94
Control
d.
S4: Set to “0–10 V“.
8.
Restore and fasten the upper mounting board in its original position, and close the AHU Kit
enclosure again (see “4.1 Installation of AHU Kit“ – step 5).
Case 3: 0–10 V demand control by an external BMS (available in medium
and advanced version only)
To set the CZ-CAPBC2 PCB (ACC-SP1A) for 0–10 V demand control by an external building
management system (BMS), perfom the following steps:
1.
Open the AHU Kit enclosure (see “4.1 Installation of AHU Kit“ – step 2).
2.
Only in case the setting of switch S3 must be modifi ed, remove the upper mounting board.
Otherwise, proceed with step 3.
a.
On the CZ-CAPBC2 PCB (ACC-SP1A), located on the rear side of the upper mounting
board, set switch S3 to “VOLTAGE” or “NO VOLTAGE”, depending on the BMS digital
input (DI) confi guration.
Control via dry contacts (factory default)
= “NO VOLTAGE”
Control via 12 – 24 V DC signals
= “VOLTAGE”
12 –24 V DC
GND
b. Restore and fasten the upper mounting board in its original position.
Содержание PAW-160MAH2
Страница 3: ...Air Handling Unit Kit Installation Instructions SET AL1 OUT ATU PV SV ºC ºC ...
Страница 4: ......
Страница 99: ...97 ...
Страница 100: ...Notes ...
Страница 101: ...Notes ...