Loading the Insert Feeders
1. Place one piece of material on the feeder belts.
Initial Loading
2. Shingle about a 1-inch (25 mm) stack of material and place it on top of the single piece.
3. Continue this until the stack is just about even with the top of the pack control ramp and then stack
to desired height.
Stack the Feeder -
do not shingle beyond the point noted in this image
Running the System
Pitney Bowes
Epic Select Operator Guide
December, 2017
Page 179 of 288
Содержание Epic
Страница 27: ...3 Power the System On and Off In this section Power Up the System 22 Power Down the System 24 ...
Страница 32: ...This page intentionally left blank ...
Страница 193: ......
Страница 194: ...8 Error Recovery Error Recovery Pitney Bowes Epic Select Operator Guide December 2017 Page 188 of 288 ...
Страница 223: ...Foam Roller Raised for Jam Removal Error Recovery Pitney Bowes Epic Select Operator Guide December 2017 Page 217 of 288 ...
Страница 224: ...This page intentionally left blank ...
Страница 236: ...This page intentionally left blank ...
Страница 250: ...This page intentionally left blank ...
Страница 261: ...Executive Envelopes Letter Mode Specifications Pitney Bowes Epic Select Operator Guide December 2017 Page 255 of 288 ...
Страница 264: ...Side Seam Envelopes Letter Mode Specifications Pitney Bowes Epic Select Operator Guide December 2017 Page 258 of 288 ...
Страница 294: ...This page intentionally left blank ...