TECHNICAL MANUAL MT044
27
ATTENTION
At the end of the operation, reconnect the control head to the downstream pressure take-off.
N.B.: The intervention tests should be repeated at least every 6 months.
At the end of the slam-shut check, proceed as follows:
1) check that the slam-shut is in the closed position;
2) open the inlet on/off valve V1;
3) very slowly open the slam-shut by turning the provided lever;
4) open the downstream bleed cock 6;
5) check on the pressure gauge 5 that the downstream pressure is at the desired regulator set-point. If it is not,
adjust the setting by means of the provided screw, turning it clockwise to increase it and anticlockwise to
decrease it;
6) close the bleed cock 6 and check the closing pressure value;
7) using a foam medium, check the tightness of all the joints between the on/off valves V1 and V2;
8) very slowly open the downstream on/off valve V2, until the line is completely filled;
9) check that when you operate the slam-shut manually, the flow in the line stops.
Содержание NORVAL
Страница 2: ...TECHNICAL MANUAL MT044 2 Inlet pressure Outlet pressure NORVAL Issue February 2003 ...
Страница 4: ...4 ...
Страница 8: ...8 ...
Страница 10: ...TECHNICAL MANUAL MT044 10 5 Pe 4 1 3 2 74 Pa Fig 1 ...
Страница 36: ...TECHNICAL MANUAL MT044 36 7 2 NORVAL REGULATOR MAINTENANCE PROCEDURE Fig 17 ...
Страница 39: ...TECHNICAL MANUAL MT044 39 7 3 NORVAL REGULATOR I N MAINTENANCE PROCEDURE Fig 18 ...
Страница 43: ...TECHNICAL MANUAL MT044 43 7 4 MAINTENANCE PROCEDURE FOR THE NORVAL REGULATOR I N ER Fig 19 ...
Страница 50: ...TECHNICAL MANUAL MT044 50 9 0 LIST OF RECOMMENDED SPARE PARTS ...
Страница 51: ...TECHNICAL MANUAL MT044 51 NORVAL pression regulator ...
Страница 58: ...TECHNICAL MANUAL MT044 58 NOTES ...
Страница 59: ...TECHNICAL MANUAL MT044 Ordering Information Part No PFN375DN50 40 PFN375DN50 45 ...