
28
3
Installation
3.1
Site Preparation
The rotator system should be located on a sturdy table or laboratory bench with
ample clearance around the perimeter of the rotator enclosure. The front of the
rotator should be unobstructed, and there should be at least 20 cm clearance on
each side and behind the rotator, for a total table space of 40 cm x 60 cm. The
location should also include enough space for the control unit
(30 cm x 30 cm) and vertical clearance to easily raise and lower the motor unit.
3.2
Unpacking and Setting Up the Rotator
Note:
The numbers in parentheses in the installation instructions
(below) correspond to the numbering used in the tables and
figures found in Section 2 of this manual.
Inspect the contents of the shipping carton.
Remove the top piece of cardboard to reveal
the two smaller boxes in the carton. The
control unit
(10)
is packed inside the larger
box, and the smaller box holds additional
components. Remove both boxes and set
aside. Then, carefully remove the enclosure
window
(7)
and the enclosure base
(4)
from
the box. The center post
(1)
is pre-installed in
the enclosure base.
Open the smaller box. It should contain the
motor unit
(2)
, the support collar
(5)
, the cell
platform
(3)
, the side post
(6)
, a standard
three-pronged laboratory clamp (with right-
angle mount), and a small bag containing
two banana cables and some additional
assembly hardware.
Note:
The outer diameter of the side post (6) shown in these photos is
5/8" (15.9 mm), but in some alternate rotator configurations this
diameter may be 1/2" (12.7 mm).
Содержание MSR 636A
Страница 2: ......
Страница 6: ...vi DRU10002 REV 004 JAN 2017...
Страница 31: ...25 DRU10002 REV 004 JAN 2017 Figure 2 5 Motor Unit Components 27 28 29 30 31 26 29 31 35 32 33 34...