4 • PAGE
User’s manual for screw-conveyor feeder Multi PSQ
2. ASSEMBLY INSTRUCTIONS
2.1. Feeder assembly
The Multi PSQ feeder is installed on four screws M12x20 to the connecting plate in the boiler. Precisely
seal the surface between the frame of the boiler and feeder using heat-resisting silicone to 1200°C.
Precisely check screw connections and tighten them
fi
rmly before
fi
rst start-up. Unscrew leg of the
feeder to ensure that it precisely adheres to the substrate after installation.
Note! Adjust leg of the feeder to ensure that it adheres to the substrate before
fi
lling the fuel container.
2.2. Sealing
Bottom cleaning hole located under sieve of the burner should be sealed with a heat-resistant sili-
cone up to 1200°C.
2.3. Assembly of post-combustion de
fl
ector
Chamotte plate (230
×
115
×
33 mm) used as a de
fl
ector for post-combustion of
fl
ammable gases is
enclosed in the boiler. The plate should be placed in accordance with the
fi
gure 1.
De
fl
ektor ceramiczny
P
ł
askownik
monta
ż
owy
de
fl
ektora
Ceramic de
fl
ector
Mounting
fl
at bar
for de
fl
ector
Figure 1.
Assembly of ceramic de
fl
ector
Содержание AGRO Multi 12
Страница 1: ...Operation and maintenance manual for the boilers with feeder AGRO Multi...
Страница 22: ......
Страница 23: ......
Страница 25: ...Multi PSQ SCREW CONVEYOR FEEDER U S E R S MA N UA L Updated user s manual are available at www pereko pl...
Страница 34: ......
Страница 36: ...wer 13 12 2017 r...
Страница 38: ......
Страница 43: ...REGULATOR INSTRUCTION MANUAL ecoMAX 910R1...
Страница 53: ...USER MANUAL OF CONTROLLER INSTALLATION AND SERVICE SETTINGS ecoMAX 910R1...
Страница 59: ...23...
Страница 83: ...47...
Страница 86: ......
Страница 87: ...3 This sign indicates relation to safety issues This sign indicates relations to module functional features...
Страница 114: ......
Страница 115: ......