2
Before inserting the bolt, make
sure dust is removed from
hole. Then screw the nut and
washer are on about 1/8”
below the top of the bolt. Next,
insert the wedge anchor bolt
into the hole. To protect the
threads and nut, tap the bolt
into the ground with a piece of
wood as a buffer.
When all posts have two L brack-
ets on, use a drill with 1/2" mason-
ry bit to drill down about 1/2"
farther than length of wedge
anchor.
Once the wedge anchor is
down against the bracket use a
wrench and tighten it. Do that
with all the anchors.
When all of the nuts have
been tightened down and
the posts are securely mount-
ed to the concrete slab, slide
the post trim down into place.
NOTE: If you ordered an
electrical package complete
step 6 of assembly instruc-
tions on page 24.