![Perlight Solar IRT Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/perlight-solar/irt/irt_installation-manual_1530978013.webp)
Perlight Solar IRT Integrated Roof Tile Installation Manual
13
www.perlight.com
V.03.2021 C2.6
The waterproof and drainage function of the modules
can be achieved only when the Male & Female Edges
are tightly connected.
There can be no dislocation in order to protect the
waterproof and drainage function.
There are three slots to lock the modules. Please lock
the module in the first slot. The module can be locked in
the second slot and maintain waterproof and drainage
function but if the module is locked in the third slot, there
will be a risk of leakage. See below.
Installation Steps (Example)
Waterproofing and Drainage
After the module is in the place, fix it with 5*30mm Self-Tapping Fixings (2-2) the same as the
first module.
When installing the rightmost side, pay attention to using the PLM-**MB-24 (R) (1-3), so that
the rightmost modules can be connected to the Flashing-Side Right (3-4).
Illustration
Warning
Lock in the first slot,
for best waterproof and
drainage function.
Lock in the second slot,
to basically meet the
requirements.
Avoid locking in the
third slot, there will be
a risk of leakage.