Contents
ii
November
2004
8820-A2-GN20-80
Installing Line Cards into Slots 7 and 16 . . . . . . . . . . . . . . . . . . . . . . .
2-24
Installing a Line Card into Slot 9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2-24
Installing Line Cards into Slots 8 and 18 . . . . . . . . . . . . . . . . . . . . . . .
2-24
Installing an SCM Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2-26
Verifying the Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2-27
3
Cabling: Line Card Tip and Ring
Installing Network Tip and Ring Connections . . . . . . . . . . . . . . . . . . .
3-1
Connecting a Line Card Using Cable Ties. . . . . . . . . . . . . . . . . . .
3-2
Installing Locking Pivot Brackets . . . . . . . . . . . . . . . . . . . . . . . . . .
3-2
Cable Management Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3-4
Split Cable Bushings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3-5
4
Cabling: Standard SIM
Standard SIM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4-1
Connecting Clock Sources to Clock A and Clock B . . . . . . . . . . . . . . .
4-2
Connecting an MCP Card to a Terminal or PC . . . . . . . . . . . . . . . . . .
4-2
Connecting to a Modem for Remote Management (with MCP) . . . . .
4-3
Connecting an SCP Card to a Terminal or PC. . . . . . . . . . . . . . . . . . .
4-4
Connecting the Alarm Out Port to a CO Alarm System . . . . . . . . . . . .
4-4
Connecting an SCP Card to an SNMP Management System . . . . . . .
4-5
Connecting an MCP to an SNMP Management System . . . . . . . . . . .
4-5
Connecting to the IPC, Ethernet Hubs, or Switches . . . . . . . . . . . . . .
4-6
Hot Insertion or Removal of the SIM . . . . . . . . . . . . . . . . . . . . . . . . . .
4-6
5
Cabling: Test Access SIM
Test Access SIM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5-1
Connecting Clock Sources to Clock A and Clock B . . . . . . . . . . . . . . .
5-2
Connecting an MCP Card to a Terminal or PC . . . . . . . . . . . . . . . . . .
5-2
Connecting to a Modem for Remote Management (with MCP) . . . . .
5-3
Connecting an SCP Card to a Terminal or PC. . . . . . . . . . . . . . . . . . .
5-4
Connecting to a Modem for Remote Management (with SCP Card) .
5-4
Connecting the Alarm In Port to an External Alarm . . . . . . . . . . . . . . .
5-5
Connecting Alarm Out to the CO Alarm System . . . . . . . . . . . . . . . . .
5-6
Connecting an MCP to an SNMP Management System . . . . . . . . . . .
5-6
Connecting an SCP Card to an SNMP Management System . . . . . . .
5-7
Connecting the Hub-1 and Hub-2 LAN Ports . . . . . . . . . . . . . . . . . . . .
5-7
Using the Test Access Path (TAP) Ports . . . . . . . . . . . . . . . . . . . . . . .
5-8
Hot Insertion or Removal of the SIM . . . . . . . . . . . . . . . . . . . . . . . . . .
5-8
Содержание 8820
Страница 1: ...8820 Broadband Access Concentrator Installation Guide Document No 8820 A2 GN20 80 November 2004...
Страница 10: ...Contents iv November 2004 8820 A2 GN20 80...
Страница 14: ...About This Guide viii November 2004 8820 A2 GN20 80...
Страница 20: ...1 Introduction 1 6 November 2004 8820 A2 GN20 80...
Страница 48: ...2 Installation 2 28 November 2004 8820 A2 GN20 80...
Страница 54: ...3 Cabling Line Card Tip and Ring 3 6 November 2004 8820 A2 GN20 80...
Страница 78: ...A Pinouts A 8 November 2004 8820 A2 GN20 80...
Страница 82: ...B Technical Specifications B 4 November 2004 8820 A2 GN20 80...
Страница 86: ...Index IN 4 November 2004 8820 A2 GN20 80...