Commissioning
Operating Manual PSENvip RL D P Set
1001641-EN-09
| 84
7.5.1.5
Function test using the test piece
Function test using the test rod (= test piece handle)
}
Move the test rod (14 mm diameter) slowly along the whole detection zone at the centre
point of the upper tool.
Fig.: Function test using test rod
The test rod must be detected along the whole length of the detection zone.
The OSSDs switch to the OFF state. The LED on the receiver lights up red.
INFORMATION
The following tests must be run on the left- and right-hand end as well as in
the centre of the press brake:
- During initial commissioning: 10 times
- During the daily check and during a tool change: 3 times
Function test with 10 mm and 15 mm test piece
}
Position the 10 mm high section of the test piece on top of the lower tool.
}
Initiate a press stroke.
Fig.: Function test using test piece