4. Configuration
4-16
March 2001
3150-A2-GB24-10
Procedure
To select the link layer protocol:
1. From the top-level menu screen, select Cnfig.
2. Select the configuration option set to be copied into the Edit area by using the
appropriate Function key. Use the scroll keys, if necessary.
3. Select Edit.
4. From the Edit screen, press the
key until the Mgmt selection appears on
the screen.
5. Select Mgmt.
6. From the Mgmt Config screen, select Gen.
7. Press F1 (Next) until the Com Link configuration option appears.
8. Press F2 (PPP) or F3 (SLIP).
F1
F2
F3
Edit:
User Alarm Mgmt
F1
F2
F3
Mgmt Config:
Gen Trap
F1
F2
F3
Com Link:
Next PPP SLIP
Содержание 3151
Страница 1: ...ACCULINK CSU Models 3150 A4 and 3151 Operator s Guide Document No 3150 A2 GB24 10 March 2001 ...
Страница 16: ...About This Guide x March 2001 3150 A2 GB24 10 ...
Страница 28: ...2 Installation 2 8 March 2001 3150 A2 GB24 10 ...
Страница 40: ...3 Using the Front Panel 3 12 March 2001 3150 A2 GB24 10 ...
Страница 66: ...4 Configuration 4 26 March 2001 3150 A2 GB24 10 ...
Страница 74: ...5 Security 5 8 March 2001 3150 A2 GB24 10 ...
Страница 118: ...8 Testing 8 18 March 2001 3150 A2 GB24 10 ...
Страница 120: ...A Front Panel Menu A 2 March 2001 3150 A2 GB24 10 ...
Страница 152: ...C Configuration Options C 30 March 2001 3150 A2 GB24 10 ...
Страница 168: ...E Pin Assignments E 10 March 2001 3150 A2 GB24 10 ...
Страница 192: ...F SNMP MIB Objects F 24 March 2001 3150 A2 GB24 10 ...
Страница 218: ...J Equipment List J 2 March 2001 3150 A2 GB24 10 ...
Страница 228: ...Glossary GL 10 March 2001 3150 A2 GB24 10 ...