H MIN 5'
H MIN 13'
INSULATING
MATERIAL
TEE
TEE
DIRECTION
OF CLEANING
DIRECTION
OF CLEANING
DIRECTION
OF CLEANING
TEE
PELLET
STOVE
0 ÷ 10'
MIN 3%
SEE VENT MANUFACTURER'S
INSTRUCTIONS
Fig. 9
Ø 4"
Ø 3"
TEE W/TEE CAP
PELLET
STOVE
Fig. 8
Where 4” diameter pipe must be used, connect it to the stove flue outlet
with a 3” union-tee then use a 3” – 4” adaptor (Fig. 8).
Union-tee
The use of this type of fitting must allow for the collection of condensate
mixed with soot, which builds up inside the pipe.
It must also permit periodic cleaning of the flue without the need to
disassemble the pipes.
Single or double clean-out tees may be used.
An example is given below of a flueway connection, which allows
complete cleaning without having to disassemble the pipes (Fig. 9).
H07029330 / DT2001081 – 02
8
English
DT2033008-01
DT2033009-00
Содержание MARCELLA
Страница 50: ...H07029330 DT2001081 02 50 English...
Страница 51: ......