perma ECOSY
6.3
Check Prior to Operation
• Check the complete lubrication system for obvious damages!
• Was the system filled with the required and approved oil?
• Are all the parts correctly assembled and tightly screwed
together?
• Are all connections and tubes / pipes correctly sealed?
Make corrections if necessary.
Fill up perma ECOSY 5 reservoir according to chapter 7.
6.4
During Operation
• Carry out regular visual inspections during operation. You
should pay special attention to leakage and to the condition
of the lubrication system and screw connections!
• Check fill level regularly.
Inspection: at regular intervals, depending on discharge settings.
Recommendation: once a month.
• perma ECOSY 5 can be linked to a superior control system (see
chapter 10 “Connection of perma ECOSY 5”). The fill level will
then be monitored electronically and necessary refills will
automatically be signalled via the PLC.
• In case of malfunctions, refer to troubleshooting guide
in chapter 11. If the problem cannot be fixed, contact your
local supplier.