62
15 Maintenance Guide
In order to ensure optimal performance of the unit, checks and inspections on the unit and the field wiring must be carried out
regularly. Please request a licensed technician for carry out maintenance job.
Before carried out any maintenance or repair work, and removing the front plate of heat exchanger unit, always switch off all power
supply (i.e. monobloc unit power supply, heater power supply and sanitary tank power supply).
Below checks must be carried out at least once a year.
1. Water pressure
Water pressure should not lower than 0.05 MPa (with inspects the pressure gauge). If necessary add tap water into boiler
tank. Refer to boiler tank installation instruction for details on how to add water.
2. Pressure relief valve
• Take out the cover with remove the mounting screw for access to the pressure relief valve.
• Check for correction operation of pressure relief valve by turn up the lever to become horizontal. (Refer to figure below)
• If you do not hear a clacking sound (due to water drainage), contact your local authorized dealer.
• Turn down the lever after checking finish.
• In case the water keeps drained out from the unit, switch off the system, and then contact your local authorized dealer.
• Reinstall the cover with tighten the mounting screws properly, if the pressure relief valve is functioning normal.
3. Indoor unit control board area
Thorough visual inspection of the control board and look for defects, i.e. loose connection, melting of wire insulator and etc.
4. RCCB
Ensure the RCCB set to “ON” condition before check RCCB.
Turn on the power supply to the monobloc unit.
This testing could only be done when power is supplied to the monobloc unit.
• Push the “TEST” button on the RCCB. The lever would turn down and indicate “0” and indicate green colour if it functions
normal.
• Contact authorized dealer if the RCCB malfunction.
• Turn off the power supply to the monobloc unit.
• If RCCB functions normal, set the lever to “ON” again after testing finish.
5. How to release the trapped air in water circuit
• Turn up the lever to become horizontal. (Refer to figure “Pressure relief valve”). The trapped air will be drained out together
with water. After few seconds, turn down the lever to stop the water drainage.
• Repeat it until the bubbling sound disappear.
Becareful not to touch parts other than RCCB test button when the power is supplied to
Monobloc Unit
. Else, electrical shock may
happen.
Содержание WH-MXF09D3E5
Страница 10: ...10 4 Location of Controls and Components 4 1 Monobloc Unit ...
Страница 11: ...11 4 1 1 Main Components ...
Страница 13: ...13 ...
Страница 15: ...15 4 1 4 Basic Operation 4 1 5 Advance Operation ...
Страница 16: ...16 4 1 6 Weekly Timer Setting ...
Страница 17: ...17 5 Dimensions 5 1 Monobloc Unit ...
Страница 18: ...18 6 Refrigeration And Water Cycle Diagram ...
Страница 19: ...19 ...
Страница 20: ...20 7 Block Diagram 7 1 WH MXF09D3E5 ...
Страница 21: ...21 7 2 WH MXF12D6E5 ...
Страница 22: ...22 8 Wiring Connection Diagram 8 1 WH MXF09D3E5 ...
Страница 23: ...23 ...
Страница 24: ...24 8 2 WH MXF12D6E5 ...
Страница 25: ...25 ...
Страница 26: ...26 9 Electronic Circuit Diagram 9 1 WH MXF09D3E5 ...
Страница 27: ...27 ...
Страница 28: ...28 9 2 WH MXF12D6E5 ...
Страница 29: ...29 ...
Страница 30: ...30 10 Printed Circuit Board 10 1 Water System 10 1 1 Main Printed Circuit Board ...
Страница 31: ...31 10 1 2 Solar Printed Circuit Board Optional ...
Страница 32: ...32 10 2 Refrigerant System 10 2 1 Main Printed Circuit Board ...
Страница 33: ...33 10 2 1 1 Capacitor Printed Circuit Board 10 2 1 2 Noise Filter Printed Circuit Board ...
Страница 34: ...34 11 Installation Instruction Monobloc Unit Dimension Diagram ...
Страница 55: ...55 ...
Страница 56: ...56 ...
Страница 103: ...103 17 3 To Remove The Cabinet Rear Plate 17 4 To Remove Pressure Gauge 17 5 To Remove RCCB ...
Страница 109: ...109 19 Exploded View and Replacement Parts List 19 1 Refrigerant System ...
Страница 110: ...110 ...
Страница 114: ...114 19 2 Water System ...