
7 - 1
Controls
7
Controls
7
.01
Main switch
●
The machine is switched on or off by
turning main switch
1
.
Position "
0
" :
Machine is switched off
Position "
I
" :
Machine is switched on
When switching off the
machine, please observe the
notes in
Chapter 8.03
Switching the machine on
and off!
Fig. 7 - 01
1
7
.02
Foot switch
●
The heat-sealing process is carried out
using the 2 positions of foot switch
1.
Position 1
: Positioning the workpiece (top
feed roller is lowered)
Position 2
: Starting the heat-sealing
process (the hot-air nozzle is
swung into position/feed rollers
are started)
The functions triggered by
pedal
1
differ according to the
operational mode of the
machine (see
Chapter 7.08
Operational modes-selection
switch).
Fig. 7 - 02
1
From
the
library
of:
Diamond
Needle
Corp
Содержание 8304-040
Страница 47: ...13 2 91 211 718 95 Part 1 Version 28 03 01 Circuit diagram general plan From the library of Diamond Needle Corp...
Страница 48: ...13 3 Circuit diagram general plan Version 28 03 01 91 211 718 95 Part 2 From the library of Diamond Needle Corp...
Страница 49: ...13 4 91 211 718 95 Part 3 Version 28 03 01 Circuit diagram general plan From the library of Diamond Needle Corp...
Страница 50: ...13 5 Circuit diagram general plan Version 28 03 01 91 211 718 95 Part 4 From the library of Diamond Needle Corp...
Страница 51: ...13 6 91 211 718 95 Part 5 Version 28 03 01 Circuit diagram general plan From the library of Diamond Needle Corp...