B
A
FLOOR
FLOOR
PROTECTION
METAL CHASSIS
Fig. 21
The stove has been tested and listed for mobile home installations.
Unit must be installed in accordance with the:
Manufactured Home
and Safety Standard (HUD), CFR 3280, Part 24
.
In addition to all previously detailed requirements, mobile home
installations must observe the following:
- Permanently bolt the stove to the floor. Use 4 screws [A] through the
4 holes placed at left and right side in the base plate as shown in
figure 21.
- Electrically ground the stove to the metal chassis of the home using a
number 8, gauge or larger copper wire [B].
- Maintain an effective vapor barrier at location where PL vent exits the
structure.
- Floor protection and clearances requirement must be followed
precisely as shown in the previous paragraphs.
- PL Vent must be used for exhaust venting. (Single wall vent is not
allowed). Follow PL Vent manufacturer’s installation directions and
observe all listed clearances to combustibles.
- Check any other local buildings codes or other codes that may apply.
d
WARNING: DO NOT INSTALL IN A SLEEPING ROOM.
a
Combustion air must come from the outside of the mobile
home!
Failure to do so may create negative pressure within the
mobile home and could disrupt proper venting and operation
of the pellet stove.
The user must routinely inspect the point where air is drawn
in to insure that it is clear of leaves/debris and ice or snow.
a
CAUTION: THE STRUCTURAL INTEGRITY OF THE FLOORS,
WALLS, CEILING AND ROOF MUST BE MAINTAINED.
a
The stove is hot while running. Keep children, clothing and
furniture away. Contact may cause skin burns.
a
Keep combustible materials such as grass, leaves,etc. at least
4 ft away from the point directly under the vent termination.
DT2010027-02
1.14 MObILE hOME INSTALLATION
H07029330 / DT2001081 – 02
14
English
DT2034027-00
Содержание MARCELLA
Страница 50: ...H07029330 DT2001081 02 50 English...
Страница 51: ......