2. Slide the wedge over the "goal posts" on the rotary feeder until it rests on the feeder deck.
Slide Wedge
3. Load the material into the feeder as usual.
4. When the job is finished, slide the wedge off the feeder and return to the back wall.
Operator Adjustments
Pitney Bowes
Epic Select Operator Guide
December, 2017
Page 137 of 288
Содержание Epic
Страница 27: ...3 Power the System On and Off In this section Power Up the System 22 Power Down the System 24 ...
Страница 32: ...This page intentionally left blank ...
Страница 193: ......
Страница 194: ...8 Error Recovery Error Recovery Pitney Bowes Epic Select Operator Guide December 2017 Page 188 of 288 ...
Страница 223: ...Foam Roller Raised for Jam Removal Error Recovery Pitney Bowes Epic Select Operator Guide December 2017 Page 217 of 288 ...
Страница 224: ...This page intentionally left blank ...
Страница 236: ...This page intentionally left blank ...
Страница 250: ...This page intentionally left blank ...
Страница 261: ...Executive Envelopes Letter Mode Specifications Pitney Bowes Epic Select Operator Guide December 2017 Page 255 of 288 ...
Страница 264: ...Side Seam Envelopes Letter Mode Specifications Pitney Bowes Epic Select Operator Guide December 2017 Page 258 of 288 ...
Страница 294: ...This page intentionally left blank ...