www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or 541.955.9199 (International)
SINGLE POST SWINGS
INSTALLATION INSTRUCTIONS
Rev O
7/31/2019
PC-2181
Page 6 of 11
SWING SEAT
SHACKLE BOLT
SHACKLE
CHAIN
Figure 1.5
Figure 1.4
1/2" x 7"
Hex Bolt
2 Plcs
1/2" SAE
Washer
2 Plcs
1/2" Lock Nut
2 Plcs
1/2" SAE
Washer
2 Plcs
POST
SWING BEAM
Figure 1.3
SWING BEAM
1/2" Lock Nut
2 Plcs
1/2" SAE
Washer
2 Plcs
1/2" x 7" Hex Bolt
2 Plcs
1/2" SAE Washer
2 Plcs
ARCH SWING WASHER (R5)
2 Plcs
Step 7
For Belt and Bucket Seats Only
Attach Swing Seat to Chains as shown in Figure 1.5.
(See Notes A & E)
Step 6
For Additional Bay Only
Attach additional Arch Swing Beam to Post
as shown in Figure 1.4. (See Notes A & G)
Step 5
Place Posts into footing holes and attach Arch
Swing Beam to Post as shown in Figure 1.3.
(See Notes A & G)
Содержание Farm Sound Panel Insert R5
Страница 17: ......
Страница 31: ......
Страница 35: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 55: ......
Страница 59: ......
Страница 63: ......
Страница 71: ......
Страница 75: ......
Страница 79: ......
Страница 101: ......
Страница 113: ......
Страница 119: ......
Страница 139: ......
Страница 143: ......
Страница 145: ......
Страница 159: ......
Страница 171: ......
Страница 179: ......
Страница 183: ......
Страница 184: ......
Страница 185: ......
Страница 191: ......
Страница 197: ......
Страница 207: ......
Страница 211: ......
Страница 217: ......
Страница 221: ......
Страница 227: ......
Страница 235: ......
Страница 239: ......
Страница 243: ......
Страница 263: ......
Страница 297: ......
Страница 301: ......
Страница 314: ...Playground Equipment Maintenance Guidelines Page 13 of 13 NOTES...