76
PAW-VP•LDHW - Technical Manual – 2019-11
Water Piping Installation
4
4.4 Filling procedure
● DO NOT turn on any heat source connected to the storage tank until filling it.
●
Ensure that all installation requirements, electrical and safety, have been met.
●
Check all plumbing and electrical connections are properly connected.
●
Make sure that unused connections are closed with sealing plugs.
● Open the bleed valve on the set which is connected to the kettle and start filling
slowly.
● Let the unit fill, checking the bleeding air from the open tap; let out of the water to
allow the flushing of the pipes.
●
Close the bleed valve.
●
Open the taps remaining to eliminate the residual air in the system.
●
Close all the taps and check for water leaks in the system.
●
Fill any circuits affecting internal heat exchangers to accumulation.
●
Test manually the pressure regulating valve and the safety valves on each hydrau-
lic circuit.
4.5 Emptying procedure
●
Check that the heat source connected to the boiler and any loose electrical con-
nections are off.
●
Disconnect the water supply to the accumulation.
●
Open a bleed valve on the set connected to the boiler to allow the entry of air into
the system.
●
Open the discharge of the system, paying attention to the high temperature of the
exhaust as it could cause damage to property or persons.
4.6 Maintenance procedure
●
Check periodically (at least once a year) the smooth operation of the safety valve.
●
In accumulations of DHW always install a passive cathodic protection (magnesium
anode) or active (impressed current anode) and check periodically, at least twice
a year, wear a sacrificial magnesium anode or the presence of power supply on
the anode impressed current; an anode of magnesium consumed more than 60%
should be replaced.
●
Inspect all water connections for leakage every year.
● Dismantle the flange with the DHW heater and clean the bottom tank internally
every other year if the water quality is poor.
●
Test safety thermostat and check electrical connections for DHW heater every year.
●
Leak search refrigerant connections at the top of the tank for heat pump every
year.
●
Leak search refrigerant hose from double coil every year.
●
Inspect the coil and clean it if necessary every other year.
●
Test run the heat pump and check sensor info parameters.
●
Check outdoor unit procedures referenced to the service manual for outdoor unit.
Содержание PAW-VP1000LDHW
Страница 2: ......
Страница 122: ...122 PAW VP LDHW Technical Manual 2019 11 Appendix A A 2 Spare parts Tanks ...
Страница 123: ...123 PAW VP LDHW Technical Manual 2019 11 Appendix A ...
Страница 124: ...124 PAW VP LDHW Technical Manual 2019 11 Appendix A ...
Страница 125: ...125 PAW VP LDHW Technical Manual 2019 11 Appendix A ...
Страница 126: ...126 PAW VP LDHW Technical Manual 2019 11 Appendix A ...
Страница 132: ......
Страница 133: ......
Страница 134: ...Polar Energi AS Postboks 117 9450 Hamnvik Norway www polarenergi com ...