INSTALLATION continued
on
di
sinf
e
c
ted
w
at
er
s t
hat
m
ay
W
ar
nin
g:
Do
not
u
se
w
it
h
w
at
er
that
is
m
ic
robi
o
logi
c
al
ly
un
s
af
e
or
of
©
2
01
0
P
en
ta
ir
Re
si
den
ti
a
l
Filt
ra
ti
on
,
M
ilw
au
kee
,
W
I,
U
S
A
A
ss
e
m
b
led
i
n
C
h
ina
B
9. Installing the Cartridges
The cartridges are identified by the color of the label and
the model number.
Cartridge #1 = PW-S2500R, Yellow
Cartridge #2 = PW-C5000R, Blue
Cartridge #3 = PW-RO75R, Green
Cartridge #4 = PW-C2500R, Violet
Install the cartridges in order. If the cartridges are installed
out of order the system will not filter correctly.
A. Slide the cartridge into the head until it stops.
B. Twist the cartridge 1/4 turn clockwise until it snaps into
place. Gently pull out on the cartridge to ensure the
cartridge is locked into place.
11. Putting the System Into Operation
CAUTION
Make certain head assembly is firmly attached
to wall to prevent it from falling and possibly
becoming damaged.
NOTE: Use caution not to bend or pinch the tubing behind
the system while attaching to mounting screws.
NOTE: The post-polishing filter may contain fine black
carbon particles. These fines are harmless, but
may make the water appear gray in color. The
carbon fines are flushed from the system with the
first tank full of water.
NOTE: The PB4RO system does not produce a high
volume of water on demand as an ordinary filter
does. Water is produced at a slow, drop-by-drop
rate. The system requires about 3 hours to fill the
storage tank. As water is taken from the tank, the
system automatically starts the cycle of replacing
the water and then stops water production when
the tank is full.
2
Qui ck Ch ang e
Sed im ent
Cartridg e
CA PAC IT Y :
Repl ace ever y 12 mont hs
T E M P ER AT UR E RA N G E:
40-1 00° F (4. 4-37. 8°C )
PR E S S UR E RAN G E :
30 -12 5° F ( 2. 4- 8.6 B a r)
For u se with
P entair W ater
m odels: P B 4RO-
75, PP 4RO-75 and
P B 5RO-75
5
Qui ck
Chang e
EP
Cartridg e
CA P A CI T Y :
Re plac e
ev er y 1 2
m on th s
T E M P E R A T U
R E R AN G E :
40 -1 00° F
(4 .4 -3 7.8 °C )
PR E S S UR E
RAN G E :
30 -1 25
°
F (2. 4-8.6 Bar)
For u se with
P entair Wat er
m odels: P B 4RO -
75, P P 4RO-75 and
P B 5RO-75
1
2
3
Figure 13
A. Make sure cold water faucet is “off” (Figure 14).
B. Make sure tank valve is in the open position.
C. Slowly turn on cold water supply.
D. Open the faucet to turn on flow. Let the faucet run/drip
for 12 hours, then close it.
E. Allow 3 hours for the tank to fill. Continue to periodically
A
check the installation for leaks. After the storage tank
is filled, open the faucet to flush the post-filter cartridge
(on the right side of the filter housing). Allow 4 to 5
minutes for all of the water to drain from the tank. Close
faucet and allow tank to fill.
CAUTION
Visually check the entire system for leaks. If a leak is
10. Connecting the Storage Tank to the System
CAUTION
When tank is full, it weighs approximately 35
pounds. Provide ample support under the tank.
A. Apply 3-5 wraps of Teflon tape to the tank threads.
B. Thread the tank valve onto the top of the tank opening
by turning it clockwise until snug.
C. Locate the green tubing and a mark 3/4" from the end.
Moisten one end of the green tubing with water and
insert with a twisting motion into the free port of the tank
valve until the 3/4" mark is flush with the quick-connect
fitting.
NOTE: Do not cut green tube. This line should be left at
the pre-cut length for future service.
NOTE: The pressurized storage tank has capacity of
3.2 gallons. The tank's air pressure is factory
set at 5 to 7 psi when tank is empty.
present, see TROUBLESHOOTING.
F. Repeat Step E four times.
NOTE: Initially, the water may appear cloudy. This is a
result of air trapped in the post-filter cartridge.
It is not harmful and will disappear in a matter
of minutes. It may take up to a week after
installing a new post-filter cartridge for the
trapped air to dissipate.
The system is ready for operation. You can now enjoy quality
water from the PB4RO-75.
Closed
Tank Valve
Open
Tank Valve
Figure 14
Model PB4RO-75 Undersink Reverse Osmosis System JA12 • 9
Содержание PB4RO-75
Страница 5: ...INSTALLATION continued Figure 3 Model PB4RO 75 Undersink Reverse Osmosis System JA12 5 ...
Страница 10: ......
Страница 13: ...F Repeat Step E four times Model PB4RO 75 Undersink Reverse Osmosis System JA12 ...
Страница 14: ......
Страница 18: ...10 11 14 JA12 Model PB4RO 75 Undersink Reverse Osmosis System ...
Страница 20: ......