30 –
TANDEM
®
SYSTEM
BUILDING PILLARS
Begin by placing a row (8 units) of starter units on a base of
compacted crushed stone . Unfold the steel pillar grid and place it
on the prepared surface .
Insert the pillar connectors (using 2 connectors for each unit) into
the veneer units which form the first row of the pillar . Place the
veneer units for the first row around the steel pillar grid, making
sure to “click” the connectors onto the horizontal wires (refer to the
recommended installation pattern for the veneer units which have
been selected) .
1
ST
ROW OF STARTER UNITS