
84
Test Run
6 Test Run
After installation and before operation of the system, perform a test run according to the Test
Run section in the Installation Instructions of the relevant outdoor unit.
If alarm messages are indicated on the outdoor unit PCB (by blinking LEDs) or on the wired
remote controller, refer to the Alarm Messages section in the Installation Instructions for the
relevant outdoor unit.
Содержание PAW-160MAH2
Страница 3: ...Air Handling Unit Kit Installation Instructions SET AL1 OUT ATU PV SV ºC ºC ...
Страница 4: ......
Страница 99: ...97 ...
Страница 100: ...Notes ...
Страница 101: ...Notes ...