4. Cabling: Standard SIM
4-6
November 2004
8820-A2-GN20-80
Connecting to the IPC, Ethernet Hubs, or Switches
Use this procedure for connecting RADSL, MVL, ReachDSL/MVL, IDSL, and
SDSL cards to the IPC, Ethernet hubs, or switches. For other types of cards, refer
to the appropriate Installation Instructions.
Procedure
To connect the 8820 BAC to the IPC, Ethernet hubs, or switches:
1. Plug an 8-pin modular UTP CAT5 cable into LAN jack Port 1 for connecting the
LAN wiring from the line card in Slot 1. Repeat this step for jack Port 2 for the
line card in Slot 2, etc.
2. Dress the cable(s) to the right and through the cable retainer.
3. Plug the other end of the cable into your IPC, Ethernet hub connector, or
switch.
Hot Insertion or Removal of the SIM
If the port-card Ethernet interfaces are not being used, it is possible to remove the
SIM without disrupting user data. However, if the user terminal (console) or
10BaseT management interface is connected, the management interface of the
BAC will be interrupted. Also, the MAC addresses of the management interfaces
will be redefined by the new SIM.
The SCP card must be reset when the SIM is removed or inserted.
SERIAL
SCM
CLOCK
A
ALARM
2
4
6
8
10
12
14
16
18
1
3
5
7
9
11
13
15
17
LAN SLOT
B
CLOCK
B
A
SERIAL
MCP
AC
ALARM
LAN Slot
Port 1
99-16559
Содержание 8820
Страница 1: ...8820 Broadband Access Concentrator Installation Guide Document No 8820 A2 GN20 80 November 2004...
Страница 10: ...Contents iv November 2004 8820 A2 GN20 80...
Страница 14: ...About This Guide viii November 2004 8820 A2 GN20 80...
Страница 20: ...1 Introduction 1 6 November 2004 8820 A2 GN20 80...
Страница 48: ...2 Installation 2 28 November 2004 8820 A2 GN20 80...
Страница 54: ...3 Cabling Line Card Tip and Ring 3 6 November 2004 8820 A2 GN20 80...
Страница 78: ...A Pinouts A 8 November 2004 8820 A2 GN20 80...
Страница 82: ...B Technical Specifications B 4 November 2004 8820 A2 GN20 80...
Страница 86: ...Index IN 4 November 2004 8820 A2 GN20 80...