100
15. Servicing
Guide
15.1 How to Take Out Front Plate
Please follow the steps below for take out front plate. Before removing the front plate of indoor unit, always switch off
all power supply (i.e. indoor unit power supply, heater power supply and tank unit power supply).
1 Remove the 2 mounting screws which located at bottom of the front plate and 1 mounting screw at the front
of the plate.
2 Gently pull the lower section of the front plate towards you to remove the front plate from left and right hooks.
3 Hold the left edge and right edge of front plate to lift up front plate from hooks.
When reinstalling the
front plate, first set the
2 hooks, which located
at the top of front plate,
into the slots at cabinet.
Then carry out above
steps in the reverse
order.
Hook
Lift up
Screws
Fix the left and right hooks to cabinet
slot properly when reinstall front plate.
15.2 How to Take Out Side Cabinet
Please follow the steps below to remove the side
cabinet. Before removing the front plate of indoor unit
always switch off all power supply (i.e. indoor power
supply, heater power supply and tank unit power
supply).
1 Perform the steps in HOW TO TAKE OUT
FRONT PLATE.
2 Remove all the 13 mounting screws on the left,
right and top of the side cabinet.
3 Gently remove the side cabinet by holding both
of the handles.
15.3 Test
Run
1 Fill up the boiler tank with water. For details refer to boiler tanks installation instruction and operation
instruction.
2 Set ON to the indoor unit and RCCB/ELCB. Then, for control panel’s operation please refers to air-to-water
heatpump’s operation instruction.
3 For normal operation, pressure gauge reading should be in between 0.05 MPa and 0.3 MPa.
If necessary, adjust the water pump speed accordingly to obtain normal water pressure operating range. If
adjust water pump speed cannot solve the problem, contact your local authorized dealer.
4 After test run, please clean the external filter. Reinstall it after finish cleaning.
15.4 Proper Pump Down Procedure [SERVICE MODE: 01]
WARNING
Strictly follow the steps below for proper pump down procedure. Explosion may occur if the steps are not followed as per
sequence.
1
When the heatpump unit is not in operation (standby), press the “SERVICE” switch on control panel to enter SERVICE
mode. Operate the system in Sr : 01 mode for pump down operation.
2
After 10 ~ 15 minutes, (after 1 or 2 minutes in case very low ambient temperatures (< 10°C)), fully close 2 way valve.
3
After 3 minutes, fully close 3 way valve.
4
Press the “OFF/ON” switch on control panel to stop pump down operation.
5
Remove the refrigerant piping.
Содержание WH-SDC12F6E5
Страница 24: ...24 4 2 Outdoor Unit Air inlet rear Air outlet Air inlet side ...
Страница 35: ...35 10 1 2 Solar Printed Circuit Board Optional ...
Страница 63: ...63 57 C 57 C 57 C 57 C ...
Страница 64: ...64 ...
Страница 70: ...70 ...
Страница 71: ...71 ...
Страница 72: ...72 57 C 57 C 50 C 50 C ...