57
REPAIR PARTS
Description
Quantity
Required
Stock Code
1
Tank, Condensate Neutralizer
1
54121
–
Neutralizer, Bag
1
54159
2
Cap, Neutralizer Tank
1
5430
3
Clamp, 3/4" ID Tubing
4
54138
4
Pre-formed 3/4" ID Tubing, Tank to Jacket, with (2) clamps
1
54172
5
Tubing, 3/4" ID x 1/8" Wall PVC, 19.5" LG
19.5"
5417
6
Tank, Condensate Collector
1
54120
7
Condensate Switch Float Assembly with Cap
1
54137
8
Tubing, 3/4" ID x 1/8" Wall PVC, 6.5" LG
6.5"
5417
9
Clamp, 5/8" ID Tubing
2
54139
10
Tubing, 5/8" ID x 1/8" Wall PVC
9.5"
5416
Содержание PF-110
Страница 18: ...16 WATER PIPING AND CONTROLS Figure 4 6 Two Boilers Primary Secondary with Four Zones Zone Circulator ...
Страница 19: ...17 WATER PIPING AND CONTROLS Figure 4 7 Three Boilers Primary Secondary with Five Zones Zone Circulator ...
Страница 20: ...18 WATER PIPING AND CONTROLS Figure 4 8 Three Boilers Primary Secondary with Four Zones Zone Valves ...
Страница 30: ...28 ELECTRICAL CONNECTIONS Figure 7 4 Internal Wiring Schematic ...
Страница 56: ...54 REPAIR PARTS ...
Страница 58: ...56 REPAIR PARTS ...
Страница 60: ...58 APPENDIX A STATUS SCREENS APPENDIX A STATUS SCREENS ...
Страница 61: ...59 APPENDIX A STATUS SCREENS ...
Страница 62: ...60 APPENDIX A STATUS SCREENS ...
Страница 63: ...61 APPENDIX B USER MENU APPENDIX B USER MENU ...
Страница 64: ...62 APPENDIX C INSTALLER MENU APPENDIX C INSTALLER MENU ...
Страница 65: ...63 APPENDIX C INSTALLER MENU ...
Страница 66: ...64 APPENDIX C INSTALLER MENU ...
Страница 68: ...66 NOTES ...
Страница 69: ...67 NOTES ...