Utility
Installation Manual
223
a)
Point to
in the "Card/Port Test Menu" screen and click.
•
"Loop Back Test" screen is displayed.
b)
Specify "External" or "Internal."
c)
Click .
•
Loop Back Test is executed between the Generator 1 and the Receiver 1.
•
After executing the test, the test result is displayed.
Example:
When a T1 card is installed in the Slot No. 105.
[Card/Port Test] DTMF G/R Test - Error Indication Table
Error Message
Description
Card
Applied
PB Generator XX
failure
PB Generator is not functioning properly.
XX: PB Generator No.
BRI, PRI23,
T1
PB Receiver XX
failure
PB Receiver is not functioning properly.
XX: PB Receiver No.
T1
[Card/Port Test] Loop Back Test – Operation
(Continued from step 5 of [Card/Port Test] – Operation (General).)
Содержание KX-TD500
Страница 18: ...Table of Contents 18 Installation Manual ...
Страница 54: ...System Outline 54 Installation Manual ...
Страница 156: ...Installation 156 Installation Manual Note Four CO lines are available for the Caller ID service with one Caller ID card ...
Страница 178: ...Installation 178 Installation Manual ...
Страница 182: ...Maintenance Console Guide 182 Installation Manual 4 Click if you accept License Agreement ...
Страница 208: ...Maintenance Console Guide 208 Installation Manual ...
Страница 271: ...Utility Installation Manual 271 4 Click Capture off The system creates a Log File ...
Страница 272: ...Utility 272 Installation Manual ...