24 - EN
5 Preventative
Maintenance
5.1 Cleaning
Clean the equipment with a damp cloth only and avoid excessive moisture around any electrical sockets. If required you may use a mild
detergent, however do not use abrasives or solvents as they may damage the warning labels on the equipment.
5.2 Maintenance Schedule
Key:
Description Of Service Required
Service Recommended Every:
1
1. The service operations should be performed at the hours run or fixed time intervals specified (whichever occurs first)
Component
Operation
Daily
3
Months
(200
0 Hrs.
)
6
Months
(400
0 Hrs.
)
12 Months
(800
0 Hrs.
)
24 Months
(16
000 Hr
s.)
36 Months
(24
000 Hr
s.)
60 Months
(40
000 Hr
s.)
Generator
Check the status indicators located on the front panel.
System
Check the inlet air quality.
Generator
Check for air leaks
Generator
Check the pressure gauges during purging for excessive back pressure.
Generator
Check the condition of the electrical supply cables and conduits.
Generator
Check oxygen sensor(s) and calibrate if necessary
Generator
Check for cyclic operation
Filtration
Replace Exhaust silencer and filter element(s)
Recommended Service A
Generator
Replace Oxygen sensor(s)
Recommended Service B
Generator
Replace control valves
Recommended Service C
Generator
Replace cylinder and solenoid valves
Recommended Service D
Check
(Operator)
Essential Procedure
(Service Personnel only)
Essential Procedure
(Responsible Body or Service Personnel only)