...3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 Lock Nut FIGURE 4 TUBE SUPPORT KEE CLAMP TUBE SUPPORT BRACKET 3 8 x 1 1 2 Button Head Bolt 3 8 x 1 O D Washer 3 8 x 1 O D Washer 3 8 Lock Nut 3 8 x 1 1 4 But...

Страница 279: ...BE SUPPORT FIGURE 7 TWISTER SECTION TWISTER SECTION 3 8 x 1 3 4 Button Head Bolt 3 8 x 1 O D Washer FIGURE 8 TWISTER SECTION TWISTER SECTION TWISTER SUPPORT 3 8 x 1 Button Head Bolt 3 8 x 1 O D Washer...

Страница 280: ...E SUPPORTS Shall be an assembly with two components The Leg shall be fabricated using 2 375 O D 10 gauge steel tubing and 1 660 O D 11 gauge steel tubing with welded 1 4 3 16 thick steel caps and 5 8...

Страница 281: ...BE TO TUBE JUNCTION W SUPPORT Part DESCRIPTION QTY S 1708 INCL238 Spiral Tube Slide Support 2 375 O D 1 9103062 TR Bolt Button Head 3 8 x 1 1 4 9 9333002 Washer Flat 3 8 x 1 O D x 100 thick 18 9413002...

Страница 282: ...2014 18011 Page 1 of 4 curing helps to eliminate the common problem of thread seizure in stainless steel hardware by serving as a lubricant during assembly A Use liquid thread lock such as Loctite wit...

Страница 283: ...URE 3 3 8 Black Cap Nut QUAD ROOF LEFT SIDE ROOF SECTION Head Bolt 3 8 x 1 Button Washer 3 8 x 1 O D 3 8 x 1 O D Washer QUAD ROOF RIGHT SIDE ROOF SECTION Attach the Left Side Roof Section to the Right...

Страница 284: ...A Attach Quad Roof Cap to Roof Sections as shown Step 3 Step 4 For Large Steel Roof Only Attach Skirt Connectors to Roof Sections as shown in Figure 5 See Note A FIGURE 4 3 8 x 1 Button Head Bolt Nut...

Страница 285: ...racket 4 BF 0587 Large Quad Roof Left Side Roof Section 4 BF 0588 Large Quad Roof Right Side Roof Section 4 CE 0050 Quad Roof Cap 1 9103052 TR Bolt Button Head 3 8 x 1 120 9103062 TR Bolt Button Head...

Страница 286: ...e Roof Figure 1 3 Figures 1 1 1 4 Remove canopy from Shade Canopy Roof in high wind and heavy snow conditions Block protrusions while C canopy is removed to maintain CPSC ASTM compliance A Use liquid...

Страница 287: ...factured by Krauss Craft Inc www playcraftsystems com SHADE CANOPY SQUARE ROOF INSTALLATION INSTRUCTIONS Rev B 11 9 2012 18021 Page 2 of 6 Dimension taken from center of bolt to center of bolt Dimensi...

Страница 288: ...Y SUPPORT LEG CANOPY POST Step 3 Insert Rafters into Rafter Hub until Rafters contact the rafter stops Secure Rafters to Rafter Hub as shown in Figure 3 NOTE Insure the lower end of all Rafters are at...

Страница 289: ...Square Dr Tek Screw Figure 1 2 Step 5 Insert Wire Cable through perimeter of Canopy Square Step 6 Attach Wire Cable Clamp to Wire Cable as shown in Figure 1 2 RETAINER BASE CLAMP WIRE CABLE NUT CLAMP...

Страница 290: ...nopy Jack Screws as shown in Figure 1 4 Step 9 Adjust Wire Cable overlap and Wire Clamp until Canopy is taut and D Rings are secure against retainers Slide Wire Cable around until Wire Cable Clamp is...

Страница 291: ...oof Canopy Support Leg shall have a multi stage baked on powder coat finish SHADE CANOPY SQUARE Shall be UV mildew resistant woven acrylic fabric folded and stitched for strength and to accommodate st...

Страница 292: ...g assembly B An appropriate energy absorbing safety surface is required under and around all playground equipment Loose fill protective surfacing is shown only as an example for the purpose of this as...

