
Set-up and Initial Start-up
21
8
Set-up and Initial Start-up
Check the machine for transport damage after unpacking it. Please notify the carrier and the
relevant PFAFF agency in the event of any damage.
The machine may only be set up and started up by qualifi ed personnel! All of
the relevant safety regulations must always be complied with in this process!
8
.01
Set-up
Suitable electrical supply connections must be provided at the erection site, see
chapter 3
Technical Data
. The erection site must also have a fi rm and level subsurface and adequate
lighting.
The table top is lowered for packaging purposes.
The adjustment of the table height is described below.
8
.01.01
Setting the table height
(PFAFF 3586-22/02, -23/01, -23/02)
(PFAFF 3586-24/02, -25/..)
Loosen the screws
1
and set the desired table height.
Tighten the screws
1
with
50
Nm.
The alignment on the lower frame tubes can be checked with a spirit level.
1
1
1
1
Fig. 8 - 01 a
Fig. 8 - 01
1
1
Содержание 3586-22/02
Страница 42: ...Set up 42...
Страница 157: ...Notizen...