Perlight Solar IRT Integrated Roof Tile Installation Manual

12

www.perlight.com

V.03.2021 C2.6

Installation Steps (Example)

Placement of additional modules

After the first module (1-1) is fixed, you can continue to 

install the next module of the same row.

PLM-**MB-24 (M) (1-2) should be used in the middle 

section only.

Note that when the end of the row is reached, the 

rightmost module must be PLM-**MB-24 (R) (1-3).

We suggest that two installers carry the module 

by holding two sides. 

Insert the Male Edge of the 

second module into the Female Edge of the first 

module as shown in the picture.

At the same time, lock the Lower Frame of this 

module with the clamp slot of the Bottom Edge.

Lay the module down and slide down into position. 

Check the placement to make sure the whole frame 

is in place and the module is placed flat. Because the 

frame will slide down naturally, there may still be room 

between Lower Frame and Bottom Edge slot, and 

slight mismatches between the second module and 

the first module as shown in the picture. Pull down the 

second module to make the Lower Frame insert into 

the Bottom Edge slot.

To ensure alignment of the upper and lower parts of 

joining modules, a rubber hammer can be used to tap 

the Upper Frame of the module. Use a wooded strip 

with equal length to the module against the module 

edge and 

gently tap

 into final position. 

Do not strike 

with excessive force and do not strike the front 

side of the module.

Содержание IRT

Страница 1: ...Perlight Solar IRT Integrated Roof Tile Installation Manual...

Страница 2: ...w perlight com V 03 2021 C2 6 Table of Contents 1 Introduction 3 2 Class Application 3 3 Applicable Modules 3 4 Warning and Notes 4 5 Permit 5 6 Climate Condition 5 7 Module Structure 5 8 Mounting and...

Страница 3: ...d aging The colour of Perlight IRT is mainly black to blend in with the roof appearance Installation of Perlight IRT is very convenient in comparison to other products with the same functionality the...

Страница 4: ...s likely to experience conditions that produce more current and or voltage than reported at standard test conditions Accordingly the value of Isc and Voc marked on this module should be multiplied by...

Страница 5: ...s 6 Climate Conditions Install the Perlight Solar PV modules in the following conditions Ambient temperature 20 C to 40 C Operating temperature 40 C to 85 C Storage temperature 40 C to 40 C Humidity b...

Страница 6: ...outer left and outer right frames of Left Right modules is different from that of the Middle modules Outer left and right frames of Left Right modules connect to the flashing system Note The module Up...

Страница 7: ...each row Mid Clamp Right 2pcs on every module Material EPDM EPDM Stainless Steel Stainless Steel Part No 2 5 2 6 2 7 2 8 Fittings List Illustration Name Bottom Edge Self Tapping Fixing 5 30mm For IRT...

Страница 8: ...1 Flashing Top Mid 3 1 2 Flashing Top Left 3 2 3 Flashing Top Right symmetrical to 3 2 and has the same function 3 3 4 Flashing Side Left 3 4 5 Flashing Side Right symmetrical to 3 4 and has the same...

Страница 9: ...pacing is repeated on every subsequent row using the lower row anchor position in place of Bottom Edge position Install the modules left to right starting with the bottom row Complete the installation...

Страница 10: ...d Always begin IRT installation from the bottom left Complete the row from left to right before beginning installation of the row above Remember to only use PLM MB 24 L for the leftmost module of each...

Страница 11: ...the centre of Bottom Edge consistent The Upper Frame of the module needs to be fixed with Self Tapping Fixings 5 30mm 2 2 after it is put in place Fit module Mid Clamps Left 2 7 Right 2 8 to first mod...

Страница 12: ...me of this module with the clamp slot of the Bottom Edge Lay the module down and slide down into position Check the placement to make sure the whole frame is in place and the module is placed flat Bec...

Страница 13: ...terproof and drainage function but if the module is locked in the third slot there will be a risk of leakage See below Installation Steps Example Waterproofing and Drainage After the module is in the...

Страница 14: ...on of first row After the installation of the first row of modules is complete Seal Strip 01 2 6 is uniformly placed at the slot of the aluminium Upper Frame of the modules that runs below the anchor...

Страница 15: ...To ensure alignment of the upper and lower joining modules rubber hammer can be used to tap the upper edge of the module Use a wooded strip with equal length to the module against the Upper Frame and...

Страница 16: ...rom the bottom Begin with the bottom row and work upwards Installation of the second row flashing The installation of second row flashing is the same as the first both slide into the module outer Flas...

Страница 17: ...rical in shape and the installation method and function are the same Compared with the Flashing Top 3 1 the left and right virticle extension parts are added which are inserted into the Flashing Side...

Страница 18: ...e tiles at the side of the array Seal Strip 02 may be cut to fit the profile of the tile depending on tile type Finally lay the first row of tiles above the array ensuring the tiles do not protrude ov...

Страница 19: ...Perlight Solar IRT Integrated Roof Tile Installation Manual 19 www perlight com V 03 2021 C2 6 Installation Example...

Страница 20: ...cations where wiring is exposed to the direct rays of the Sun Field connections Connecting cables should be a minimum of 12 AWG copper cables which are UV resistant and insulated for a minimum of 90 C...

Страница 21: ...ng when the panels will be operating at a lower temperature and producing little energy Do not lean or stand on the modules during cleaning Do not use high pressure water jets to clean the solar modul...

Страница 22: ...igned to produce electricity for a minimum of 25 years however the panels may continue to offer useful energy for years to come after this point Once the panels reach the end of their useful life they...

Страница 23: ...Perlight Solar Co Ltd Oufeng Road Muyu Zeguo Town Wenling City Zhejiang Province 317521 China Tel 0086 576 86477920 www perlight com enquiry perlight com...

Отзывы: