4
CAUTION
19. This equipment is strongly recommended to be installed with Residual Current Device (RCD) on-site according to the respective national
wiring rules or country-specific safety measures in terms of residual current.
20. The unit is only for use in a closed water system. Utilization in an open water system may lead to excessive corrosion of the water piping and
risk of incubating bacteria colonies, particularly Legionella, in water.
21. If there is any doubt about the installation procedure or operation, always contact the authorized dealer for advice and information.
22. Select a location where in case of water leakage, the leakage will not cause damage to other properties.
23. When installing electrical equipment at wooden building of metal lath or wire lath, in accordance with electrical facility standard, no electrical
contact between equipment and building is allowed. Insulator must be installed in between.
24. This installation may be subjected to building regulation approval applicable to respective country that may require to notify the local authority
before installation.
25. Any work carried out on the Mono bloc unit after removing the front panel which is secured by screws, must be carried out under the
supervision of authorized dealer and licensed installation contractor.
26. This unit must be properly earthed, the electrical earth must not be connected to a gas pipe, water pipe, the earth of a lightening rod or a
telephone. Otherwise there is a danger of electrical shock in the event of an insulation breakdown or electrical earth fault in the Mono bloc unit.
27. When replace refrigeration circuit components, confirm on usage of specified refrigerant type. Using of refrigerant other than the specified type
may cause product damage, burst and injury etc.
28. Do not add or replace refrigerant other than the specified type. Equipment may damage or deteriorate in safety due to usage of other
refrigerant.
1. Do not install the Mono bloc unit in areas where there is a risk of flammable gas leakage. There is a risk of fire if flammable gas
accumulates near or around the Mono bloc unit.
2. Do not release refrigerant during piping work for installation, re-installation and during repairing a refrigeration parts. Take care of the
liquid refrigerant, it may cause frostbite.
3. Make sure the power supply cord does not contact with hot part (i.e. water piping). High temperature may cause insulator of power
supply cord damage hence electrical shock or fire.
4. Do not touch the sharp aluminum fins or edges of metal parts.
If you are required to handle sharp parts during installation or servicing, please wear hand glove.
Sharp parts may cause injury.
5. Do not apply excessive force to water pipes that may damage the pipes. If water leakage occurs, it will cause flooding and damage to
other properties.
6. Carry out drainage piping as mentioned in installation instructions. If drainage is not perfect, water leakage may happen and may cause
damage to properties of the user.
7. The piping installation work must be flushed before the Mono bloc unit is connected to remove contaminants. Contaminants may damage the
Mono bloc unit components.
8. Select an installation location where it is accessible for maintenance.
9. Power supply connection to Mono bloc unit.
Power supply point should be in easily accessible place for power disconnection in case of emergency.
Must follow local national wiring standard, regulation and this installation instruction.
Strongly recommended to make permanent connection to a circuit breaker. It must be a double pole switch with a minimum 3.0 mm gap.
For 9kW models:
- Use approved 30A circuit breaker for power supply 1
- For electrical heater connection to main for power supply 2 (either or )
Use approved 15A/16A circuit breaker (Backup Heater only)
Use approved 30A circuit breaker (Backup Booster Heater)
For 12kW/14kW/16kW models:
- Use approved 30A circuit breaker for power supply 1
- Use approved 30A circuit breaker for power supply 2
- Use approved 15A/16A circuit breaker for power supply 3
10. Ensure the correct polarity is maintained throughout all wiring. Otherwise, it will cause electrical shock or fire.
11. After installation, the installer is obliged to verify correct operation of the Mono bloc unit. Check the connection point for water leakage during
test run. If leakage occurs, it will cause damage to other properties.
12. Installation work.
Four or more people are required to carry out the installation work. The weight of Mono bloc unit might cause injury if carried by less than four
people.
Содержание WH-MDF12C6E5
Страница 12: ...12 4 Location of Controls and Components 4 1 Mono bloc Unit ...
Страница 13: ...13 4 1 1 Main Components ...
Страница 15: ...15 ...
Страница 16: ...16 ...
Страница 17: ...17 4 1 3 Weekly Timer Setting ...
Страница 18: ...18 4 1 4 Setting Up The Special Functions ...
Страница 19: ...19 5 Dimensions 5 1 Mono bloc Unit ...
Страница 20: ...20 6 Refrigeration and Water Cycle Diagram ...
Страница 21: ...21 ...
Страница 22: ...22 7 Block Diagram ...
Страница 23: ...23 8 Wiring Connection Diagram ...
Страница 24: ...24 ...
Страница 25: ...25 9 Electronic Circuit Diagram ...
Страница 26: ...26 ...
Страница 27: ...27 10 Printed Circuit Board 10 1 Water System 10 1 1 Main Printed Circuit Board ...
Страница 28: ...28 10 1 2 Solar Printed Circuit Board Optional ...
Страница 29: ...29 10 2 Refrigerant System 10 2 1 Main Printed Circuit Board ...
Страница 30: ...30 10 2 2 Capacitor Printed Circuit Board 10 2 3 Noise Filter Printed Circuit Board ...
Страница 31: ...31 11 Installation Instruction Mono Bloc Unit Dimension Diagram ...
Страница 32: ...32 Main Components ...
Страница 42: ...42 ...
Страница 48: ...48 ...
Страница 49: ...49 ...
Страница 59: ...59 ...
Страница 107: ...107 17 3 To Remove The Cabinet Rear Plate 17 4 To Remove Pressure Gauge 17 5 To Remove RCCB ...
Страница 115: ...115 ...
Страница 119: ...119 19 2 WH MDF12C6E5 WH MDF14C6E5 WH MDF16C6E5 WH MDF12C6E5 1 WH MDF14C6E5 1 WH MDF16C6E5 1 Water System ...