Removing Mail from the Flat Conveyor
Flat material will be stacked on the flat conveyor usually located under the last vertical stacker.
(The flat
conveyor can be positioned under any vertical stacker, generally it is located under the last one.
)
During the job the finished flat mailpieces are stacked under the vertical stacker onto the conveyor. As
more mail is processed the conveyor transfers the finished material out from the under the vertical
stacker.
To manually remove the mailpieces from the conveyor:
1. Press the button located on the end of the conveyor to turn the belt on and move the flat mailpieces
out from under the vertical stacker and down the belt.
2. Neatly stack the mail and remove it from the belt.
Flat Conveyor - Button
Running the System
Pitney Bowes
Epic Select Operator Guide
December, 2017
Page 184 of 288
Содержание Epic
Страница 27: ...3 Power the System On and Off In this section Power Up the System 22 Power Down the System 24 ...
Страница 32: ...This page intentionally left blank ...
Страница 193: ......
Страница 194: ...8 Error Recovery Error Recovery Pitney Bowes Epic Select Operator Guide December 2017 Page 188 of 288 ...
Страница 223: ...Foam Roller Raised for Jam Removal Error Recovery Pitney Bowes Epic Select Operator Guide December 2017 Page 217 of 288 ...
Страница 224: ...This page intentionally left blank ...
Страница 236: ...This page intentionally left blank ...
Страница 250: ...This page intentionally left blank ...
Страница 261: ...Executive Envelopes Letter Mode Specifications Pitney Bowes Epic Select Operator Guide December 2017 Page 255 of 288 ...
Страница 264: ...Side Seam Envelopes Letter Mode Specifications Pitney Bowes Epic Select Operator Guide December 2017 Page 258 of 288 ...
Страница 294: ...This page intentionally left blank ...