![Pereko AGRO Multi 12 Скачать руководство пользователя страница 92](http://html1.mh-extra.com/html/pereko/agro-multi-12/agro-multi-12_operation-and-maintenance-manual_1528315092.webp)
CONNECTION
8
CONNECTING WITH ecoMAX800 CONTROLLERS
This chapter applies to
ecoMAX800
P1, P2, R2, T2, D1, D2
controllers. It is
not applicable to
ecoMAX800R1
and
ecoMAX800T1
. In case of ecoMAX800
series, a
EL2adapter
must be used in order to connect ecoLINK2.
The following diagram shows a connection method.
EL2adapter
, where
1- Socket for RJ14 ecoLINK2
interface,
2- A plug for controller module COM
transmission socket,
3- Socket for a control panel plug
(together
with
ecoSTER
room
panel).
Содержание AGRO Multi 12
Страница 1: ...Operation and maintenance manual for the boilers with feeder AGRO Multi...
Страница 22: ......
Страница 23: ......
Страница 25: ...Multi PSQ SCREW CONVEYOR FEEDER U S E R S MA N UA L Updated user s manual are available at www pereko pl...
Страница 34: ......
Страница 36: ...wer 13 12 2017 r...
Страница 38: ......
Страница 43: ...REGULATOR INSTRUCTION MANUAL ecoMAX 910R1...
Страница 53: ...USER MANUAL OF CONTROLLER INSTALLATION AND SERVICE SETTINGS ecoMAX 910R1...
Страница 59: ...23...
Страница 83: ...47...
Страница 86: ......
Страница 87: ...3 This sign indicates relation to safety issues This sign indicates relations to module functional features...
Страница 114: ......
Страница 115: ......