4. Continue to make fine adjustments to both ends of the chassis side guide - both down near the
observation guide and on the upstream section of the chassis guide - until it is set properly.
5. Confirm one last time down by the observation guide that the guides meet with the proper
alignment.
6. Place the widest document in the job between the guides and center it, leaving about 1/8-inch
(3.1mm) on each side.
7. Do this for any additional upstream chassis sections, maintaining the 1/8-inch (3.1 mm) gap on
either side of the material.
8. Close the feeder covers.
Operator Adjustments
Pitney Bowes
Epic Select Operator Guide
December, 2017
Page 102 of 288
Содержание Epic
Страница 27: ...3 Power the System On and Off In this section Power Up the System 22 Power Down the System 24 ...
Страница 32: ...This page intentionally left blank ...
Страница 193: ......
Страница 194: ...8 Error Recovery Error Recovery Pitney Bowes Epic Select Operator Guide December 2017 Page 188 of 288 ...
Страница 223: ...Foam Roller Raised for Jam Removal Error Recovery Pitney Bowes Epic Select Operator Guide December 2017 Page 217 of 288 ...
Страница 224: ...This page intentionally left blank ...
Страница 236: ...This page intentionally left blank ...
Страница 250: ...This page intentionally left blank ...
Страница 261: ...Executive Envelopes Letter Mode Specifications Pitney Bowes Epic Select Operator Guide December 2017 Page 255 of 288 ...
Страница 264: ...Side Seam Envelopes Letter Mode Specifications Pitney Bowes Epic Select Operator Guide December 2017 Page 258 of 288 ...
Страница 294: ...This page intentionally left blank ...