Assembly and Operation Manual
electric raceways are laid. Cable routing inside the turnstile housing is shown in
Figure 8.
Figure 7 – TB-01 turnstile housing installation layout
9.4.3 Insert anchor bolts sleeves into the holes so that they did not stick out
above the floor surface. Remove the turnstile housing side covers (12, 14)
by unlocking the locks (13, 15). Set up the housing on anchor bolt sleeves
and fix it with the M10 bolts.
9.4.4 Install the turnstile power supply unit in its place (See power supply unit
certificate for installation procedure of the power supply unit).
9.4.5 Remove the turnstile housing top cover (3) by unlocking the lock with a
key (4 ref. Section 6).
9.4.6 Connect the power cable (18) to a connector block “X1.1” (Ref. Fig.
А
.1
Appendix
А
). Connect the cable (17) of the RC panel (16) to a connector
block “XT1.L” on the CLB (Fig. 3). Connect cables of other devices, when
used, to corresponding connector blocks of the CLB (Ref. Fig. 3 and
Fig.
А
.1 Appendix
А
).
9.4.7 Check serviceability and accuracy of all the electrical connections. Fix the
cables using self-adhesive cable tie mounts and nylon cable ties supplied
with a standard delivery set. After all cables are connected and the turn-
stile housing is fixed to the floor return the top cover (3) to its place (Ref.
Section 6) and the turnstile housing side covers (12, 14) in order reverse to
their removing.
9.4.8 To mount the barrier arms into the run position remove the cover (6) from the
hub after unscrewing the screw
М
4
х
25. Unscrew the
М
8
х
30 bolt on the
barrier arm (5). Fit the barrier arm into the mounting hole on the hub and
fasten it with the bolt. Put a spring washer under the bolt head. The bolts
must be tightened so as to ensure reliable non-play fixation of the barrier
arms.
Repeat the above-described procedure for fitting up the remaining barrier arms.
Put the cover (6) in its operation position and fix it with the screw.
9.4.9 Run a test switch on of the turnstile as specified in Clause 10.2.
After the installation and testing are complete the turnstile is ready to operate.
18