16
Operation
Î
Place the side panel in position.
– Pay attention to the earthing cable!
Î
Similarly loosen the transportation lock on the opposite side.
Filling up the opera-
ting fluid
Only applies to HiCube with rotary vane pump as backing pump!
• The operating fluid reservoir is already filled and installed for the turbopump.
• The operating fluid for the rotary vane pump is enclosed with the delivery.
Î
Lift the carrying handle.
Î
Loosen two retaining screws each from a side panel.
Î
Remove the side panel:
– Lift the side panel approx. 2-3 cm from its adjustment and tilt it outwards.
– Disconnect the earthing cable from the terminal socket of the side panel.
– Remove the side panel from the pumping station.
Fig. 8: Filling the backing pump with operating fluid
Î
Unscrew operating fluid filler screw 25.1.
Î
Unscrew the operating fluid bottle's screw plug and screw the filler tube (both
included in the equipment pack).
Î
Insert the filler tube into the rotary vane pump's filler opening.
Î
Fill operating fluid according to rotary vane pump operating instructions.
Î
Screw in operating fluid filler screw 25.1.
Î
Check fill level: The correct fill level is between the markings on the sight glass.
– If the fill level has dropped below the "Min" marking, add operating fluid.
Î
Place the side panel in position.
– Pay attention to the earthing cable!
6.2 Operation modes
The following operation modes are available:
• Operation via RS485 and Pfeiffer Vacuum display and control units or PC
25
Backing Pump: Rotary Vane Pump
25.1 Filler Opening/Filler Screw
25.4 Operating Fluid Bottle
25.5 Filler Tube
25
25.5
25.1
25.4