53
REPAIR PARTS
Description
Quantity
Required
Stock Code
1
Panel, Jacket Front Door, with Ball Studs
1
54168
2
Lens for Jacket Front Door
1
54167
3
Display Module, Argus 852RC
1
54104
4
Gasket for Display Bracket
1
54153
5
Bracket for Display Module
1
PF2007
6
Hex Nut, #6-32 w/ Lockwasher
2
51553
7
Screw, #6-32 x 1/2 LG Phillips Head
2
5449
8
Gas Valve Line, Flexible
1
54129
9
Gasket for Gas Line
1
54142
10
Nipple, 1/2" NPT x Close
1
99211
11
Manual Shut-off Valve, 1/2" NPT
1
54130
12
Screw, #10x1/2" LG Hex Hd
2
99992
13
Coupling, 1"NPT SS
2
5424
14
Nipple, 1" NPT x 6" LG SS
2
5423
15
Jacket Side Panels - PF-50, PF-80
1
54173
Jacket Side Panels - PF-110, PF-140
1
54192
17
Bulk Head Fitting for Condensate Hose
1
54140
18
Gasket for Bulk Head Fitting
1
54134
19
Leg Leveler
4
5429
20
Hook Bolt
2
5451
21
Convenience Outlet
1
54136
22
Hex Nut, 8-32 with Lockwasher
4
51573
23
Control Module, 852MN - PF-50
1
54162
Control Module, 852MN - PF-80
1
54163
Control Module, 852MN - PF-110
1
54164
Control Module, 852MN - PF-140
1
54165
24
Switch, Round Toggle, 120 VAC
1
6049
25
Vent / Air Inlet Adapter
1
54135
26
Gasket, Vent Adapter
1
54133
27
Screw, #10 x 5/8"LG Phil Pan HD Type A Zinc
6
5507
-–
Wiring Harness, Power (Right Terminal Block)
1
PF7002
-–
Wiring Harness, Control (Left Terminal Block)
1
PF7003
-–
Wiring Harness, Blower
1
PF7005
-–
Wiring Harness, Ground Wire
1
PF7009
-–
Push-on Terminal Block (Field Wiring)
2
5450
-–
Ignition Cable
1
54115
-–
Rocker Switch
1
6049
-–
Relief Valve, 30 PSI
1
50664
-–
Flue Sensor, 12K, TSD20B1
1
54111
-–
Supply Sensor / Limit, 12K, TSDS955
1
54110
-–
Return Sensor, 12K, TSD00BS
1
54109
-–
Outdoor Sensor, 12K, TSA00B4
1
54112
-–
DHW Sensor, 12K
Optional
54157
-–
System Sensor, 12K, TSA00BC
Optional
54156
-–
PVC Concentric Vent Terminal
Optional
91403
-–
Stainless Steel Vent Terminal
Optional
54161
Содержание PF-110
Страница 18: ...16 WATER PIPING AND CONTROLS Figure 4 6 Two Boilers Primary Secondary with Four Zones Zone Circulator ...
Страница 19: ...17 WATER PIPING AND CONTROLS Figure 4 7 Three Boilers Primary Secondary with Five Zones Zone Circulator ...
Страница 20: ...18 WATER PIPING AND CONTROLS Figure 4 8 Three Boilers Primary Secondary with Four Zones Zone Valves ...
Страница 30: ...28 ELECTRICAL CONNECTIONS Figure 7 4 Internal Wiring Schematic ...
Страница 56: ...54 REPAIR PARTS ...
Страница 58: ...56 REPAIR PARTS ...
Страница 60: ...58 APPENDIX A STATUS SCREENS APPENDIX A STATUS SCREENS ...
Страница 61: ...59 APPENDIX A STATUS SCREENS ...
Страница 62: ...60 APPENDIX A STATUS SCREENS ...
Страница 63: ...61 APPENDIX B USER MENU APPENDIX B USER MENU ...
Страница 64: ...62 APPENDIX C INSTALLER MENU APPENDIX C INSTALLER MENU ...
Страница 65: ...63 APPENDIX C INSTALLER MENU ...
Страница 66: ...64 APPENDIX C INSTALLER MENU ...
Страница 68: ...66 NOTES ...
Страница 69: ...67 NOTES ...