3150-A2-GB24-10
March 2001
2-1
2
Installation
Overview
This chapter contains information for installing your standalone CSU. It includes
application examples, cabling, and power-on information.
NOTE:
Installation instructions for the carrier-mounted CSU are located in the
ACCULINK 3151 CSU and 3161 DSU/CSU General Information Guide
and
the
COMSPHERE 3000 Series Carrier Installation Manual
.
Application Example
The CSU acts as an interface between the T1 digital network and the customer’s
equipment.
Figure 2-1, Application Example
, shows an example of a CSU
application.
The CSU is connected to the customer’s equipment through the DTE interface. It
is connected to the T1 digital network through the network interface.
Figure 2-1.
Application Example
NETWORK
PBX
496-14821-02
CSU
Содержание 3151
Страница 1: ...ACCULINK CSU Models 3150 A4 and 3151 Operator s Guide Document No 3150 A2 GB24 10 March 2001 ...
Страница 16: ...About This Guide x March 2001 3150 A2 GB24 10 ...
Страница 28: ...2 Installation 2 8 March 2001 3150 A2 GB24 10 ...
Страница 40: ...3 Using the Front Panel 3 12 March 2001 3150 A2 GB24 10 ...
Страница 66: ...4 Configuration 4 26 March 2001 3150 A2 GB24 10 ...
Страница 74: ...5 Security 5 8 March 2001 3150 A2 GB24 10 ...
Страница 118: ...8 Testing 8 18 March 2001 3150 A2 GB24 10 ...
Страница 120: ...A Front Panel Menu A 2 March 2001 3150 A2 GB24 10 ...
Страница 152: ...C Configuration Options C 30 March 2001 3150 A2 GB24 10 ...
Страница 168: ...E Pin Assignments E 10 March 2001 3150 A2 GB24 10 ...
Страница 192: ...F SNMP MIB Objects F 24 March 2001 3150 A2 GB24 10 ...
Страница 218: ...J Equipment List J 2 March 2001 3150 A2 GB24 10 ...
Страница 228: ...Glossary GL 10 March 2001 3150 A2 GB24 10 ...