Ventilation Clearance Requirements
The inverter gives off heat in normal operation and must therefore be mounted to allow the free flow of air
through the ventilation slots and heatsink:
-
Maintain minimum clearances for ventilation as given in the tables below to ensure adequate
cooling of the inverter, and that heat generated by other adjacent equipment is not transmitted to
the inverter.
-
Be aware that other equipment may have its own clearance requirements.
-
When mounting two or more inverters together, these clearances are additive.
-
Ensure that the mounting surface is normally cool.
-
The inverter must be mounted in a suitable cubicle.
Frames 2
– 6:
Minimum Air Clearance for Product:
Frame 3 is shown for illustration only.
Frame
Size
Product Clearances
A
B
C
D
2
10.0
(0.39)
150.0
(5.91)
150.0
(5.91)
50.0
(1.97)
3
10.0
(0.39)
150.0
(5.91)
150.0
(5.91)
50.0
(1.97)
4
10.0
(0.39)
150.0
(5.91)
150.0
(5.91)
50.0
(1.97)
5
10.0
(0.39)
150.0
(5.91)
150.0
(5.91)
50.0
(1.97)
6
10.0
(0.39)
200.0
(7.87)
150.0
(5.91)
50.0
(1.97)
All dimensions in millimeters
(inches)
Note: The wiring bracket (Frames 2-5 only), does not affect the clearance dimension below the product
(dimension C).
Forced
Air Flow
Natural Air Flow
Содержание AC20F Series
Страница 144: ...MSG11 5715 743 EN AC20F Series Hardware Installation Manual 144 148 MSG11 5715 743 EN 24 04 2023 Frame 3...
Страница 145: ...MSG11 5715 743 EN AC20F Series Hardware Installation Manual MSG11 5715 743 EN 24 04 2023 145 148 Frame 4 Frame 5...
Страница 146: ...MSG11 5715 743 EN AC20F Series Hardware Installation Manual 146 148 MSG11 5715 743 EN 24 04 2023 Frame 6 Frames 7 8...
Страница 147: ...MSG11 5715 743 EN AC20F Series Hardware Installation Manual MSG11 5715 743 EN 24 04 2023 147 148 Frame 9 Frame 10...
Страница 148: ...MSG11 5715 743 EN AC20F Series Hardware Installation Manual 148 148 MSG11 5715 743 EN 24 04 2023...