TECHNICAL SUPPORT: (909) 259-6001
BLSL2250
21
Installation: Primary/Secondary Connections
Blk\Wht
Green
Red
Shield Wire
The control board provides a connector for Primary/Secondary connectivity. This
connector will allow synchronized operation with a second gate operator.
Shielded Cable
NOTE: Use 18
Guage Wire for
runs up to 100’
Conduit
Caution
– Do not run Primary/Secondary communication
cable in the same conduit as the power supply (120-220V) cable.
Inside
Outside
Primary
Primary
Operator
Secondary
Interconnecting Conduit
Opens First
Blk\Wht
Green
Red
Silver
BLSL2250 Manual_Layout 1 2/10/2014 4:40 PM Page 23
Содержание BLSL2250
Страница 1: ...BLSL2250 BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 1 ...
Страница 2: ...BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 2 ...
Страница 33: ...BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 33 ...
Страница 34: ...BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 34 ...
Страница 35: ...BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 35 ...