![Perkin-Elmer TITAN MPS Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/perkin-elmer/titan-mps/titan-mps_user-manual_1530159022.webp)
12
Safety Practices
Electrical Safety
The instrument has been designed to protect you from potential electrical hazards.
This section describes some recommended electrical safety practices.
The instrument must be correctly connected to a suitable electrical supply. The
supply must have a correctly installed protective conductor (earth ground) and
must be installed or checked by a qualified electrician before connecting the
instrument.
The product is designed and manufactured, having regard to the state of the art, to
ensure that:
Warning: Unauthorized Adjustments and Servicing
Only a PerkinElmer service engineer or similarly trained and authorized
person should be permitted to service the instrument.
Do
not
attempt to make adjustments, replacements, repairs, or
modifications to this instrument except as described in the documentation
supplied with the instrument.
Lethal voltages are present at certain areas within the instrument.
Installation and internal maintenance of the instrument should only
be performed by a PerkinElmer service engineer or similarly
authorized and trained person.
When the instrument is connected to
line power, opening the instrument covers is likely to expose live parts.
Even when the power switch is off, high voltages can still be present.
Capacitors inside the instrument may still be charged even if the
instrument has been disconnected from all voltage sources.
Any interruption of the protective conductor (earth ground) inside or
outside the instrument or disconnection of the protective conductor
terminal is likely to make the instrument dangerous. Intentional
interruption is prohibited.
!
Warning
!
Warning
!
Warning
Содержание TITAN MPS
Страница 1: ...TITAN MPS Customer Users Guide ATOMIC SPECTROSCOPY ...
Страница 2: ......
Страница 3: ...Titan MPS Users Guide ...
Страница 55: ...45 Power Cord Options Buck and Boost Transformer 0 5 KVA Japan and U S Canada Connections ...
Страница 98: ...88 Operation Figure 5 27 Sample Details review 1 8 Figure 5 28 Sample Details review 9 16 ...
Страница 104: ...94 Operation Sample Details Entering individual sample information ...
Страница 105: ...95 Digestion Results Digestion Results Reviewing the data from completed digestions ...
Страница 106: ...96 Operation Change Rename Datafile Locating and or renaming the datafile used to save digestion data ...
Страница 107: ...97 Create Method Create Method The process of generating a new method Once saved the method is permanently changed ...
Страница 108: ...98 Operation Edit Method The process of editing a current method Once saved the method is permanently changed ...
Страница 109: ...99 Data Management Data Management Options available via the Data button on the Home screen ...
Страница 120: ...110 Maintenance ...
Страница 122: ...112 Maintenance ...
Страница 132: ...122 Appendix Login Login 1 Select the login access desired ...
Страница 133: ...123 Index of Controller Screens Login Passcode 1 Enter the login passcode ...
Страница 150: ...140 Appendix Review Method Back Return to the Digestion Graph screen Next Go to the Review Sample Details 1 8 screen ...
Страница 156: ...146 Appendix ...
Страница 160: ......