Installation and commissioning
8 - 3
●
Set main switch
3
at position "
1
".
●
Turn regulator
1
until the hot-air pressure on gauge
2
is at least
0.2 bar
.
The hot-air pressure must not drop below
0.2 bar
!
If the hot-air pressure is too low, there is a risk of the heating rod burning out.
The heating therefore switches off automatically when the hot-air pressure is
too low.
8.
02
Commissioning
The machine must only be commissioned by qualified personnel. All relevant
safety regulations must be observed.
!
Check the machine, especially its electrical leads, for any damage.
!
Have qualified personnel check that the machine can be operated with the local mains
voltage and that it is correctly connected.
If anything is not correct, do not start the machine
under any circumstances
!
8
.03
Switching the machine on/off
Fig. 8 - 04
1
2
Fig. 8 - 05
3
From
the
library
of:
Diamond
Needle
Corp
Содержание 8304-040
Страница 47: ...13 2 91 211 718 95 Part 1 Version 28 03 01 Circuit diagram general plan From the library of Diamond Needle Corp...
Страница 48: ...13 3 Circuit diagram general plan Version 28 03 01 91 211 718 95 Part 2 From the library of Diamond Needle Corp...
Страница 49: ...13 4 91 211 718 95 Part 3 Version 28 03 01 Circuit diagram general plan From the library of Diamond Needle Corp...
Страница 50: ...13 5 Circuit diagram general plan Version 28 03 01 91 211 718 95 Part 4 From the library of Diamond Needle Corp...
Страница 51: ...13 6 91 211 718 95 Part 5 Version 28 03 01 Circuit diagram general plan From the library of Diamond Needle Corp...