TECHNICAL SUPPORT: (909) 259-6001
BLSL2250
11
Mounting Instructions
STEP 1
Ensure the gate and operator are LEVEL
and PARALLEL prior to anchoring the
chassis to the concrete pad.
Minimum distance between the operator
and gate is 3”.
STEP 2
Secure the operator to the concrete pad
using Red Head 1/2” x 3-1/2” Anchors.
Always follow the manufacturers instructions
for proper installation. Refer to pg. 10 for
hole center dimensions.
.
NOTE:
Pre-installation procedure;
Manually open and close the gate, ensuring there is sufficient space between
adjacent walls and gate.
While pushing the gate to the open and closed positions, confirm that the
wheels turn freely on the track and there are no obstacles.
Ensure that there is plenty of space for the guide rollers and that there are
no obstacles throughout the movement of the gate.
BLSL2250 Manual_Layout 1 2/10/2014 4:40 PM Page 13
Содержание BLSL2250
Страница 1: ...BLSL2250 BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 1 ...
Страница 2: ...BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 2 ...
Страница 33: ...BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 33 ...
Страница 34: ...BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 34 ...
Страница 35: ...BLSL2250 Manual_Layout 1 2 10 2014 4 40 PM Page 35 ...