340
DP-2330/3030
MAR 2005
Ver.2.1
DP-2310/3010
(27) Release the pre-installed
Harness
from the
Harness Clamp.
(28) Install the
Optional LVPS
.
(29) Secure the
Optional LVPS
with 4 Screws
(XTW3+6LFC).
(30) Connect the
LVS2 Harness
to CN64 on the
Optional LVPS and to CN102 on ACD PC Board.
(31) Secure the
LVS2 Harness
with the Harness
Clamp.
(32) Connect the pre-installed
Harness
to CN65 and
CN66 on the Optional LVPS.
(33) Close the
LVPS Cover
.
(34) Reinstall the
Left Cover
.
(35) Hook the
Base Bracket
and secure with 2 Silver
Thumb Screws (PF4124P023).
Note:
a. Ensure that the Mylar Sheet on the Base Bracket
does not get damaged.
b. It is easier to align the screw holes, if you insert
the Front Screw first.
Содержание Workio DP-3030
Страница 4: ...4 Beispiel DP 2330 3030 Hinweis...
Страница 8: ...8 memo...
Страница 35: ...35 DP 2330 3030 MAR 2005 Ver 2 1 DP 2310 3010 1 6 Control Panel DP 2310 3010 DP 2330 3030...
Страница 70: ...70 DP 2330 3030 MAR 2005 Ver 2 1 DP 2310 3010 23 Remove 3 Screws 19 24 Remove the Motor Bracket 908...
Страница 454: ...memo...
Страница 455: ...88 Panasonic Software Operating Instructions Network Firmware Update Tool Service Tool Version 3 DZSD001829 9...
Страница 470: ...memo...
Страница 471: ...Panasonic Software Operating Instructions Local Firmware Update Tool Service Tool Version 3 DZSD000965 14...
Страница 482: ...Local Firmware Update Tool Parallel USB Port 5b4 Firmware Code File selection is completed Click Next Page 12...
Страница 486: ...DZZSM00270...