IMPORTANT NOTES: Read First
For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com
STEEL BAR WALL ASSEMBLY
Rev K
4/12/2010
R5-1301
Page 1 of 3
FIGURE 1
Steel Bar Wall Assembly
(A) Use liquid thread lock (such as Loctite
®
) with all threaded hardware. Important: Liquid thread lock (prior to
curing) helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a
lubricant during assembly.
(B) Refer to Installation Manual for R5-09 Collars and R5-11 Socket Clamps assembly instructions.
(C) All gaps created (e.g. between walls, between wall and deck, between wall and roof, etc.) must be less than
3-1/2" [89mm] or greater than 9" [229mm].
(D) Collar heights will vary with different walls. Use wall to locate collar heights.
(E) These instructions apply for all configurations of R5 Walls, Short Walls, and Upper Walls.
Figure 1.2
GROUND MOUNT WALL
Figure 1.1
UPPER WALL
DECK MOUNT WALL
See Installation Manual
Sections R5-09 Collars
and R5-11 Clamps
Содержание Farm Sound Panel Insert R5
Страница 17: ......
Страница 31: ......
Страница 35: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 55: ......
Страница 59: ......
Страница 63: ......
Страница 71: ......
Страница 75: ......
Страница 79: ......
Страница 101: ......
Страница 113: ......
Страница 119: ......
Страница 139: ......
Страница 143: ......
Страница 145: ......
Страница 159: ......
Страница 171: ......
Страница 179: ......
Страница 183: ......
Страница 184: ......
Страница 185: ......
Страница 191: ......
Страница 197: ......
Страница 207: ......
Страница 211: ......
Страница 217: ......
Страница 221: ......
Страница 227: ......
Страница 235: ......
Страница 239: ......
Страница 243: ......
Страница 263: ......
Страница 297: ......
Страница 301: ......
Страница 314: ...Playground Equipment Maintenance Guidelines Page 13 of 13 NOTES...