Страница 293: ...5 8 L Flanged Bearing WHEEL HUB 5 8 x 7 8 x 5 8 L Flanged Bearing FIGURE 2 1 2 Washer x 116 Thick 1 2 x 1 1 2 Button Head Bolt STEERING WHEEL BRACKET R5 SPLIT COLLAR HALF 1 2 Lock Nut 1 2 Washer x 116...

Страница 294: ...1 4 x 1 1 4 BH TR Tek Screw STEERING WHEEL BRACKET STEERING WHEEL BRACKET 3 8 x 1 Button Head Bolt 3 8 x 7 8 O D Washer WHEEL HUB 1 2 x 1 1 4 O D Washer 1 2 Thin Lock Nut DRIVER WHEEL CASTING FIGURE 5...

Страница 295: ...EL HUB 1 2 x 1 1 4 O D Washer 1 2 Thin Lock Nut 10 Pan Head Screw WHEEL BASE WHEEL INSERT 3 8 x 1 3 8 Barrel Nut WHEEL HUB SPACER FIGURE 6 Step 5 Attach Ships Wheel to Steering Wheel Bracket as shown...

Страница 296: ...1 1 4 OD 1 9415132 Nut Lock 1 2 4 9425002 Nut Lock 1 2 Thin 1 9335002 Washer Flat 1 2 116 thick 8 451172 Hex Key Wrench 1 8 SA 1 S 1812 R Part DESCRIPTION QTY BF 7068 Split Collar Half R5 1 FS 1812 R...

Страница 297: ......

Страница 298: ...ps installation instructions C The maximum height of rungs at grasping point from the top of the protective surfacing varies by age group Ages 2 5 60 1524mm above protective surfacing Ages 5 12 84 213...

Страница 299: ...UNTING BLOCK BOTTOM 1 2 SAE Washer 3 8 x 2 Barrel Nut R3 5 Assembly 3 8 x 1 Button Head Bolt 3 8 x 7 8 O D Thick Washer CRUNCH HANDLE Revolution Assembly Step 1 For R5 and R3 5 Versions locate and att...

Страница 300: ...t finish MOUNTING BLOCKS Shall be two part and precision die cast from a high strength aluminum alloy The Mounting Blocks have a multi stage baked on powder coat finish HARDWARE Shall be stainless ste...

Страница 301: ......

Страница 302: ...yground equipment can present a serious safety hazard Impact attenuating surfacing is required under and around all playground equipment and must be maintained For replacement parts additional mainten...

Страница 303: ...r plans for the site and consider the following important questions 1 Will the equipment be visible and accessible to the public 2 Will it be clearly separated from streets bike paths and playing fiel...

Страница 304: ...blication is free The American Society for Testing and Materials ASTM has published two related voluntary standards Standard F 1292 is entitled Standard Specifications for Impact Attenuation Systems U...

Страница 305: ...d equipment for preschool play locate this equipment at a sufficient distance from the older children s play area to minimize potential social conflicts Concrete Footings Verify that concrete footings...

Страница 306: ...hat each item that was NOT checked OK was either fixed on the spot or that the problem was carefully documented for repair on a Work Order Establish firm policies concerning the time frame allowed for...

Страница 307: ...factors noted above and any historical patterns that have been observed Inspection Repair Forms Creating Safety inspection and Repair Work Order Forms We have included with this manual a separate shee...

Страница 308: ...espective attachment hardware are secure and intact No ropes or strings have been attached to equipment Suggested PERIODIC Playground Maintenance Safety Inspection Points The Site Daily maintenance ha...

Страница 309: ...ave been inspected for integrity Rubber seats are not split and internal metal reinforcements are not exposed Seats are at ______ inches elevation proper elevations for each type of swing are specifie...

Страница 310: ...ng material around and beneath bridge is acceptable All attachment hardware is in place and secure Bearing points have been inspected for integrity and unacceptable wear Supporting bolts are secure Ha...

Страница 311: ...s Arch Climbers etc Safety surfacing material around and beneath stationary accessory is acceptable All connecting hardware is in place and secure All welds are sound Accessory shows no sign of horizo...

Страница 312: ...pairs in the field and are not intended to provide repair instructions for all situations If you have any questions about equipment repair for components listed in the following or for repair of equip...

Страница 313: ...es A Heat guns are available through most hardware stores B ln most cases damaged plastic cannot be repaired to its original condition Replacement of Hardware Replace all missing worn and or damaged h...

Страница 314: ...Playground Equipment Maintenance Guidelines Page 13 of 13 NOTES...

Отзывы: