21
6 - TIME ADJUSTMENTS
21.1
1 - TIMING FOR AIR BLAST STACKER
The duration of the air blast must be regulated so that the workpiece to be stacked is blown securely
on top of the stacker stand.
In order to increase or decrease the duration of the air blast press key
and numeric keys
and
.
In the bottom line of the display the following appears:
AIR BLAST ST.
along with the entered value in seconds.
Enter a new value by pressing numeric keys
to
and verify it by pressing the
key.
21.2
2 - TIMING FOR STACKER ROLLER (Running time of stacker roller)
The stacked workpieces must rest in a centered position on top of the stacker stand (fig. 1).
In order to increase or decrease the running time of stacker roller press key
and numeric
keys
and
.
In the bottom line of the display the following appears:
STACKER ROLLER
along with the entered value in seconds.
Enter a new value by pressing numeric keys
to
and verify it by pressing the
key.
Содержание 3568-12/12
Страница 1: ...3568 2 12 12 12 Instruction manual 296 12 17 360 Betriebsanleitung engl 01 94...
Страница 6: ...6...
Страница 10: ...10...
Страница 13: ...13 4 1 1 2 3 4 5 3 2 6 ABB_04_01 TIF ABB_16 TIF Wart cdr...
Страница 15: ...15 1 3 2 1 Wart cdr 1 ABB_10 TIF 4 Pult01_68 EPS 5 2 4 3 4 HS_off cdr HS_on cdr CLOSED OPEN...
Страница 21: ...21 1 2 3 3 4 5 6 7 ABB_02_02 TIF 2 1 ABB_06_01 TIF ABB_05 TIF...
Страница 23: ...23 4 3 2 1 3 ABB_02_02 TIF ABB_04 TIF 2 1 SPUL_12 TIF...
Страница 25: ...25 3 1 2 1 2 ABB_04 TIF ABB_06_01 TIF...
Страница 45: ...45 1 1 einlege cdr...
Страница 49: ...49 5 7 7 8 Max Water level 6 Wart cdr...
Страница 51: ...51 12 13 10 12 filter cdr ABB_02_02 TIF 11 9 ABB_26_03 TIF 8 9...