C. ACCESSIBILITY CLEARANCES
1. The
P
URE
F
IRE
boiler is certified for closet installations
with zero clearance to combustible construction. In
addition, it is design certified for use on combustible
floors.
2. Refer to Figure 1.1 for the minimum recommended
clearance to allow for reasonable access to the boiler.
Local codes or special conditions may require greater
clearances.
D. COMBUSTION AND VENTILATION AIR
1. The
P
URE
F
IRE
boiler is designed only for operation
with combustion air piped from outside the building
(sealed combustion). PVC pipe must be supplied and
connected between the air inlet connection and an
outside wall or roof. Reference Section 3 for vent and
air inlet piping requirements.
2. No additional combustion or ventilation air is required
for this appliance.
3. Refer to Section 3 of this manual, Venting, for specific
instructions for piping combustion air.
E. PLANNING THE LAYOUT
1. Prepare sketches and notes showing the layout of the
boiler installation to minimize the possibility of
interferences with new or existing equipment, piping,
venting and wiring.
2. The following sections of this manual should be
reviewed for consideration of limitations with
respect to:
a. Venting and Air Inlet Piping: Section 3
b. Water Piping: Section 4
c. Fuel Piping: Section 5
d. Condensate Removal: Section 6
e. Electrical Connections: Section 7
f.
Boiler Control: Section 8
g. Boiler Dimensions and Ratings: Section 12
3
PREINSTALLATION
Do not install this boiler where gasoline or other
flammable liquids or vapors are stored or are in use.
WARNING
This boiler is certified as an indoor appliance. Do not
install this boiler outdoors or locate where it will be
exposed to freezing temperatures.
WARNING
Do not install this boiler on carpeting.
DANGER
Figure 1.1: Minimum Accessibility Clearances
Содержание PF-110
Страница 18: ...16 WATER PIPING AND CONTROLS Figure 4 6 Two Boilers Primary Secondary with Four Zones Zone Circulator ...
Страница 19: ...17 WATER PIPING AND CONTROLS Figure 4 7 Three Boilers Primary Secondary with Five Zones Zone Circulator ...
Страница 20: ...18 WATER PIPING AND CONTROLS Figure 4 8 Three Boilers Primary Secondary with Four Zones Zone Valves ...
Страница 30: ...28 ELECTRICAL CONNECTIONS Figure 7 4 Internal Wiring Schematic ...
Страница 56: ...54 REPAIR PARTS ...
Страница 58: ...56 REPAIR PARTS ...
Страница 60: ...58 APPENDIX A STATUS SCREENS APPENDIX A STATUS SCREENS ...
Страница 61: ...59 APPENDIX A STATUS SCREENS ...
Страница 62: ...60 APPENDIX A STATUS SCREENS ...
Страница 63: ...61 APPENDIX B USER MENU APPENDIX B USER MENU ...
Страница 64: ...62 APPENDIX C INSTALLER MENU APPENDIX C INSTALLER MENU ...
Страница 65: ...63 APPENDIX C INSTALLER MENU ...
Страница 66: ...64 APPENDIX C INSTALLER MENU ...
Страница 68: ...66 NOTES ...
Страница 69: ...67 NOTES ...