Remove or Add Vertical Stacker Side Guide
To remove or add a vertical stacker side guide:
1. Loosen both thumb screws that hold the guide in place.
2. Grasp the side guide and slide it to the left of the cross bars.
3. Lift the right side and remove the guide from the module.
Adjust a Vertical Stacker Side Guide
To adjust the position of a vertical stacker side guide:
1. Loosen both thumb screws and slide the guide on the bars to the desired position.
2. Tighten the thumb screws.
Note:
When running flats, remove the guides from all vertical stackers before the flats conveyor stacker.
Operator Adjustments
Pitney Bowes
Epic Select Operator Guide
December, 2017
Page 83 of 288
Содержание Epic
Страница 27: ...3 Power the System On and Off In this section Power Up the System 22 Power Down the System 24 ...
Страница 32: ...This page intentionally left blank ...
Страница 193: ......
Страница 194: ...8 Error Recovery Error Recovery Pitney Bowes Epic Select Operator Guide December 2017 Page 188 of 288 ...
Страница 223: ...Foam Roller Raised for Jam Removal Error Recovery Pitney Bowes Epic Select Operator Guide December 2017 Page 217 of 288 ...
Страница 224: ...This page intentionally left blank ...
Страница 236: ...This page intentionally left blank ...
Страница 250: ...This page intentionally left blank ...
Страница 261: ...Executive Envelopes Letter Mode Specifications Pitney Bowes Epic Select Operator Guide December 2017 Page 255 of 288 ...
Страница 264: ...Side Seam Envelopes Letter Mode Specifications Pitney Bowes Epic Select Operator Guide December 2017 Page 258 of 288 ...
Страница 294: ...This page intentionally left blank ...