Perlight Solar IRT Integrated Roof Tile Installation Manual
11
www.perlight.com
V.03.2021 C2.6
Installation Steps (Example)
Placement of the First Module
1st Module of
each row only
Install on
every module
Begin module installation with
PLM-**MB-24 (L) (1-1).
Slot the Lower Frame into the Bottom Edge. Fine
tune the position of module to keep the centre of the
module and the centre of Bottom Edge consistent.
The Upper Frame of the module needs to be fixed with
Self-Tapping Fixings 5*30mm (2-2) after it is put in
place.
Fit module Mid-Clamps: Left (2-7) & Right (2-8) to
first module.
1. Slide the module Mid-Clamp into the rear of the
module frame.
2. Slide down, locking into postion onto the supporting
and screw to secure using Self-Tapping Fixing
5*30mm (2-2).
Only the first module of each row requires two of
both Left & Right Mid-Clamps.
Every other module requires two Right Mid-Clamp
(2-8) only.
Left side Mid-Clamps (2-7)
Right side Mid-Clamps (2-8)