TECHNICAL MANUAL MT044
47
8.1
CHECKING THE TIGHTNESSES AND SETTING
1)
Very slowly open the on/off valve upstream from the regulator and using a foam solution or the like check:
• the tightness of the external surfaces of the regulator;
• the tightness of the slam-shut;
• the tightness of the internal surfaces of the regulator;
• the tightness of the fittings.
2) Operating very slowly, turn the reset lever, pos.
, of the slam-shut from the vertical position towards
the horizontal position until only the internal by-pass is opened. Then raise the lever completely to the
re-engage position.
• Check the tightness of the reinforced gasket of the regulator.
3)
Open a bleed cock downstream from the regulator to create a small gas flow.
4)
Screw in the adjustment screw pos. until the desired set-point value is reached.
5)
Close the bleed cock to the atmosphere.
8.2 START
UP
1)
Very slowly open the downstream on/off valve and, if necessary, adjust the regulator set-point by means of
the adjustment screw, pos. .
2)
Fix the lock-nut, pos. .
8.0 FINAL
OPERATIONS
36
74
74
44
Содержание NORVAL
Страница 2: ...TECHNICAL MANUAL MT044 2 Inlet pressure Outlet pressure NORVAL Issue February 2003 ...
Страница 4: ...4 ...
Страница 8: ...8 ...
Страница 10: ...TECHNICAL MANUAL MT044 10 5 Pe 4 1 3 2 74 Pa Fig 1 ...
Страница 36: ...TECHNICAL MANUAL MT044 36 7 2 NORVAL REGULATOR MAINTENANCE PROCEDURE Fig 17 ...
Страница 39: ...TECHNICAL MANUAL MT044 39 7 3 NORVAL REGULATOR I N MAINTENANCE PROCEDURE Fig 18 ...
Страница 43: ...TECHNICAL MANUAL MT044 43 7 4 MAINTENANCE PROCEDURE FOR THE NORVAL REGULATOR I N ER Fig 19 ...
Страница 50: ...TECHNICAL MANUAL MT044 50 9 0 LIST OF RECOMMENDED SPARE PARTS ...
Страница 51: ...TECHNICAL MANUAL MT044 51 NORVAL pression regulator ...
Страница 58: ...TECHNICAL MANUAL MT044 58 NOTES ...
Страница 59: ...TECHNICAL MANUAL MT044 Ordering Information Part No PFN375DN50 40 PFN375DN50 45 ...